TxDOT contract A00211505 bid tabulation
Bridge Maintenance, IH 27 (IH 27 NB/WESTERN AVE BRG to .). Let by Texas DOT on November 3, 2026, Randall, Amarillo District. 8 bids received; low bid $5,800,486 by Coppell Construction Co., Inc., -0.3% against the engineer's estimate of $5,816,554.
- Owner
- Texas DOT
- Letting
- 03 NOV 2026
- Pay items
- 76
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Coppell Construction Co., Inc. | $5,800,486 | Low | 0.0% |
| 2 | Altus Construction LLC | $5,903,119 | +2.0% | +1.0% |
| 3 | Gibson & Associates, Inc. | $5,999,365 | +3.0% | +3.0% |
| 4 | The Truesdell Corporation | $6,099,099 | +5.0% | +5.0% |
| 5 | Ti-Zack Concrete, LLC | $6,578,367 | +13% | +13% |
| 6 | Ragle Construction, Inc. | $6,853,234 | +18% | +18% |
| 7 | Gilvin-Terrill, LTD. | $7,098,974 | +22% | +22% |
| 8 | THK Construction LLC | $7,169,258 | +24% | +23% |
Engineer's estimate: $5,816,554.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Coppell Construction Co., Inc. | 2. Altus Construction LLC | 3. Gibson & Associates, Inc. | 4. The Truesdell Corporation | 5. Ti-Zack Concrete, LLC | 6. Ragle Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 14 | $50.00 | $380.00 | $120.46 | $100.00 | $65.00 | $143.75 | $110.00 |
| 2 | SP mixes SP-D PG70-28 (344-7056) | TON | 828 | $280.00 | $250.00 | $529.30 | $220.00 | $210.00 | $368.00 | $350.00 |
| 3 | Tack coat (344-7077) | GAL | 784 | $12.00 | $15.00 | $27.56 | $11.00 | $12.00 | $13.80 | $10.00 |
| 4 | Planing asphalt concrete pavement(0" to 4") (354-7034) | SY | 12,642 | $10.00 | $12.00 | $9.42 | $9.90 | $12.50 | $12.65 | $4.00 |
| 5 | Flowable backfill (401-7001) | CY | 5 | $725.00 | $769.63 | $500.00 | $400.00 | $1,150.00 | $800.00 | |
| 6 | Drilled shaft (high mast pole) (60 in) (416-7037) | LF | 210 | $880.00 | $774.45 | $883.30 | $750.00 | $923.45 | $895.95 | |
| 7 | Epoxy waterproof finish (type X) (427-7005) | SF | 5,535 | $11.00 | $8.00 | $3.71 | $8.80 | $9.00 | $17.25 | $10.00 |
| 8 | Concrete structure repair(rapid deck rep(PRT DPT) (429-7004) | SF | 1,582 | $175.00 | $115.00 | $32.40 | $30.00 | $30.50 | $109.25 | $100.00 |
| 9 | Concrete structure repair(rapid deck rep(full DPT)) (429-7006) | SF | 530 | $235.00 | $165.00 | $89.86 | $69.00 | $112.52 | $143.75 | $150.00 |
| 10 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 2,433 | $177.00 | $125.00 | $98.17 | $176.00 | $150.00 | $74.75 | $100.00 |
| 11 | Riprap (concrete)(4 in) (432-7001) | CY | 24.74 | $770.00 | $650.00 | $688.15 | $674.30 | $650.00 | $977.50 | $1,000.00 |
| 12 | Clean and seal existing JTS (strip seal) (438-7014) | LF | 592 | $80.00 | $75.00 | $50.70 | $75.00 | $65.00 | $143.75 | $80.00 |
| 13 | Polyester polymer concrete overlay (2-1/2") (439-7018) | SY | 6,714 | $175.00 | $225.00 | $226.39 | $240.00 | $212.00 | $293.25 | $300.00 |
| 14 | Clean and paint existing STR (ref no. 1) (446-7020) | EACH | 1 | $60,000 | $42,000 | $41,323 | $41,800 | $40,000 | $74,750 | $40,000 |
| 15 | Clean and paint existing STR (ref no. 2) (446-7021) | EACH | 1 | $42,000 | $41,323 | $41,800 | $40,000 | $74,750 | $40,000 | |
| 16 | Retrofit rail (type SSTR) (451-7024) | LF | 1,397 | $200.00 | $195.00 | $194.89 | $238.70 | $210.00 | $201.25 | $340.00 |
| 17 | Pipe (PVC) (schedule 40) (6 in) (481-7013) | LF | 40 | $90.00 | $10.00 | $44.97 | $100.00 | $200.00 | $115.00 | $135.00 |
| 18 | Shot blasting (483-7016) | SY | 6,646 | $8.00 | $9.00 | $11.63 | $5.00 | $3.00 | $10.35 | $3.00 |
| 19 | Adjust steel shoes (499-7001) | EACH | 25 | $7,400.00 | $2,000.00 | $4,264.72 | $5,000.00 | $3,800.00 | $2,875.00 | $7,000.00 |
| 20 | Mobilization (500-7001) | LS | 1 | $480,000 | $565,000 | $587,364 | $515,000 | $829,947 | $106,308 | $680,000 |
