TxDOT contract A00211509 bid tabulation
Bridge Maintenance, SH 70 (SH 70/N FORK RED RIVER BRG to .). Let by Texas DOT on April 8, 2026, Gray, Amarillo District. 8 bids received; low bid $3,039,519 by Gilvin-Terrill, LTD., -11% against the engineer's estimate of $3,424,040.
- Owner
- Texas DOT
- Letting
- 08 APR 2026
- Pay items
- 68
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Gilvin-Terrill, LTD. | $3,039,519 | Low | -11% |
| 2 | Built Right Construction of Oklahoma, LLC | $3,152,502 | +4.0% | -8.0% |
| 3 | Scott Tucker Construction Company, LLC | $3,211,049 | +6.0% | -6.0% |
| 4 | Ti-Zack Concrete, LLC | $3,236,936 | +6.0% | -5.0% |
| 5 | Blacksmith Ventures LLC | $3,452,421 | +14% | +1.0% |
| 6 | Ragle Construction, Inc. | $3,532,927 | +16% | +3.0% |
| 7 | Gibson & Associates, Inc. | $3,625,646 | +19% | +6.0% |
| 8 | Southern Road & Bridge, LLC | $6,577,783 | +116% | +92% |
Engineer's estimate: $3,424,040.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Gilvin-Terrill, LTD. | 2. Built Right Construction of Oklahoma, LLC | 3. Scott Tucker Construction Company, LLC | 4. Ti-Zack Concrete, LLC | 5. Blacksmith Ventures LLC | 6. Ragle Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (final)(OC)(type A) (132-7001) | CY | 121 | $40.00 | $50.00 | $30.00 | $95.00 | $203.55 | $120.00 | $95.00 |
| 2 | Soil ret BLKT(SL_mod_sand_short_roll) (169-7011) | SY | 1,847 | $3.00 | $3.00 | $5.00 | $6.90 | $5.00 | $4.00 | |
| 3 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 2,033 | $10.00 | $10.00 | $12.00 | $19.00 | $14.95 | $14.00 | $15.00 |
| 4 | Full - depth repair CRCP (13") (361-7058) | SY | 36 | $400.00 | $250.00 | $983.00 | $632.50 | $260.00 | $540.00 | |
| 5 | Class C concrete (cap)(extend) (420-7026) | CY | 1.40 | $5,000.00 | $15,000 | $5,000.00 | $24,101 | $2,875.00 | $20,000 | $5,000.00 |
| 6 | Class C concrete(pile encasement) (420-7059) | LF | 48 | $500.00 | $1,200.00 | $798.00 | $893.55 | $900.00 | $500.00 | |
| 7 | Epoxy waterproof finish (type X) (427-7005) | SF | 9,722 | $13.00 | $10.00 | $9.00 | $9.00 | $19.55 | $8.00 | $8.00 |
| 8 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 556 | $180.00 | $200.00 | $250.00 | $162.00 | $139.15 | $210.00 | $120.00 |
| 9 | Riprap (concrete)(4 in) (432-7001) | CY | 66 | $810.00 | $750.00 | $555.00 | $632.50 | $800.00 | $585.00 | |
| 10 | Riprap (concrete)(5 in) (432-7002) | CY | 13 | $700.00 | $1,000.00 | $800.00 | $1,933.00 | $760.15 | $900.00 | $1,160.00 |
| 11 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 19 | $1,000.00 | $350.00 | $609.00 | $517.50 | $300.00 | $290.00 | |
| 12 | Elastomeric bearing (laminated) (434-7002) | EACH | 5 | $1,800.00 | $3,000.00 | $2,500.00 | $1,700.00 | $17,250 | $3,000.00 | $3,000.00 |
| 13 | Cleaning existing joints (438-7008) | LF | 88 | $100.00 | $65.00 | $29.00 | $201.25 | $90.00 | $23.00 | |
| 14 | Resizing and sealing joints (438-7009) | LF | 76 | $100.00 | $225.00 | $207.00 | $201.25 | $120.00 | $64.00 | |
| 15 | Clean and seal JNTS (pan girders) (CL7) (438-7012) | LF | 276 | $100.00 | $65.00 | $33.00 | $139.15 | $60.00 | $69.00 | |
| 16 | Clean and seal existing JTS (strip seal) (438-7014) | LF | 96 | $100.00 | $75.00 | $77.00 | $230.00 | $150.00 | $54.00 | |
| 17 | Polyester polymer concrete overlay (439-7025) | CY | 79 | $8,500.00 | $7,000.00 | $5,000.00 | $6,613.00 | $2,875.00 | $7,000.00 | $6,500.00 |
