TxDOT contract A00190779 bid tabulation
Repair Roadway, SL 375 (IH 10 DESERT NORTH to TOM MAYS PARK). Let by Texas DOT on November 3, 2026, El Paso, El Paso District. 6 bids received; low bid $11,850,861 by Allen Concrete, LLC, -19% against the engineer's estimate of $14,597,735.
- Owner
- Texas DOT
- Letting
- 03 NOV 2026
- Pay items
- 102
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Allen Concrete, LLC | $11,850,861 | Low | -19% |
| 2 | Dan Williams Company | $12,383,611 | +4.0% | -15% |
| 3 | Jordan Foster Construction, LLC | $13,183,383 | +11% | -10% |
| 4 | Allied Paving Co. | $13,805,455 | +16% | -5.0% |
| 5 | International Eagle Enterprises, Inc. | $14,295,311 | +21% | -2.0% |
| 6 | Ragle Construction, Inc. | $15,575,442 | +31% | +7.0% |
Engineer's estimate: $14,597,735.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Allen Concrete, LLC | 2. Dan Williams Company | 3. Jordan Foster Construction, LLC | 4. Allied Paving Co. | 5. International Eagle Enterprises, Inc. | 6. Ragle Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A or B)(vehicle) (134-7009) | CY | 1,291 | $86.49 | $55.00 | $35.00 | $60.00 | $44.68 | $175.00 | $126.00 |
| 2 | Emuls asphalt (erosion control)(multi) (314-7018) | GAL | 2,325 | $4.00 | $7.00 | $8.50 | $7.00 | $2.81 | $8.00 | $17.00 |
| 3 | D-GR HMA type D PG64-22 (level-UP) (341-7046) | TON | 1,299 | $150.00 | $760.00 | $145.00 | $110.00 | $111.28 | $105.00 | $150.00 |
| 4 | Stone-MTRX-asphalt SMA-C sac-A PG76-22 (346-7001) | TON | 27,637 | $163.33 | $32.00 | $136.50 | $140.00 | $183.04 | $151.00 | $155.00 |
| 5 | Flexible pavement structure repair(5") (351-7004) | SY | 152,427 | $37.00 | $35.00 | $32.00 | $29.75 | $28.86 | $31.50 | $38.50 |
| 6 | Plan & text concrete pavement(0" to 0.75") (354-7024) | SY | 1,740 | $15.00 | $11.00 | $5.60 | $2.08 | $45.00 | $16.20 | |
| 7 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 22,728 | $3.00 | $7.55 | $2.10 | $1.55 | $1.26 | $2.75 | $2.61 |
| 8 | Planing asphalt concrete pavement(3") (354-7052) | SY | 167,496 | $3.65 | $3.50 | $2.00 | $2.10 | $1.15 | $2.50 | $2.10 |
| 9 | Concrete structure repair(rapid deck rep(PRT DPT) (429-7004) | SF | 10 | $650.00 | $400.00 | $420.00 | $93.60 | $500.00 | $200.00 | |
| 10 | Concrete structure repair(rapid deck rep(full DPT)) (429-7006) | SF | 19 | $275.00 | $475.00 | $450.00 | $106.08 | $600.00 | $300.00 | |
| 11 | Concrete structure repair(rapid vert and overhead) (429-7008) | SF | 5 | $350.00 | $400.00 | $425.00 | $139.36 | $600.00 | $250.00 | |
| 12 | Cleaning and sealing existing joints (438-7001) | LF | 1,234 | $12.00 | $55.00 | $65.00 | $58.14 | $45.00 | $30.00 | |
| 13 | Polyester polymer concrete overlay (3/4") (439-7015) | SY | 18,379 | $98.00 | $87.00 | $95.10 | $97.76 | $123.50 | $90.00 | |
| 14 | Adjusting manholes (479-7001) | EACH | 1 | $1,600.00 | $2,500.00 | $1,600.00 | $2,600.00 | $478.40 | $2,000.00 | $3,500.00 |
| 15 | Shot blasting (483-7016) | SY | 18,379 | $4.50 | $3.70 | $4.30 | $4.16 | $4.50 | $2.70 | |
| 16 | Mobilization (500-7001) | LS | 1 | $250,000 | $689,036 | $375,000 | $1,236,379 | $1,040,000 | $850,000 | $1,460,000 |
| 17 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $15,000 | $14,250 | $20,000 | $21,000 | $15,600 | $15,000 | $50,000 |
| 18 | Portable changeable message sign (503-7001) | DAY | 56 | $150.00 | $130.00 | $150.00 | $86.00 | $52.00 | $100.00 | $150.00 |
| 19 | TMA (stationary) (505-7001) | DAY | 144 | $225.00 | $540.00 | $250.00 | $345.00 | $234.00 | $200.00 | $350.00 |
| 20 | TMA (mobile operation) (505-7003) | DAY | 74 | $332.00 | $570.00 | $575.00 | $402.00 | $494.00 | $400.00 | $655.00 |
