Southern Road & Bridge, LLC submitted 95 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 04 NOV 2026, and was the low bidder on 5 of them (5%). When it was not low, its total sat a median +69% above the low bid.

Owner
Texas DOT
Low bid volume
$30,367,806
Latest bid
04 NOV 2026
Data through
19 NOV 2026
95Bids
5Low bids
5Win rate, percent
+69%Median gap to the low bid when not low, 84 bids

By year

YearBidsLow bidsWin rate
20201616%
2021800%
2022400%
2023800%
20241417%
20252628%
20261915%
Southern Road & Bridge, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Houston District15213%
Dallas District800%
Austin District700%
Yoakum District700%
Beaumont District6117%
Bryan District500%
Paris District500%
Tyler District5120%
Amarillo District400%
Odessa District400%
San Angelo District400%
Pharr District3133%
Southern Road & Bridge, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
TMA (stationary)505-7001DAY7025 (36%)$250.00$230.00
Barricades, signs and traffic handling502-7001MO8311 (13%)$12,500$5,000.00
Portable changeable message sign503-7001DAY3210 (31%)$75.00$100.00
TMA (mobile operation)505-7003DAY298 (28%)$500.00$291.17
Crash cushion attenuator (install)(S)(N)(TL3)545-7014EACH276 (22%)$12,000$9,000.00
Portable changeable message sign503-7002EACH305 (17%)$13,750$10,000
One-way traffic control (port traffic signal)510-7003MO145 (36%)$5,500.00$5,500.00
Riprap (concrete)(4 in)432-7001CY125 (42%)$817.50$650.00
Remove metal beam guard fence542-7001LF264 (15%)$5.00$3.00
Concrete structure repair(clean & coat WTH epoxy)429-7001SF184 (22%)$311.50$195.00
Riprap (concrete)(5 in)432-7002CY64 (67%)$450.00$640.65
Temporary sediment control fence (install)506-7039LF283 (11%)$5.00$4.00
Southern Road & Bridge, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Southern Road & Bridge, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 NOV 2026A00223826Childress DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans)15 of 16$1,958,205+179%
03 NOV 2026A00219553Austin DistrictBRIDGE PREVENTATIVE MAINTENANCE, RM2222 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT)13 of 13$2,969,200+175%
03 NOV 2026A00223831Childress DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans)14 of 15$2,142,410+170%
07 OCT 2026A00217666Houston DistrictRehabilitate Bridge, Various (Various Locations on IH 45, IH 610, to US 290, and FM 1458)3 of 6$5,823,634+43%
06 OCT 2026A00211479Austin DistrictBridge Maintenance, US 79 (US 79 at Drain to #14-246-0-0204-01-008.)14 of 14$1,501,594+336%
06 OCT 2026A00220834Laredo DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0035 (Various to Various)8 of 8$2,733,230+120%
06 OCT 2026A00222733Lufkin DistrictBridge Maintenance, Various (Various Locations Districtwide to .)5 of 5$5,380,000+65%
02 JUL 2026A00211588Lufkin DistrictBridge Maintenance, US 190 (US 190 at Trinity River to .)2 of 8$3,429,809+3.0%
02 JUL 2026A00186990San Antonio DistrictRehabilitate Bridge, AUGUSTA (On Augusta St. to At San Antonio River)4 of 7$4,492,012+36%
01 JUL 2026A00215377Houston DistrictBridge Maintenance, Various (Various Locations in Harris County to .)8 of 8$3,298,400+114%
03 JUN 2026A00214818Bryan DistrictBridge Maintenance, SH 75 (At N Bedias Creek to .)7 of 7$780,010+319%
07 MAY 2026A00207724Abilene DistrictBridge Maintenance, US 83 (US 83 SB to @ BU 84 UPRR)14 of 14$7,360,057+84%
08 APR 2026A00211509Amarillo DistrictBridge Maintenance, SH 70 (SH 70/N FORK RED RIVER BRG to .)8 of 8$6,577,783+116%
07 APR 2026A00200689Tyler DistrictBridge Maintenance, Various (Various Locations to in the Tyler District)11 of 11$6,642,746+234%
05 MAR 2026A00197284Austin DistrictBridge Maintenance, Various (Various Bridge locations: Burnet to Blanco, Gillespie, Llano & Mason)13 of 14$2,807,140+75%
05 MAR 2026A00209676Houston DistrictRehabilitate Bridge, Various (Various Locations on IH 45 and IH 610 to .)1 of 6$4,927,653Low, 4.0% under the second
07 JAN 2026A00134330Beaumont DistrictBridge Maintenance, Various (DISTRICT WIDE to JEFF, JASP, HARD, ORANGE, TYLER, NEWTON)3 of 7$1,865,560+253%
07 JAN 2026A00187815Odessa DistrictBridge Maintenance, Various (Districtwide to .)12 of 12$3,855,482+133%
06 JAN 2026A00211861Bryan DistrictBridge Maintenance, BS 6S (BS 6 NB to at SH 6 SB)6 of 8$4,221,911+49%
03 DEC 2025A00198503Houston DistrictRehabilitate Bridge, UA 90 (UA 90 WB at Brazos River to .)4 of 7$1,058,783+90%
02 DEC 2025A00210464Yoakum DistrictBridge Maintenance, Various (DISTRICTWIDE to .)10 of 10$3,514,491+83%
02 DEC 2025A00209185Houston DistrictRehabilitate Bridge, SH 288 (At DOW Barge Canal to .)1 of 5$1,115,100Low, 28% under the second
06 NOV 2025A00134792Yoakum DistrictRehabilitate Bridge, COUNTY ROAD 213 (CR 213 AT MIXON CREEK #1 to STR# AA04-37-001)4 of 4$2,037,285+173%
05 NOV 2025A00198973Houston DistrictRehabilitate Bridge, Various (Various Locations in Galveston County to .)4 of 8$3,977,683+40%
09 OCT 2025A00214078Fort Worth DistrictBridge Maintenance, SH 16 (Bridge Structure to Bridge Structure)3 of 5$5,759,345+35%
Southern Road & Bridge, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy