Built Right Construction of Oklahoma, LLC: TxDOT bid record
Built Right Construction of Oklahoma, LLC submitted 201 bids on Texas DOT contracts in the data, from 06 MAY 2021 to 04 NOV 2026, and was the low bidder on 13 of them (6%). When it was not low, its total sat a median +44% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $42,183,791
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 8 | 2 | 25% |
| 2022 | 20 | 1 | 5% |
| 2023 | 20 | 3 | 15% |
| 2024 | 35 | 1 | 3% |
| 2025 | 72 | 5 | 7% |
| 2026 | 46 | 1 | 2% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Paris District | 31 | 2 | 6% |
| Dallas District | 22 | 1 | 5% |
| Austin District | 16 | 0 | 0% |
| Fort Worth District | 15 | 0 | 0% |
| Wichita Falls District | 13 | 1 | 8% |
| Amarillo District | 12 | 2 | 17% |
| Abilene District | 9 | 0 | 0% |
| Childress District | 8 | 2 | 25% |
| Bryan District | 8 | 0 | 0% |
| Waco District | 8 | 1 | 13% |
| Atlanta District | 7 | 0 | 0% |
| Lufkin District | 6 | 1 | 17% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 190 | 87 (46%) | $4,000.00 | $5,000.00 |
| TMA (stationary) | 505-7001 | DAY | 176 | 49 (28%) | $300.00 | $230.00 |
| Portable changeable message sign | 503-7001 | DAY | 84 | 32 (38%) | $73.00 | $100.00 |
| Portable changeable message sign | 503-7002 | EACH | 76 | 31 (41%) | $5,000.00 | $10,000 |
| Flowable backfill | 401-7001 | CY | 106 | 21 (20%) | $400.00 | $350.00 |
| TMA (mobile operation) | 505-7003 | DAY | 54 | 21 (39%) | $300.00 | $291.17 |
| Removing concrete (riprap) | 104-7006 | SY | 60 | 17 (28%) | $50.00 | $25.00 |
| Preparing row | 100-7002 | STA | 43 | 11 (26%) | $3,000.00 | $2,750.00 |
| Crash cushion attenuator (remove) | 545-7004 | EACH | 59 | 10 (17%) | $1,500.00 | $1,000.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 79 | 9 (11%) | $2.00 | $1.00 |
| Crash cushion attenuator (move & reset) | 545-7002 | EACH | 50 | 9 (18%) | $2,100.00 | $1,535.40 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 47 | 9 (19%) | $750.00 | $643.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| SCR Civil Construction, LLC | 72 | 43 of 72 |
| Structural Integrity Group LLC | 65 | 54 of 65 |
| Garret Shields Infrastructure | 63 | 56 of 63 |
| Ragle Construction, Inc. | 60 | 45 of 60 |
| Icos Management, LLC | 58 | 41 of 58 |
| Gibson & Associates, Inc. | 56 | 37 of 56 |
| Blacksmith Ventures LLC | 39 | 30 of 39 |
| Southern Road & Bridge, LLC | 37 | 11 of 37 |
| FNH Construction, LLC | 36 | 7 of 36 |
| Pathfield Investments LLC | 35 | 27 of 35 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00223826 | Childress District | BRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans) | 16 of 16 | $2,160,400 | +208% |
| 03 NOV 2026 | A00223831 | Childress District | BRIDGE PREVENTATIVE MAINTENANCE, US0287 (Various Locations ~ See Plans to Various Locations ~ See Plans) | 15 of 15 | $2,168,000 | +174% |
| 06 OCT 2026 | A00211479 | Austin District | Bridge Maintenance, US 79 (US 79 at Drain to #14-246-0-0204-01-008.) | 13 of 14 | $1,246,263 | +262% |
| 06 OCT 2026 | A00195499 | Wichita Falls District | Resurface Roadway, US 281 (FM 1954 to Lake Creek) | 5 of 5 | $5,566,132 | +51% |