| 21 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,512 | $5.65 | $4.50 | $8.75 | $5.00 | $10.40 | $15.00 | $10.00 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,512 | $1.75 | $1.50 | $2.30 | $2.00 | $3.64 | $1.00 | $3.50 |
| 23 | Concrete curb (type II) (529-7002) | LF | 100 | $45.00 | $40.00 | $40.00 | $40.00 | $26.00 | $35.00 | $50.00 |
| 24 | Downstream anchor terminal section (540-7015) | EACH | 19 | $1,800.00 | $2,000.00 | $2,200.00 | $1,750.00 | $2,184.00 | $2,800.00 | $2,500.00 |
| 25 | Remove terminal anchor section (542-7002) | EACH | 19 | $315.00 | $975.00 | $325.00 | $950.00 | $537.68 | $850.00 | $400.00 |
| 26 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 10 | $900.00 | $1,100.00 | $1,450.00 | $1,700.00 | $861.12 | $1,800.00 | $1,200.00 |
| 27 | Remove SM RD SN sup&AM (644-7073) | EACH | 7 | $126.00 | $350.00 | $190.00 | $300.00 | $44.72 | $350.00 | $150.00 |
| 28 | Replace delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7160) | EACH | 168 | $30.00 | $35.00 | $45.00 | $25.00 | $39.00 | $35.00 | $150.00 |
| 29 | Replace delineator assembly (D-SW)SZ 1(BRF)CTB (658-7177) | EACH | 1,186 | $30.00 | $38.00 | $32.00 | $7.50 | $5.46 | $29.00 | $25.00 |
| 30 | Replace delineator assembly (D-SY)SZ 1(yflx)GF2 (658-7186) | EACH | 222 | $30.00 | $45.00 | $45.00 | $21.00 | $31.98 | $30.00 | $25.00 |
| 31 | Replace delineator assembly (D-SY)SZ 1(BRF)CTB (658-7201) | EACH | 241 | $30.00 | $45.00 | $32.00 | $7.50 | $5.36 | $30.00 | $25.00 |
| 32 | Replace delineator assembly (D-SY)SZ 6(BRF)CAB3(BI) (658-7211) | EACH | 499 | $30.00 | $70.00 | $45.00 | $35.00 | $45.76 | $30.00 | $50.00 |
| 33 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 9,024 | $0.33 | $0.75 | $0.35 | $0.36 | $0.36 | $0.43 | $0.35 |
| 34 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 435 | $3.00 | $4.20 | $3.50 | $3.60 | $3.64 | $4.27 | $3.50 |
| 35 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,860 | $1.80 | $5.00 | $2.40 | $3.00 | $2.08 | $3.00 | $1.00 |
| 36 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 55 | $5.68 | $2.40 | $9.50 | $1.04 | $3.00 | $1.00 | |
| 37 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 756 | $0.75 | $1.50 | $0.90 | $0.92 | $0.94 | $1.10 | $0.90 |
| 38 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 708 | $1.20 | $2.38 | $1.25 | $1.30 | $1.30 | $1.52 | $1.25 |
| 39 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 9,062 | $1.35 | $1.50 | $1.25 | $1.30 | $1.30 | $1.52 | $1.25 |
| 40 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 2,695 | $3.00 | $5.82 | $4.85 | $5.00 | $5.04 | $5.91 | $4.85 |
| 41 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 2,254 | $7.08 | $10.20 | $8.50 | $8.65 | $8.84 | $10.36 | $8.50 |
| 42 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 50 | $180.23 | $225.00 | $185.00 | $188.00 | $192.40 | $225.48 | $185.00 |
| 43 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 22 | $223.05 | $290.00 | $240.00 | $244.00 | $249.60 | $292.52 | $240.00 |
| 44 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 12 | $250.00 | $530.00 | $440.00 | $447.00 | $457.60 | $536.28 | $440.00 |
| 45 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 54 | $213.82 | $280.00 | $230.00 | $234.00 | $239.20 | $280.33 | $230.00 |
| 46 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 9 | $1,000.00 | $660.00 | $550.00 | $560.00 | $572.00 | $670.35 | $550.00 |
| 47 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 9 | $1,200.00 | $840.00 | $700.00 | $711.00 | $728.00 | $853.17 | $700.00 |
| 48 | Reflectorized pavement marking type I (W)(bike arrow)(100MIL) (666-7093) | EACH | 4 | $164.93 | $180.00 | $150.00 | $152.50 | $156.00 | $182.82 | $150.00 |
