Ragle Construction, Inc.: TxDOT bid record
Ragle Construction, Inc. submitted 373 bids on Texas DOT contracts in the data, from 11 FEB 2020 to 04 NOV 2026, and was the low bidder on 64 of them (17%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $539,304,611
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 30 | 5 | 17% |
| 2021 | 47 | 8 | 17% |
| 2022 | 32 | 6 | 19% |
| 2023 | 41 | 12 | 29% |
| 2024 | 38 | 7 | 18% |
| 2025 | 79 | 14 | 18% |
| 2026 | 106 | 12 | 11% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Houston District | 70 | 7 | 10% |
| Dallas District | 70 | 12 | 17% |
| Fort Worth District | 53 | 13 | 25% |
| Odessa District | 44 | 10 | 23% |
| Beaumont District | 32 | 6 | 19% |
| Yoakum District | 21 | 5 | 24% |
| Amarillo District | 10 | 1 | 10% |
| San Angelo District | 9 | 3 | 33% |
| Abilene District | 8 | 1 | 13% |
| Lufkin District | 6 | 0 | 0% |
| Corpus Christi District | 6 | 1 | 17% |
| Waco District | 5 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 217 | 93 (43%) | $1.25 | $1.40 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 160 | 89 (56%) | $5.28 | $5.00 |
| Reflectorized pavement marker type II-C-R | 672-7006 | EACH | 143 | 88 (62%) | $5.00 | $5.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 206 | 82 (40%) | $1.00 | $1.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 163 | 78 (48%) | $3,050.00 | $3,245.00 |
| Pavement surface preparation for marking (6") | 678-7002 | LF | 142 | 76 (54%) | $0.23 | $0.18 |
| Temporary sediment control fence (install) | 506-7039 | LF | 205 | 72 (35%) | $3.55 | $4.00 |
| Cem stabil BKFL | 400-7010 | CY | 138 | 70 (51%) | $127.50 | $200.00 |
| Remove metal beam guard fence | 542-7001 | LF | 168 | 68 (40%) | $3.00 | $3.00 |
| Metal beam guard fence trans (thrie-beam) | 540-7005 | EACH | 131 | 59 (45%) | $1,985.00 | $2,140.00 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 118 | 59 (50%) | $24.57 | $27.00 |
| Concrete structure repair (vertical & overhead) | 429-7007 | SF | 112 | 59 (53%) | $150.00 | $220.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gibson & Associates, Inc. | 74 | 40 of 74 |
| Ed Bell Construction Company | 62 | 35 of 62 |
| Built Right Construction of Oklahoma, LLC | 60 | 15 of 60 |
| FNH Construction, LLC | 55 | 13 of 55 |
| SCR Civil Construction, LLC | 53 | 23 of 53 |
| Isi Contracting, Inc. | 47 | 27 of 47 |
| Southern Road & Bridge, LLC | 45 | 11 of 45 |
| Structural Integrity Group LLC | 42 | 22 of 42 |
| Altus Construction LLC | 38 | 15 of 38 |
| Garret Shields Infrastructure | 35 | 26 of 35 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00223826 | Childress District | BRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans) | 7 of 16 | $974,424 | +39% |
| 03 NOV 2026 | A00190779 | El Paso District | Repair Roadway, SL 375 (IH 10 DESERT NORTH to TOM MAYS PARK) | 6 of 6 | $15,575,442 | +31% |
| 03 NOV 2026 | A00211095 | Odessa District | Bridge Maintenance, US 90 (AT 19.6 MI E OF SH 349 to .) | 7 of 7 | $3,982,565 | +38% |
| 03 NOV 2026 | A00223831 | Childress District | BRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans) | 11 of 15 | $1,358,064 | +71% |
| 03 NOV 2026 | A00223911 | Odessa District | MILL AND INLAY, IH0020 (VARIOUS to VARIOUS) | 1 of 4 | $1,285,507 | Low, 12% under the second |