| 21 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $25,000 | $20,000 | $36,895 | $14,000 | $2,000.00 | $9,200.00 | $42,000 |
| 22 | Portable changeable message sign (503-7002) | EACH | 2 | $15,000 | $6,409.26 | $19,000 | $13,000 | $14,375 | $25,000 | |
| 23 | TMA (stationary) (505-7001) | DAY | 237 | $265.00 | $150.00 | $197.60 | $250.00 | $250.00 | $97.75 | $290.00 |
| 24 | TMA (mobile operation) (505-7002) | HR | 32 | $150.00 | $250.00 | $28.94 | $84.00 | $150.00 | $63.25 | $64.00 |
| 25 | Construction perimeter fence (506-7034) | LF | 1,200 | $5.00 | $9.00 | $13.05 | $4.13 | $9.00 | $23.00 | $8.50 |
| 26 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 1,125 | $14.00 | $7.00 | $4.58 | $6.60 | $8.00 | $9.20 | $4.00 |
| 27 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,125 | $2.00 | $2.00 | $2.85 | $2.20 | $3.00 | $4.60 | $0.55 |
| 28 | Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017) | LF | 1,080 | $33.00 | $26.00 | $27.51 | $28.33 | $28.00 | $97.75 | $13.00 |
| 29 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 960 | $13.00 | $25.00 | $26.17 | $26.95 | $26.00 | $51.75 | $14.00 |
| 30 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 1,080 | $33.00 | $22.00 | $27.68 | $23.65 | $23.00 | $86.25 | $14.00 |
| 31 | Portable concrete traffic barrier (connection hardware) (512-7070) | EACH | 33 | $30.00 | $40.00 | $42.73 | $44.00 | $44.00 | $172.50 | $165.00 |
| 32 | Permanent CTB (tran SSCB to SSTR) (mod) (514-7038) | LF | 60 | $240.00 | $805.00 | $247.83 | $341.00 | $330.00 | $632.50 | $430.00 |
| 33 | Metal W-beam guard fence (steel post) (540-7002) | LF | 975 | $35.00 | $38.00 | $36.32 | $41.80 | $41.00 | $63.25 | $34.00 |
| 34 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,300.00 | $3,000.00 | $2,670.52 | $3,300.00 | $3,200.00 | $6,325.00 | $2,500.00 |
| 35 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $400.00 | $300.00 | $427.28 | $330.00 | $320.00 | $2,875.00 | $400.00 |
| 36 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,250.00 | $3,800.00 | $3,738.73 | $4,180.00 | $4,100.00 | $6,325.00 | $3,500.00 |
| 37 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 1 | $1,500.00 | $3,000.00 | $1,029.27 | $3,300.00 | $3,200.00 | $17,250 | $2,000.00 |
| 38 | Crash cushion attenuator (stockpile) (545-7003) | EACH | 2 | $1,300.00 | $1,500.00 | $2,136.42 | $1,650.00 | $1,600.00 | $8,050.00 | $1,400.00 |
| 39 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 2 | $13,000 | $12,000 | $20,661 | $13,200 | $13,000 | $33,350 | $13,000 |
| 40 | Remove RD IL asm (bridge mount) (610-7006) | EACH | 4 | $570.00 | $694.34 | $627.00 | $900.00 | $655.50 | $332.82 | |
| 41 | Remove RD IL asm (trans-base) (610-7009) | EACH | 27 | $570.00 | $694.34 | $627.00 | $700.00 | $655.50 | $332.82 | |
| 42 | HI MST IL pole (150 FT)(100 MPH) (613-7006) | EACH | 5 | $70,600 | $76,377 | $77,660 | $77,000 | $81,190 | $66,233 | |
| 43 | LED HI MST IL asm (6 fixt) (type A) (614-7002) | EACH | 5 | $34,000 | $54,479 | $36,663 | $55,000 | $38,330 | $37,426 | |
| 44 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 2,155 | $20.00 | $17.09 | $22.00 | $17.00 | $23.00 | $10.94 | |
| 45 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 1,260 | $33.00 | $24.04 | $35.26 | $24.00 | $36.86 | $37.17 | |
| 46 | Ground box type A (122311)W/apron (624-7002) | EACH | 14 | $2,400.00 | $1,548.90 | $2,568.50 | $1,600.00 | $2,685.25 | $1,598.29 | |
| 47 | Remove electrical services (628-7002) | EACH | 1 | $1,140.00 | $320.46 | $1,254.00 | $400.00 | $1,311.00 | $886.70 | |
| 48 | Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048) | EACH | 1 | $15,000 | $8,705.91 | $16,066 | $9,000.00 | $16,796 | $10,173 | |
