TxDOT contract A00219217 bid tabulation
BRIDGE REPAIR, SH0036 (Various locations to in the Waco District). Let by Texas DOT on August 5, 2026, Bell, Waco District. 4 bids received; low bid $1,320,412 by SCR Civil Construction, LLC, -20% against the engineer's estimate of $1,644,863.
- Owner
- Texas DOT
- Letting
- 05 AUG 2026
- Pay items
- 72
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | SCR Civil Construction, LLC | $1,320,412 | Low | -20% |
| 2 | Taylor Bridge LLC | $1,493,369 | +13% | -9.0% |
| 3 | Ragle Construction, Inc. | $1,641,168 | +24% | 0.0% |
| 4 | Blacksmith Ventures LLC | $3,111,840 | +136% | +89% |
Engineer's estimate: $1,644,863.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. SCR Civil Construction, LLC | 2. Taylor Bridge LLC | 3. Ragle Construction, Inc. | 4. Blacksmith Ventures LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 19 | $5.29 | $62.00 | $50.00 | $40.00 | $240.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 20 | $31.62 | $95.75 | $500.00 | $74.00 | $300.00 |
| 3 | Removing concrete (miscellaneous) (104-7047) | CY | 10 | $100.00 | $273.00 | $500.00 | $123.00 | $500.00 |
| 4 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 90 | $40.00 | $71.00 | $50.00 | $82.00 | $200.00 |
| 5 | SP mixes SP-C sac-B PG70-22 (exempt) (344-7038) | TON | 216 | $367.50 | $330.00 | $255.00 | $215.00 | $300.00 |
| 6 | Flexible pavement structure repair(3") (351-7002) | SY | 270 | $45.10 | $224.00 | $120.00 | $60.00 | $250.00 |
| 7 | Planing asphalt concrete pavement (0" to 5") (354-7089) | SY | 1,874 | $4.00 | $17.00 | $12.50 | $8.70 | $15.00 |
| 8 | Pavement JT underseal (24") (356-7021) | LF | 1,246 | $16.33 | $31.00 | $20.00 | $15.80 | $40.00 |
| 9 | Flowable backfill (401-7001) | CY | 34 | $385.00 | $681.00 | $1,000.00 | $354.00 | $900.00 |
| 10 | Temporary special shoring (cofferdam) (403-7002) | SF | 140 | $27.50 | $45.00 | $35.00 | $108.00 | $200.00 |
| 11 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 750 | $143.00 | $31.00 | $60.00 | $155.00 | $180.00 |
| 12 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 137 | $148.00 | $142.00 | $375.00 | $70.00 | $500.00 |
| 13 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 204 | $177.50 | $179.00 | $500.00 | $80.00 | $220.00 |
| 14 | Riprap (mow strip)(4 in) (432-7013) | CY | 0.80 | $620.00 | $3,900.00 | $2,000.00 | $2,200.00 | $4,500.00 |
| 15 | Riprap (stone protection)(18 in) (432-7043) | CY | 50 | $200.00 | $302.00 | $500.00 | $136.00 | $300.00 |
| 16 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 863 | $50.00 | $26.00 | $50.00 | $30.00 | $65.00 |
| 17 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 931 | $45.00 | $26.00 | $50.00 | $30.00 | $65.00 |
| 18 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 78 | $20.00 | $38.00 | $50.00 | $34.00 | $200.00 |
| 19 | STR steel (pedestal) (442-7010) | LB | 1,327 | $15.00 | $33.00 | $10.00 | $24.00 | $120.00 |
| 20 | Retrofit rail (type T402) (451-7012) | LF | 7.70 | $195.00 | $2,620.00 | $1,500.00 | $815.00 | $900.00 |
| 21 | Gabions (galvanized) (459-7001) | CY | 40 | $530.00 | $450.00 | $500.00 | $411.00 | $750.00 |
| 22 | Shot blasting (483-7016) | SY | 1,888 | $4.50 | $5.75 | $10.00 | $2.90 | $25.00 |
| 23 | Raising existing struct (495-7001) | LS | 2 | $49,396 | $14,500 | $35,000 | $200,000 | $90,000 |
| 24 | Mobilization (500-7001) | LS | 1 | $121,842 | $126,000 | $150,000 | $163,000 | $300,000 |
| 25 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $3,830.00 | $11,600 | $5,000.00 | $60,000 | $15,000 |
| 26 | Portable changeable message sign (503-7001) | DAY | 28 | $83.54 | $160.00 | $500.00 | $55.00 | $400.00 |
| 27 | TMA (stationary) (505-7001) | DAY | 50 | $150.00 | $320.00 | $250.00 | $287.00 | $200.00 |
| 28 | TMA (mobile operation) (505-7002) | HR | 40 | $65.00 | $90.00 | $125.00 | $769.00 | $1.00 |
| 29 | Temporary sediment control fence (install) (506-7039) | LF | 1,000 | $4.26 | $5.90 | $5.00 | $5.00 | $5.00 |
| 30 | Temporary sediment control fence (remove) (506-7041) | LF | 1,000 | $1.00 | $1.42 | $1.00 | $1.20 | $2.00 |
| 31 | Metal W-beam guard fence (steel post) (540-7002) | LF | 30 | $30.00 | $118.00 | $125.00 | $45.00 | $200.00 |