| 18 | Clean and paint existing STR (ref no. 1) (446-7020) | EACH | 1 | $55,000 | $60,000 | $95,125 | $63,250 | $40,000 | $250,000 | |
| 19 | Clean and paint existing STR (ref no. 2) (446-7021) | EACH | 1 | $5,000.00 | $20,000 | $20,000 | $40,940 | $23,000 | $20,000 | $250,000 |
| 20 | Clean and paint existing STR (ref no. 3) (446-7022) | EACH | 1 | $45,000 | $52,000 | $40,490 | $57,500 | $35,000 | $155,000 | |
| 21 | Clean and paint existing STR (ref no. 5) (446-7024) | EACH | 1 | $75,000 | $90,000 | $22,929 | $92,000 | $60,000 | $104,000 | |
| 22 | Retrofit rail (type SSTR) (451-7024) | LF | 426 | $250.00 | $150.00 | $243.00 | $162.15 | $210.00 | $175.00 | |
| 23 | Retrofit rail (type T223)(mod) (451-7053) | LF | 630 | $280.00 | $200.00 | $165.00 | $210.00 | $180.55 | $230.00 | $190.00 |
| 24 | Shot blasting (483-7016) | SY | 2,000 | $10.00 | $10.00 | $5.00 | $5.00 | $14.95 | $7.00 | $4.00 |
| 25 | Raising existing struct (495-7001) | LS | 1 | $75,000 | $37,000 | $40,000 | $133,317 | $86,250 | $70,000 | $50,000 |
| 26 | Mobilization (500-7001) | LS | 1 | $260,000 | $300,000 | $300,000 | $322,000 | $86,250 | $306,000 | $340,000 |
| 27 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $18,000 | $15,100 | $7,500.00 | $8,901.00 | $11,500 | $6,000.00 | $22,000 |
| 28 | Portable changeable message sign (503-7002) | EACH | 2 | $18,500 | $5,000.00 | $17,330 | $13,800 | $22,000 | $35,000 | |
| 29 | TMA (stationary) (505-7001) | DAY | 50 | $200.00 | $660.00 | $350.00 | $390.00 | $287.50 | $400.00 | $325.00 |
| 30 | TMA (mobile operation) (505-7002) | HR | 80 | $125.00 | $82.50 | $150.00 | $67.00 | $138.00 | $400.00 | $60.00 |
| 31 | One-way traffic control (port traffic signal) (510-7003) | MO | 6 | $9,000.00 | $5,000.00 | $6,000.00 | $9,800.00 | $5,750.00 | $6,000.00 | $3,500.00 |
| 32 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 600 | $35.00 | $125.00 | $127.00 | $46.00 | $140.00 | $80.00 | |
| 33 | Portable concrete traffic barrier (des source)(F-shape)(type 1) (512-7017) | LF | 3,900 | $40.00 | $15.00 | $30.00 | $38.00 | $40.25 | $25.00 | $40.00 |
| 34 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 3,900 | $9.00 | $10.00 | $30.00 | $9.00 | $40.25 | $10.00 | $7.00 |
| 35 | Portable concrete traffic barrier (stockpile)(F-shape)(type 1) (512-7041) | LF | 3,900 | $30.00 | $15.00 | $30.00 | $38.00 | $43.70 | $20.00 | $10.00 |
| 36 | Portable concrete traffic barrier (connection hardware) (512-7070) | EACH | 130 | $30.00 | $50.00 | $100.00 | $20.00 | $28.75 | $70.00 | $70.00 |
| 37 | Permanent CTB (tran SSCB to SSTR) (mod) (514-7038) | LF | 30 | $300.00 | $150.00 | $758.00 | $1,725.00 | $400.00 | $245.00 | |
| 38 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,520 | $36.00 | $31.00 | $35.00 | $35.00 | $51.75 | $45.00 | $31.00 |
| 39 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 12 | $2,200.00 | $2,250.00 | $2,800.00 | $3,176.00 | $4,025.00 | $4,200.00 | $2,250.00 |
| 40 | Remove metal beam guard fence (542-7001) | LF | 1,520 | $6.00 | $2.00 | $3.00 | $2.30 | $6.90 | $5.00 | $2.00 |
| 41 | Guardrail end treatment (install) (544-7001) | EACH | 12 | $3,600.00 | $2,300.00 | $3,000.00 | $2,562.00 | $6,900.00 | $5,000.00 | $2,300.00 |
| 42 | Guardrail end treatment (remove) (544-7003) | EACH | 12 | $400.00 | $400.00 | $500.00 | $459.00 | $575.00 | $1,000.00 | $400.00 |
