TxDOT contract A00220460 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, SH0016 (DISTRICT-WIDE to DISTRICT-WIDE). Let by Texas DOT on October 6, 2026, Comanche, Brownwood District. 11 bids received; low bid $727,661 by Taylor Bridge LLC, -26% against the engineer's estimate of $980,991.
- Owner
- Texas DOT
- Letting
- 06 OCT 2026
- Pay items
- 47
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Taylor Bridge LLC | $727,661 | Low | -26% |
| 2 | Structural Integrity Group LLC | $854,442 | +17% | -13% |
| 3 | Scott Tucker Construction Company, LLC | $961,691 | +32% | -2.0% |
| 4 | The Truesdell Corporation | $1,041,041 | +43% | +6.0% |
| 5 | Blacksmith Ventures LLC | $1,183,371 | +63% | +21% |
| 6 | Icos Management, LLC | $1,217,845 | +67% | +24% |
| 7 | SCR Civil Construction, LLC | $1,251,601 | +72% | +28% |
| 8 | Coppell Construction Co., Inc. | $1,306,824 | +80% | +33% |
| 9 | Rear Contractors LLC | $1,382,357 | +90% | +41% |
| 10 | THK Construction LLC | $1,424,774 | +96% | +45% |
| 11 | Built Right Construction of Oklahoma, LLC | $1,925,647 | +165% | +96% |
Engineer's estimate: $980,991.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Taylor Bridge LLC | 2. Structural Integrity Group LLC | 3. Scott Tucker Construction Company, LLC | 4. The Truesdell Corporation | 5. Blacksmith Ventures LLC | 6. Icos Management, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Excavation (channel) (110-7002) | CY | 28 | $85.00 | $75.00 | $165.00 | $158.00 | $200.00 | $1.00 | $210.00 |
| 2 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 650 | $1.25 | $0.50 | $1.00 | $7.00 | $8.00 | $1.00 | $1.10 |
| 3 | Flowable backfill (401-7001) | CY | 167 | $450.00 | $320.00 | $550.00 | $432.00 | $450.00 | $1,000.00 | $262.50 |
| 4 | Class C concrete(pile encasement) (420-7059) | LF | 216 | $365.00 | $350.00 | $475.00 | $357.00 | $210.00 | $300.00 | $367.50 |
| 5 | Penetrating concrete surface treatment (428-7001) | SY | 325 | $25.00 | $10.00 | $20.00 | $16.00 | $75.00 | $12.00 | $21.00 |
| 6 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 50 | $200.00 | $100.00 | $70.00 | $55.00 | $100.00 | $125.00 | $262.50 |
| 7 | Concrete structure repair(deck rep (full depth)) (429-7005) | SF | 20 | $170.00 | $500.00 | $210.00 | $219.00 | $415.00 | $1,000.00 | $630.00 |
| 8 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 96 | $215.00 | $750.00 | $232.00 | $195.00 | $165.00 | $350.00 | $210.00 |
| 9 | Riprap (stone protection)(18 in) (432-7043) | CY | 40 | $240.00 | $325.00 | $290.00 | $331.00 | $300.00 | $208.00 | $210.00 |
| 10 | Riprap (stone protection)(21 in) (432-7044) | CY | 270 | $145.00 | $325.00 | $240.00 | $200.00 | $165.00 | $208.00 | $210.00 |
| 11 | Riprap (stone protection)(24 in) (432-7045) | CY | 50 | $200.00 | $325.00 | $200.00 | $306.00 | $300.00 | $208.00 | $210.00 |
| 12 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 747 | $50.00 | $30.00 | $38.00 | $43.00 | $25.00 | $38.00 | $52.50 |
| 13 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 216 | $45.00 | $30.00 | $25.00 | $45.00 | $45.00 | $38.00 | $73.50 |
| 14 | Clean existing culverts (480-7002) | CY | 140 | $80.00 | $120.00 | $219.00 | $87.00 | $150.00 | $200.00 | $262.50 |
| 15 | Mobilization (500-7001) | LS | 1 | $100,711 | $10,000 | $87,000 | $96,000 | $319,744 | $1.00 | $120,000 |
| 16 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $9,530.00 | $1.00 | $11,500 | $11,731 | $800.00 | $1.00 | $6,300.00 |
| 17 | Portable changeable message sign (503-7001) | DAY | 20 | $70.00 | $100.00 | $1.00 | $136.00 | $1.00 | $100.00 | $210.00 |
| 18 | TMA (stationary) (505-7001) | DAY | 140 | $140.00 | $1.00 | $1.00 | $372.00 | $1.00 | $400.00 | $262.50 |
| 19 | Temporary sediment control fence (install) (506-7039) | LF | 4,700 | $3.45 | $0.50 | $0.01 | $3.00 | $0.04 | $0.10 | $2.10 |