| 03 NOV 2026 | A00211505 | Amarillo District | Bridge Maintenance, IH 27 (IH 27 NB/WESTERN AVE BRG to .) | 6 of 8 | $6,853,234 | +18% |
| 07 OCT 2026 | A00135746 | Dallas District | Construct Pedestrian Infrastructure, IH 35E (DART Victory Station to At IH 35E Southbound Frontage Roads) | 3 of 9 | $1,186,545 | +1.0% |
| 07 OCT 2026 | A00132124 | Lufkin District | Intersection Improvements With Right And/Or Left Turn Lanes, US 69 (0.9 mi N of FM 841 to 0.5 mi W of FM 1475) | 6 of 7 | $46,841,741 | +47% |
| 07 OCT 2026 | A00191892 | Odessa District | Bridge Replacement, US 90 (Sanderson Canyon and Union Pacific RR to .) | 7 of 7 | $10,957,176 | +62% |
| 07 OCT 2026 | A00217666 | Houston District | Rehabilitate Bridge, Various (Various Locations on IH 45, IH 610, to US 290, and FM 1458) | 1 of 6 | $4,064,176 | Low, 14% under the second |
| 07 OCT 2026 | A00211436 | Amarillo District | Bridge Maintenance, IH 27 (IH 27 NB/SH 217 BRG to .) | 4 of 5 | $4,465,749 | +14% |
| 07 OCT 2026 | A00196909 | Dallas District | Hazard Elimination & Safety, IH 45 (South of Risinger Rd to Dallas County Line) | 5 of 8 | $4,779,478 | +27% |
| 06 OCT 2026 | A00222733 | Lufkin District | Bridge Maintenance, Various (Various Locations Districtwide to .) | 4 of 5 | $4,648,800 | +42% |
| 03 SEP 2026 | A00184830 | Amarillo District | Bridge Replacement, IH 40 (IH 40 AT SH 207 to .) | 6 of 7 | $13,026,104 | +32% |
| 03 SEP 2026 | A00191741 | Houston District | Construct Pedestrian Infrastructure, FM 3005 (SS 342 (61st Street) to Cove View Blvd) | 7 of 7 | $3,517,679 | +69% |
| 03 SEP 2026 | A00221262 | San Angelo District | BRIDGE PREVENTATIVE MAINTENANCE, SH0208 (VARIOUS LOCATIONS IN SAN ANGELO DISTRICT to VARIOUS LOCATIONS IN SAN ANGELO DISTRICT) | 9 of 11 | $1,720,028 | +24% |
| 02 SEP 2026 | A00192185 | Houston District | Bridge Replacement, FM 2004 (At Highland Bayou to .) | 9 of 11 | $3,992,820 | +25% |
| 02 SEP 2026 | A00207336 | Houston District | Intersection Improvement, FM 518 (At FM 528 to .) | 4 of 4 | $789,523 | +111% |
| 02 SEP 2026 | A00200023 | Fort Worth District | Replace Guardrail, Various (VARIOUS LOCATIONS to WITHIN FORT WORTH DISTRICT) | 11 of 11 | $5,872,430 | +61% |
| 02 SEP 2026 | A00207438 | Wichita Falls District | Bridge Replacement, HOWARD RD (CR 194 (Signed Howard Rd) to at North Fork Village Creek and at Draw) | 5 of 6 | $4,158,433 | +48% |
| 02 SEP 2026 | A00193937 | Dallas District | Intersection Improvement, SH 34 (At Abner Rd to .) | 7 of 7 | $1,991,063 | +107% |
| 18 AUG 2026 | A00219513 | Houston District | BRIDGE PREVENTATIVE MAINTENANCE, US0290 (Various Highways in W. Harris & FT. Bend to -) | 5 of 6 | $2,478,899 | +56% |
| 06 AUG 2026 | A00191470 | Houston District | Construct Frontage Roads, SH 99 (Fry Road to Westheimer Parkway) | 7 of 9 | $38,464,170 | +18% |
| 06 AUG 2026 | A00192187 | Beaumont District | Bridge Replacement, CR 398 (AT LEE GULLY to EXISTING (STR#200360AA0184001)) | 6 of 6 | $2,573,312 | +54% |
| 06 AUG 2026 | A00199843 | Odessa District | Rehabilitate Existing Roadway, FM 2448 (SH 17 to IH 10) | 5 of 5 | $10,673,571 | +24% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.