| 49 | Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099) | EACH | 4 | $247.91 | $280.00 | $230.00 | $234.00 | $239.20 | $280.33 | $230.00 |
| 50 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 388 | $0.79 | $0.45 | $0.35 | $0.36 | $0.36 | $0.43 | $0.35 |
| 51 | Reflectorized pavement marking type II (W) 8" (DOT) (666-7177) | LF | 807 | $0.56 | $0.50 | $0.40 | $0.41 | $0.42 | $0.49 | $0.40 |
| 52 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 7,591 | $0.56 | $0.50 | $0.40 | $0.41 | $0.42 | $0.49 | $0.40 |
| 53 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 210 | $3.00 | $3.60 | $3.00 | $3.10 | $3.12 | $3.66 | $3.00 |
| 54 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 2,003 | $5.00 | $6.00 | $5.00 | $5.10 | $5.20 | $6.09 | $5.00 |
| 55 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 42 | $86.57 | $135.00 | $110.00 | $112.00 | $114.40 | $134.07 | $110.00 |
| 56 | Reflectorized pavement marking type II (W) (double arrow) (666-7187) | EACH | 22 | $110.00 | $168.00 | $140.00 | $142.25 | $145.60 | $170.63 | $140.00 |
| 57 | Reflectorized pavement marking type II (W) (uturn arrow) (666-7189) | EACH | 12 | $230.72 | $270.00 | $225.00 | $229.00 | $234.00 | $274.23 | $225.00 |
| 58 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 48 | $91.57 | $150.00 | $125.00 | $127.00 | $130.00 | $152.35 | $125.00 |
| 59 | Reflectorized pavement marking type II (W) (entr gore) (666-7195) | EACH | 3 | $408.00 | $360.00 | $300.00 | $305.00 | $312.00 | $365.65 | $300.00 |
| 60 | Reflectorized pavement marking type II (W) (exit gore) (666-7196) | EACH | 2 | $500.00 | $540.00 | $450.00 | $457.50 | $468.00 | $548.47 | $450.00 |
| 61 | Reflectorized pavement marking type II (W) (bike arrow) (666-7203) | EACH | 2 | $139.31 | $150.00 | $125.00 | $127.00 | $130.00 | $152.35 | $125.00 |
| 62 | Reflectorized pavement marking type II (W) (bike symbol) (666-7205) | EACH | 2 | $150.00 | $150.00 | $125.00 | $127.00 | $130.00 | $152.35 | $125.00 |
| 63 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 38,565 | $1.20 | $1.45 | $1.20 | $1.25 | $1.25 | $1.46 | $1.20 |
| 64 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 39,281 | $1.20 | $1.45 | $1.20 | $1.25 | $1.25 | $1.46 | $1.20 |
| 65 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 16,470 | $0.80 | $1.08 | $0.90 | $0.95 | $0.94 | $1.10 | $0.90 |
| 66 | Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424) | LF | 954 | $3.19 | $5.85 | $4.85 | $5.00 | $5.04 | $5.91 | $4.85 |
| 67 | Reflectorized pavement marking type II (W)6"(broken)(020 mil) (666-7531) | LF | 5,150 | $0.25 | $0.50 | $0.40 | $0.41 | $0.42 | $0.49 | $0.40 |
| 68 | Reflectorized pavement marking type II (W)6"(solid)(020 mil) (666-7533) | LF | 5,899 | $0.25 | $0.50 | $0.40 | $0.41 | $0.42 | $0.49 | $0.40 |
| 69 | Reflectorized pavement marking type II (Y)6"(solid)(020 mil) (666-7537) | LF | 3,937 | $0.25 | $0.50 | $0.40 | $0.41 | $0.42 | $0.49 | $0.40 |
| 70 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 480 | $18.20 | $12.60 | $10.50 | $10.75 | $10.92 | $12.80 | $10.50 |
| 71 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 250 | $13.50 | $11.00 | $11.20 | $11.44 | $13.41 | $11.00 | |
| 72 | Prefabricated PM type C (W)(6")(solid) (668-7080) | LF | 1,000 | $5.04 | $4.20 | $4.30 | $4.37 | $5.12 | $4.20 | |
| 73 | Prefabricated PM type C (Y)(6")(solid) (668-7123) | LF | 1,000 | $5.04 | $4.20 | $4.30 | $4.37 | $5.12 | $4.20 | |
| 74 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 58 | $5.98 | $7.20 | $6.00 | $6.10 | $6.24 | $7.31 | $6.00 |
| 75 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 978 | $5.25 | $7.20 | $6.00 | $6.10 | $6.24 | $7.31 | $6.00 |
| 76 | Eliminating existing PM & markers (6") (677-7002) | LF | 21,496 | $1.20 | $0.60 | $0.50 | $0.51 | $0.52 | $0.61 | $0.50 |