| 49 | Elc SRV type A 240/480 100(NS)SS(T)TP(O) (628-7083) | EACH | 1 | $14,000 | $8,393.99 | $14,509 | $9,000.00 | $15,169 | $10,061 | |
| 50 | In bridge MNT clearance sign assembly(type S) (644-7062) | EACH | 6 | $1,737.00 | $5,000.00 | $267.05 | $5,500.00 | $5,500.00 | $2,889.95 | $2,791.02 |
| 51 | Remove BRDG MNT clearance sign assembly (644-7074) | EACH | 4 | $317.00 | $1,300.00 | $2,684.41 | $1,500.00 | $1,400.00 | $287.50 | $277.66 |
| 52 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 52,539 | $0.80 | $1.00 | $1.07 | $1.10 | $1.10 | $1.15 | $1.00 |
| 53 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 30,107 | $0.80 | $1.00 | $1.07 | $1.10 | $1.10 | $1.15 | $1.00 |
| 54 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 970 | $3.00 | $2.25 | $2.40 | $2.48 | $2.50 | $2.59 | $2.25 |
| 55 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 2,010 | $1.20 | $1.75 | $1.77 | $1.83 | $1.80 | $1.91 | $1.66 |
| 56 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 9,084 | $1.20 | $1.75 | $1.77 | $1.83 | $1.80 | $1.91 | $1.66 |
| 57 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 7,162 | $1.20 | $1.75 | $1.77 | $1.83 | $1.80 | $1.91 | $1.66 |
| 58 | Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424) | LF | 741 | $2.25 | $2.40 | $2.48 | $2.50 | $2.59 | $2.25 | |
| 59 | Eliminating existing PM & markers (6") (677-7002) | LF | 27,520 | $0.53 | $1.50 | $1.60 | $1.65 | $1.60 | $1.73 | $1.50 |
| 60 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,951 | $4.41 | $3.00 | $3.21 | $3.30 | $3.50 | $3.45 | $3.00 |
| 61 | Pavement surface preparation for marking (6") (678-7002) | LF | 27,520 | $0.38 | $0.40 | $0.43 | $0.44 | $0.50 | $0.46 | $0.40 |
| 62 | Pavement surface preparation for marking (12") (678-7006) | LF | 1,951 | $1.27 | $0.60 | $0.64 | $0.66 | $0.70 | $0.69 | $0.60 |
| 63 | Replace nuts, washers & other hardware (690-7241) | EACH | 1 | $250.00 | $12,000 | $1,692.04 | $1,500.00 | $1,600.00 | $4,025.00 | $700.00 |
| 64 | Crack cleaning and sealing (JCP) (713-7004) | LF | 1,101 | $25.00 | $31.00 | $21.60 | $33.25 | $20.00 | $33.35 | $21.00 |
| 65 | Drain inlet cleaning (764-7001) | EACH | 12 | $300.00 | $665.00 | $158.09 | $325.00 | $350.00 | $632.50 | $400.00 |
| 66 | Downspout cleaning (764-7004) | EACH | 12 | $73.00 | $725.00 | $24.72 | $350.00 | $375.00 | $517.50 | $121.25 |
| 67 | Rep steel bridge MBR (weld repair) (784-7022) | EACH | 1 | $7,266.00 | $25,000 | $2,506.65 | $2,500.00 | $5,500.00 | $40,250 | $1,000.00 |
| 68 | Replacing elastomeric bearing pads (787-7001) | EACH | 64 | $1,600.00 | $1,313.56 | $4,050.00 | $6,600.00 | $4,025.00 | $3,000.00 | |
| 69 | Concrete beam repair (788-7001) | EACH | 6 | $8,500.00 | $3,641.56 | $5,800.00 | $8,500.00 | $2,070.00 | $5,000.00 | |
| 70 | Concrete beam repair (CFRP) (788-7002) | EACH | 9 | $8,000.00 | $4,141.78 | $5,800.00 | $7,000.00 | $12,650 | $7,000.00 | |
| 71 | Steel bridge zone painting (4010-7021) | SF | 4,590 | $65.00 | $46.00 | $48.95 | $49.51 | $46.00 | $67.85 | $76.97 |
| 72 | Install bridge identification numbers (4019-7001) | EACH | 4 | $485.00 | $350.00 | $587.52 | $605.00 | $160.00 | $977.50 | $650.00 |
| 73 | Prefb PV MK W/wnty type B (W)(6")(solid) (6064-7002) | LF | 4,362 | $9.50 | $9.00 | $9.61 | $9.90 | $9.50 | $10.35 | $9.00 |
| 74 | Prefb PV MK W/wnty type B(W)6"(broken)CNTST (6064-7003) | LF | 1,050 | $11.76 | $15.50 | $16.02 | $17.05 | $16.00 | $17.83 | $15.50 |
| 75 | Prefb PV MK W/wnty type B (Y)(6")(solid) (6064-7006) | LF | 3,852 | $9.50 | $9.00 | $9.61 | $9.90 | $9.50 | $10.35 | $9.00 |
| 76 | Aluminum electrical cond (#4 XHHW) (6071-7001) | LF | 11,175 | $2.00 | $3.04 | $2.09 | $3.00 | $2.19 | $1.72 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 3, 2026. Compiled by Mirage Metrics.