| 20 | Temporary sediment control fence (remove) (506-7041) | LF | 4,700 | $0.90 | $0.01 | $0.01 | $2.00 | $0.02 | $0.10 | $1.10 |
| 21 | Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013) | LF | 800 | $20.00 | $5.00 | $0.01 | $28.00 | $45.00 | $50.00 | $52.50 |
| 22 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 200 | $15.00 | $10.00 | $0.01 | $1.00 | $37.00 | $50.00 | $52.50 |
| 23 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 800 | $25.00 | $5.00 | $0.01 | $28.00 | $45.00 | $50.00 | $52.50 |
| 24 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 1 | $2,010.00 | $500.00 | $1.00 | $1,758.00 | $2,750.00 | $5,000.00 | $5,250.00 |
| 25 | Crash cushion attenuator (remove) (545-7004) | EACH | 1 | $1,415.00 | $500.00 | $1.00 | $919.00 | $2,500.00 | $2,000.00 | $5,250.00 |
| 26 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 1 | $9,770.00 | $6,500.00 | $1.00 | $10,053 | $12,000 | $45,000 | $12,600 |
| 27 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 20 | $30.00 | $50.00 | $10.00 | $20.00 | $55.00 | $100.00 | $63.00 |
| 28 | Work zone pavement marking removing (traffic BTN) type W (662-7058) | LF | 5,350 | $3.50 | $2.00 | $0.01 | $1.00 | $2.10 | $1.00 | $3.15 |
| 29 | Work zone pavement marking removing (traffic BTN) type Y (662-7060) | LF | 4,310 | $3.50 | $2.25 | $0.01 | $1.00 | $2.30 | $1.00 | $3.15 |
| 30 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 1,103 | $0.65 | $2.00 | $0.01 | $4.00 | $2.10 | $4.00 | $3.15 |
| 31 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 1,103 | $0.20 | $1.50 | $0.01 | $3.00 | $1.60 | $3.00 | $2.10 |
| 32 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 2,510 | $0.15 | $1.50 | $0.01 | $2.00 | $1.60 | $2.00 | $2.10 |
| 33 | Eliminating existing PM & markers (6") (677-7002) | LF | 13,273 | $1.15 | $0.85 | $0.01 | $1.00 | $0.90 | $0.95 | $1.57 |
| 34 | Pavement surface preparation for marking (6") (678-7002) | LF | 4,716 | $0.30 | $0.50 | $0.01 | $0.50 | $0.55 | $0.50 | $1.10 |
| 35 | Replace of sidewalks (690-7061) | SF | 25 | $170.00 | $500.00 | $275.00 | $92.00 | $300.00 | $50.00 | $315.00 |
| 36 | Replace nuts, washers & other hardware (690-7241) | EACH | 1 | $70.00 | $1,000.00 | $500.00 | $250.00 | $4,000.00 | $1.00 | $2,100.00 |
| 37 | Driftwood removal (735-7060) | CY | 289 | $110.00 | $150.00 | $240.00 | $151.00 | $100.00 | $250.00 | $168.00 |
| 38 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 3 | $120.00 | $200.00 | $4,000.00 | $1,188.00 | $1,500.00 | $1.00 | $1,575.00 |
| 39 | Repair (steel rail) (776-7001) | LF | 22 | $170.00 | $50.00 | $85.00 | $74.00 | $300.00 | $300.00 | $630.00 |
| 40 | Concrete rail repair (in-kind) (778-7001) | LF | 20 | $450.00 | $500.00 | $900.00 | $702.00 | $850.00 | $2,000.00 | $1,050.00 |
| 41 | Bridge joint repair (header) (785-7002) | LF | 50 | $160.00 | $200.00 | $120.00 | $176.00 | $425.00 | $425.00 | $420.00 |
| 42 | Replacing elastomeric bearing pads (787-7001) | EACH | 10 | $7,145.00 | $5,500.00 | $3,900.00 | $131.00 | $4,500.00 | $22,500 | $10,500 |
| 43 | Concrete beam repair (CFRP) (788-7002) | EACH | 2 | $11,000 | $10,000 | $14,000 | $14,214 | $7,500.00 | $23,000 | $26,250 |
| 44 | Concrete beam rep(strand splice & CFRP) (788-7003) | EACH | 2 | $13,515 | $12,500 | $15,500 | $20,102 | $4,500.00 | $2,500.00 | $36,750 |
| 45 | Steel bridge zone painting ref STR #1 (4010-7001) | EACH | 1 | $61,000 | $30,000 | $35,000 | $50,661 | $40,000 | $30,000 | $42,000 |
| 46 | Steel bridge zone painting ref STR #2 (4010-7003) | EACH | 1 | $61,000 | $30,000 | $28,000 | $49,833 | $30,000 | $30,000 | $33,600 |
| 47 | Steel bridge zone painting ref STR #3 (4010-7004) | EACH | 1 | $61,000 | $30,000 | $35,000 | $50,345 | $40,000 | $30,000 | $42,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.