| 77 | Eliminating existing PM & markers (8") (677-7004) | LF | 7,312 | $0.91 | $0.70 | $0.55 | $0.56 | $0.57 | $0.67 | $0.55 |
| 78 | Eliminating existing PM & markers (12") (677-7006) | LF | 566 | $3.50 | $2.50 | $2.00 | $2.05 | $2.08 | $2.44 | $2.00 |
| 79 | Eliminating existing PM & markers (24") (677-7008) | LF | 1,739 | $3.10 | $3.60 | $3.00 | $3.05 | $3.12 | $3.66 | $3.00 |
| 80 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 42 | $58.62 | $96.00 | $80.00 | $81.50 | $83.20 | $97.51 | $80.00 |
| 81 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 22 | $75.58 | $108.00 | $90.00 | $91.50 | $93.60 | $109.69 | $90.00 |
| 82 | Eliminating existing PM & markers (uturn arrow) (677-7012) | EACH | 12 | $71.59 | $156.00 | $130.00 | $132.25 | $135.20 | $158.45 | $130.00 |
| 83 | Eliminating existing PM & markers (word) (677-7015) | EACH | 48 | $87.05 | $135.00 | $110.00 | $112.00 | $114.40 | $134.07 | $110.00 |
| 84 | Eliminating existing PM & markers (entr gore) (677-7016) | EACH | 3 | $490.42 | $435.00 | $360.00 | $366.00 | $374.40 | $438.77 | $350.00 |
| 85 | Eliminating existing PM & markers (exit gore) (677-7017) | EACH | 4 | $594.00 | $900.00 | $750.00 | $762.00 | $780.00 | $914.11 | $750.00 |
| 86 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 43 | $21.13 | $60.00 | $45.00 | $46.00 | $46.80 | $54.85 | $45.00 |
| 87 | Eliminating existing PM & marks (bike arrow) (677-7025) | EACH | 2 | $87.21 | $130.00 | $105.00 | $107.00 | $109.20 | $127.98 | $105.00 |
| 88 | Eliminating existing PM & marks (bike symbol) (677-7027) | EACH | 2 | $75.00 | $130.00 | $105.00 | $107.00 | $109.20 | $127.98 | $105.00 |
| 89 | Eliminating existing PM & markers (rumble strip) (677-7030) | LF | 480 | $3.51 | $8.00 | $4.00 | $0.51 | $20.80 | $2.00 | $1.50 |
| 90 | Pavement surface preparation for marking (6") (678-7002) | LF | 17,518 | $0.19 | $0.20 | $0.15 | $0.16 | $0.16 | $0.18 | $0.15 |
| 91 | Pavement surface preparation for marking (8") (678-7004) | LF | 7,312 | $0.30 | $0.25 | $0.20 | $0.21 | $0.21 | $0.24 | $0.20 |
| 92 | Pavement surface preparation for marking (12") (678-7006) | LF | 210 | $0.32 | $1.50 | $1.00 | $1.05 | $1.04 | $1.22 | $1.00 |
| 93 | Pavement surface preparation for marking (24") (678-7008) | LF | 1,898 | $0.95 | $1.60 | $1.25 | $1.30 | $1.30 | $1.52 | $1.25 |
| 94 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 42 | $36.00 | $25.00 | $20.00 | $20.50 | $20.80 | $24.38 | $20.00 |
| 95 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 22 | $47.00 | $30.00 | $25.00 | $25.50 | $26.00 | $30.47 | $25.00 |
| 96 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 12 | $25.50 | $36.00 | $30.00 | $30.50 | $31.20 | $36.56 | $30.00 |
| 97 | Pavement surface preparation for marking (word) (678-7016) | EACH | 48 | $42.00 | $30.00 | $25.00 | $25.50 | $26.00 | $30.47 | $25.00 |
| 98 | Pavement surface preparation for marking (entr gore) (678-7017) | EACH | 1 | $230.72 | $120.00 | $100.00 | $102.00 | $104.00 | $121.88 | $100.00 |
| 99 | Pavement surface preparation for marking (exit gore) (678-7018) | EACH | 2 | $335.00 | $250.00 | $200.00 | $203.50 | $208.00 | $243.76 | $200.00 |
| 100 | Pavement surface preparation for marking (bike arrow) (678-7026) | EACH | 2 | $29.42 | $25.00 | $20.00 | $20.50 | $20.80 | $24.38 | $20.00 |
| 101 | Pavement surface preparation for marking (bike symbol) (678-7028) | EACH | 2 | $34.03 | $25.00 | $20.00 | $20.50 | $20.80 | $24.38 | $20.00 |
| 102 | Membrane underseal (3005-7001) | GAL | 41,874 | $5.50 | $8.00 | $5.00 | $6.60 | $6.03 | $8.00 | $8.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 3, 2026. Compiled by Mirage Metrics.