| 43 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 6 | $2,500.00 | $1,000.00 | $3,000.00 | $1,612.00 | $6,670.00 | $3,000.00 | $1,250.00 |
| 44 | Crash cushion attenuator (remove) (545-7004) | EACH | 6 | $1,980.00 | $1,000.00 | $2,000.00 | $1,316.00 | $5,750.00 | $2,500.00 | $1,050.00 |
| 45 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 1 | $27,000 | $33,000 | $30,483 | $36,800 | $32,000 | $28,350 | |
| 46 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 6 | $10,000 | $7,500.00 | $11,000 | $9,464.00 | $9,775.00 | $6,000.00 | $7,600.00 |
| 47 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 18 | $40.00 | $42.00 | $50.00 | $43.00 | $57.50 | $100.00 | $42.00 |
| 48 | Install delineator assembly (D-SY)SZ 1(BRF)GF2(BI) (658-7037) | EACH | 40 | $30.00 | $45.00 | $55.00 | $40.00 | $57.50 | $100.00 | $45.00 |
| 49 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 10,718 | $1.50 | $0.60 | $0.75 | $0.60 | $0.69 | $2.00 | $0.39 |
| 50 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 96 | $12.00 | $20.00 | $24.00 | $20.00 | $23.00 | $30.00 | $5.50 |
| 51 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 43,690 | $1.00 | $0.60 | $0.75 | $0.60 | $0.69 | $2.00 | $0.39 |
| 52 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 1,080 | $5.00 | $6.00 | $5.00 | $5.75 | $8.00 | $3.95 | |
| 53 | Work zone pavement marking removing (traffic BTN) type W (662-7057) | EACH | 972 | $3.75 | $4.50 | $4.00 | $4.31 | $7.00 | $3.05 | |
| 54 | Work zone pavement marking removing (traffic BTN) type Y (662-7059) | EACH | 2,268 | $3.75 | $4.50 | $4.00 | $4.31 | $7.00 | $3.05 | |
| 55 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 6,284 | $1.00 | $2.80 | $3.35 | $3.00 | $3.22 | $2.00 | $0.63 |
| 56 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 440 | $1.00 | $2.80 | $3.35 | $3.00 | $3.22 | $2.00 | $0.75 |
| 57 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 4,542 | $2.80 | $3.35 | $3.00 | $3.22 | $2.00 | $0.63 | |
| 58 | Eliminating existing PM & markers (6") (677-7002) | LF | 67,514 | $0.35 | $0.75 | $1.00 | $0.75 | $0.86 | $0.80 | $0.55 |
| 59 | Eliminating existing PM & markers (24") (677-7008) | LF | 96 | $10.00 | $6.00 | $7.25 | $6.00 | $6.90 | $15.00 | $3.50 |
| 60 | Pavement surface preparation for marking (6") (678-7002) | LF | 3,553 | $1.00 | $1.25 | $1.00 | $1.15 | $1.00 | $0.07 | |
| 61 | Bridge joint replacement (SEJ) (785-7011) | LF | 300 | $600.00 | $300.00 | $500.00 | $34.00 | $178.25 | $500.00 | $500.00 |
| 62 | Carbon fiber reinforced polymer protection (786-7001) | SF | 100 | $100.00 | $100.00 | $99.00 | $134.55 | $120.00 | $200.00 | |
| 63 | Concrete beam repair (788-7001) | EACH | 4 | $5,200.00 | $5,000.00 | $2,000.00 | $2,355.00 | $2,875.00 | $8,000.00 | $5,000.00 |
| 64 | Concrete beam repair (CFRP) (788-7002) | EACH | 15 | $7,000.00 | $8,500.00 | $7,000.00 | $2,527.00 | $5,750.00 | $12,000 | $4,500.00 |
| 65 | Tied-concrete block erosion control mat (2005-7001) | SF | 1,463 | $20.00 | $10.00 | $25.00 | $45.00 | $10.35 | $50.00 | $30.00 |
| 66 | Steel bridge zone painting (4010-7021) | SF | 1,748 | $100.00 | $100.00 | $90.00 | $77.00 | $109.25 | $60.00 | $60.00 |
| 67 | Prefb PV MK W/wnty type B (W)(6")(solid) (6064-7002) | LF | 3,553 | $8.00 | $10.00 | $8.00 | $9.20 | $11.00 | $8.00 | |
| 68 | Prefb PV MK W/wnty type B (Y)(6")(solid) (6064-7006) | LF | 3,553 | $8.00 | $10.00 | $8.00 | $9.20 | $11.00 | $8.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.