Taylor Bridge LLC submitted 45 bids on Texas DOT contracts in the data, from 09 APR 2025 to 03 NOV 2026, and was the low bidder on 24 of them (53%). When it was not low, its total sat a median +26% above the low bid.

Owner
Texas DOT
Low bid volume
$20,173,920
Latest bid
03 NOV 2026
Data through
19 NOV 2026
45Bids
24Low bids
53Win rate, percent
+26%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
20259667%
2026361850%
Taylor Bridge LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
San Antonio District12758%
Austin District9556%
Corpus Christi District4375%
Bryan District3133%
Laredo District33100%
Waco District3267%
Pharr District3133%
Yoakum District200%
Brownwood District22100%
Childress District100%
Houston District100%
San Angelo District100%
Taylor Bridge LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Construction exits (remove)506-7024SY1312 (92%)$1.00$10.00
Biodegradable erosion control logs (remove)506-7046LF1212 (100%)$1.00$1.40
Temporary sediment control fence (install)506-7039LF1711 (65%)$5.00$4.00
Temporary sediment control fence (remove)506-7041LF1511 (73%)$1.00$1.00
Barricades, signs and traffic handling502-7001MO178 (47%)$2,500.00$5,000.00
Construction exits (install) (type 1)506-7020SY97 (78%)$10.00$30.00
Riprap (concrete)(5 in)432-7002CY106 (60%)$500.00$640.65
Riprap (stone protection)(18 in)432-7043CY175 (29%)$200.00$200.00
Bent cap/abutment cap cleaning7001-7002EACH125 (42%)$1,000.00$1,145.00
Biodegradable erosion control logs (install) (12")506-7044LF134 (31%)$5.00$6.00
Replacing elastomeric bearing pads787-7001EACH84 (50%)$8,750.00$8,000.00
TMA (stationary)505-7001DAY133 (23%)$500.00$230.00
Taylor Bridge LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Taylor Bridge LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
03 NOV 2026A00204003Bryan DistrictBridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK)11 of 15$911,373+26%
03 NOV 2026A00219553Austin DistrictBRIDGE PREVENTATIVE MAINTENANCE, RM2222 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT)10 of 13$1,742,010+61%
07 OCT 2026A00222466Brownwood DistrictBRIDGE PREVENTATIVE MAINTENANCE, FM0581 (VARIOUS to VARIOUS)1 of 9$719,494Low, 24% under the second
06 OCT 2026A00211479Austin DistrictBridge Maintenance, US 79 (US 79 at Drain to #14-246-0-0204-01-008.)1 of 14$344,329Low, 42% under the second
06 OCT 2026A00220460Brownwood DistrictBRIDGE PREVENTATIVE MAINTENANCE, SH0016 (DISTRICT-WIDE to DISTRICT-WIDE)1 of 11$727,661Low, 17% under the second
06 OCT 2026A00220834Laredo DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0035 (Various to Various)1 of 8$1,245,105Low, 23% under the second
02 SEP 2026A00223211Laredo DistrictDEBRIS REMOVAL, IH0035 (Various to Various)1 of 4$1,244,224Low, 20% under the second
02 SEP 2026A00184856San Antonio DistrictBridge Replacement, CR 33 (On Waring-Welfare Road to at Joshua Creek)3 of 8$762,934+16%
05 AUG 2026A00219217Waco DistrictBRIDGE REPAIR, SH0036 (Various locations to in the Waco District)2 of 4$1,493,369+13%
22 JUL 2026A00220027San Antonio DistrictEROSION REPAIR, FM2673 (FM 2673 to AT DRAW)1 of 4$58,369Low, 22% under the second
22 JUL 2026A00219576San Antonio DistrictEROSION REPAIR, UA0090 (US90A to at Darst Creek)1 of 4$175,688Low, 20% under the second
22 JUL 2026A00219780San Antonio DistrictBRIDGE SCOUR REPAIR, US0181 (AT KICASTER CREEK to AT KICASTER CREEK)1 of 2$51,322Low, 12% under the second
02 JUL 2026A00215438Austin DistrictREPLACE CONCRETE RIPRAP, IH0035 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT)3 of 3$1,275,000+69%
02 JUL 2026A00214821Bryan DistrictBridge Maintenance, US 79 (On US 79 SB to at SH 6 NB & UPRR)1 of 3$1,205,489Low, 8.0% under the second
02 JUL 2026A00186990San Antonio DistrictRehabilitate Bridge, AUGUSTA (On Augusta St. to At San Antonio River)1 of 7$3,303,411Low, 11% under the second
02 JUL 2026A00189583Yoakum DistrictRemoval And/Or Replacement And/Or Disposal, DUPONT RD (VICTORIA BARGE CANAL to STR #AA02-82-001 (DUPONT RD))2 of 3$1,005,570+14%
01 JUL 2026A00221442Waco DistrictBRIDGE PREVENTATIVE MAINTENANCE, SH0006 (VARIOUS BRIDGE LOCATIONS to in the Waco District)1 of 11$922,471Low, 1.0% under the second
01 JUL 2026A00211476Austin DistrictBridge Maintenance, SH 71 (At Oatman Creek to #14-150-0-0700-04-016.)1 of 11$526,435Low, 14% under the second
25 JUN 2026A00218968Pharr DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0069E (VARIOUS ROADWAYS to VARIOUS ROADWAYS)2 of 3$802,873+9.0%
25 JUN 2026A00218969Pharr DistrictBRIDGE PREVENTATIVE MAINTENANCE, BU0077X (VARIOUS ROADWAYS to VARIOUS ROADWAYS)2 of 3$501,768+81%
02 JUN 2026A00196825Corpus Christi DistrictBridge Maintenance, Various (at Various Locations to in Goliad and Karnes Counties)1 of 14$177,547Low, 6.0% under the second
02 JUN 2026A00196419San Antonio DistrictBridge Maintenance, Various (Various Locations Districtwide to .)1 of 5$4,555,821Low, 9.0% under the second
12 MAY 2026A00220166Bryan DistrictBRIDGE PREVENTATIVE MAINTENANCE, SH0036 (At Second Davidson Creek to At Brushy Creek)4 of 5$1,100,000+80%
22 APR 2026A00217860San Antonio DistrictBRIDGE RAIL REPAIR, UA0090 (US90A to AT WALNUT BRANCH)1 of 1$247,629Low
14 APR 2026A00220441Corpus Christi DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0281 (Various In Live Oak, Nueces, Kleberg, & to San Patricio Counties)2 of 10$649,200+1.0%
Taylor Bridge LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy