TxDOT letting results, July 22, 2026
5 contracts let by Texas DOT on July 22, 2026, $1,043,820 in low bids, a median of 4 bidders per contract. On the 5 with an engineer's estimate, the low bid came in under it 5 times; median low bid -20% against the estimate.
- Owner
- Texas DOT
- Contracts
- 5
- Low bids, total
- $1,043,820
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00220284 | CRACK SEAL, US0059 (Nac, Sab, San Aug & Shelby counties to Various Locations) | Lufkin District | 5 | Scout 5 Construction LLC | $532,857 | $575,149 | +8.0% | -9.0% | TxDOT |
| A00220542 | BRIDGE PREVENTATIVE MAINTENANCE, US0059 (Various Locations Districtwide to Various Locations Districtwide) | Lufkin District | 8 | 12Twelve Road and Bridge LLC | $225,584 | $234,288 | +4.0% | -41% | TxDOT |
| A00219576 | EROSION REPAIR, UA0090 (US90A to at Darst Creek) | San Antonio District | 4 | Taylor Bridge LLC | $175,688 | $210,688 | +20% | -20% | TxDOT |
| A00220027 | EROSION REPAIR, FM2673 (FM 2673 to AT DRAW) | San Antonio District | 4 | Taylor Bridge LLC | $58,369 | $71,266 | +22% | -21% | TxDOT |
| A00219780 | BRIDGE SCOUR REPAIR, US0181 (AT KICASTER CREEK to AT KICASTER CREEK) | San Antonio District | 2 | Taylor Bridge LLC | $51,322 | $57,623 | +12% | -19% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.