| 06 OCT 2026 | A00220460 | Brownwood District | BRIDGE PREVENTATIVE MAINTENANCE, SH0016 (DISTRICT-WIDE to DISTRICT-WIDE) | 11 of 11 | $1,925,647 | +165% |
| 02 JUL 2026 | A00211933 | Fort Worth District | Bridge Maintenance, IH 20 (Begin Bridge appoach to End Bridge approach) | 2 of 4 | $1,552,733 | +15% |
| 02 JUL 2026 | A00213157 | Wichita Falls District | Bridge Maintenance, US 281 (At SH 79 SB / FM 369 WB Connector to .) | 10 of 10 | $2,335,424 | +36% |
| 01 JUL 2026 | A00221442 | Waco District | BRIDGE PREVENTATIVE MAINTENANCE, SH0006 (VARIOUS BRIDGE LOCATIONS to in the Waco District) | 8 of 11 | $1,508,855 | +64% |
| 01 JUL 2026 | A00221477 | Paris District | FULL DEPTH CONCRETE REPAIR, IH0030 (Various locations in to Paris District) | 6 of 6 | $3,217,000 | +95% |
| 01 JUL 2026 | A00211476 | Austin District | Bridge Maintenance, SH 71 (At Oatman Creek to #14-150-0-0700-04-016.) | 7 of 11 | $826,760 | +57% |
| 03 JUN 2026 | A00210143 | Amarillo District | BRIDGE PREVENTATIVE MAINTENANCE, US0060 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets) | 4 of 10 | $1,475,106 | +17% |
| 03 JUN 2026 | A00209326 | Dallas District | Repair Roadway, US 75 (Dallas County Line to Ridgeview Road) | 3 of 7 | $2,995,925 | +37% |
| 03 JUN 2026 | A00220390 | Atlanta District | BRIDGE PREVENTATIVE MAINTENANCE, SH0008 (VARIOUS ROADWAYS to VARIOUS ROADWAYS) | 10 of 11 | $2,383,880 | +164% |
| 03 JUN 2026 | A00208955 | Corpus Christi District | Bridge Maintenance, Various (@Various Locations to In Corpus Christi District) | 7 of 9 | $709,672 | +48% |
| 03 JUN 2026 | A00216795 | Waco District | Bridge Maintenance, Various (Various to Various) | 4 of 9 | $3,819,408 | +25% |
| 03 JUN 2026 | A00210173 | Lubbock District | Bridge Maintenance, US 87 (1.95 mi south of FM 145 to On US 87) | 3 of 9 | $2,969,473 | +8.0% |
| 02 JUN 2026 | A00196865 | San Angelo District | Bridge Maintenance, Various (Various locations in SJT District to .) | 6 of 9 | $417,715 | +36% |
| 02 JUN 2026 | A00211709 | Austin District | Bridge Maintenance, RM 620 (At Colorado River to #14-227-0-0683-02-019.) | 2 of 8 | $3,519,289 | +6.0% |
| 07 MAY 2026 | A00207724 | Abilene District | Bridge Maintenance, US 83 (US 83 SB to @ BU 84 UPRR) | 6 of 14 | $4,417,691 | +10% |
| 07 MAY 2026 | A00208023 | Houston District | Rehabilitate Bridge, IH 45 (At McKinney Ramp to .) | 4 of 8 | $7,151,051 | +83% |
| 06 MAY 2026 | A00211596 | Childress District | Bridge Maintenance, US 83 (US 83 SB @ Salt Fork of Red River to .) | 1 of 13 | $2,396,526 | Low, 19% under the second |
| 06 MAY 2026 | A00135827 | Paris District | Bridge Replacement, CRAFT RD (Craft Rd to At Choctaw Creek Tributary) | 10 of 10 | $1,399,257 | +74% |
| 16 APR 2026 | A00214351 | Paris District | BRIDGE PREVENTATIVE MAINTENANCE, US0082 (Various locations in to Paris District) | 6 of 7 | $619,754 | +48% |
| 08 APR 2026 | A00211509 | Amarillo District | Bridge Maintenance, SH 70 (SH 70/N FORK RED RIVER BRG to .) | 2 of 8 | $3,152,502 | +4.0% |
| 08 APR 2026 | A00186272 | Lufkin District | Bridge Maintenance, Various (Various Locations Districtwide to .) | 7 of 7 | $1,864,535 | +97% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way