| 32 | Metal beam guard fence trans(thrie beam)28" (540-7021) | EACH | 1 | $2,000.00 | $3,540.00 | $5,000.00 | $2,800.00 | $4,500.00 |
| 33 | Remove metal beam guard fence (542-7001) | LF | 19 | $3.00 | $23.60 | $50.00 | $5.00 | $100.00 |
| 34 | In bridge MNT clearance sign assembly(type N) (644-7061) | EACH | 1 | $2,500.00 | $4,000.00 | $7,500.00 | $5,000.00 | $6,500.00 |
| 35 | Remove BRDG MNT clearance sign assembly (644-7074) | EACH | 1 | $350.00 | $600.00 | $500.00 | $500.00 | $3,500.00 |
| 36 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 287 | $1.40 | $4.70 | $15.00 | $2.37 | $20.00 |
| 37 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 26 | $1.30 | $4.70 | $40.00 | $1.88 | $20.00 |
| 38 | Type I high perf PM (W)6"(broken)(100MIL) (666-7290) | LF | 140 | $0.70 | $5.65 | $2.00 | $2.00 | $50.00 |
| 39 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 1,000 | $0.70 | $2.05 | $2.00 | $2.00 | $10.00 |
| 40 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 1,000 | $0.70 | $2.05 | $2.00 | $2.00 | $10.00 |
| 41 | Type I high perf PM (W)6"(DOT)(100 mil) (666-7433) | LF | 52 | $3.50 | $13.55 | $2.00 | $2.00 | $50.00 |
| 42 | Type I high perf PM (W)8"(DOT)(100 mil) (666-7434) | LF | 32 | $6.00 | $22.55 | $2.00 | $2.00 | $50.00 |
| 43 | Type I high perf PM(W)8"(solid)(100 mil) (666-7435) | LF | 316 | $4.00 | $2.85 | $2.00 | $2.00 | $25.00 |
| 44 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 184 | $16.00 | $16.00 | $2.00 | $12.00 | $140.00 |
| 45 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 2 | $238.50 | $333.00 | $300.00 | $300.00 | $700.00 |
| 46 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 2 | $320.00 | $321.00 | $400.00 | $400.00 | $1,200.00 |
| 47 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 2 | $289.00 | $395.00 | $400.00 | $300.00 | $900.00 |
| 48 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 26 | $5.25 | $6.76 | $5.00 | $5.00 | $100.00 |
| 49 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 26 | $5.05 | $6.76 | $5.00 | $5.00 | $100.00 |
| 50 | Eliminating existing PM & markers (6") (677-7002) | LF | 192 | $0.75 | $1.70 | $5.00 | $5.00 | $20.00 |
| 51 | Eliminating existing PM & markers (8") (677-7004) | LF | 348 | $1.00 | $2.85 | $5.00 | $5.00 | $25.00 |
| 52 | Eliminating existing PM & markers (24") (677-7008) | LF | 184 | $4.00 | $9.00 | $10.00 | $10.00 | $30.00 |
| 53 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $69.45 | $254.00 | $100.00 | $100.00 | $400.00 |
| 54 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 2 | $76.00 | $254.00 | $150.00 | $150.00 | $400.00 |
| 55 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $70.00 | $254.00 | $100.00 | $100.00 | $600.00 |
| 56 | Pavement surface preparation for marking (6") (678-7002) | LF | 192 | $0.24 | $0.03 | $0.25 | $0.10 | $10.00 |
| 57 | Pavement surface preparation for marking (8") (678-7004) | LF | 348 | $0.20 | $0.17 | $0.25 | $0.10 | $10.00 |
| 58 | Pavement surface preparation for marking (24") (678-7008) | LF | 184 | $1.00 | $1.15 | $0.25 | $0.10 | $10.00 |
| 59 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $15.00 | $34.00 | $5.00 | $0.10 | $300.00 |
| 60 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 2 | $16.25 | $34.00 | $5.00 | $0.10 | $300.00 |
| 61 | Pavement surface preparation for marking (word) (678-7016) | EACH | 2 | $15.30 | $34.00 | $5.00 | $0.10 | $300.00 |
| 62 | Spalling repair (polymeric) (semirigid) (720-7003) | GAL | 665 | $230.00 | $75.50 | $65.00 | $51.00 | $300.00 |
| 63 | Driftwood removal (735-7060) | CY | 15 | $80.85 | $526.00 | $500.00 | $109.00 | $400.00 |
| 64 | Replace(steel rail) (776-7024) | LF | 30 | $200.00 | $429.00 | $500.00 | $165.00 | $600.00 |
| 65 | CNC crack repair (discrete)(inject) (780-7002) | LF | 60 | $63.80 | $139.00 | $200.00 | $29.50 | $150.00 |
| 66 | CNC crack repair (flood)(gravity) (780-7005) | SF | 16,960 | $16.00 | $2.00 | $7.50 | $3.70 | $14.00 |
| 67 | Rep steel bridge MBR (weld repair) (784-7022) | EACH | 2 | $7,500.00 | $3,300.00 | $22,500 | $2,100.00 | $40,000 |
| 68 | Bridge joint repair (header) (785-7002) | LF | 156 | $140.00 | $109.00 | $150.00 | $114.00 | $900.00 |
| 69 | Concrete beam repair (788-7001) | EACH | 11 | $3,500.00 | $2,490.00 | $2,000.00 | $1,900.00 | $16,000 |
| 70 | Underseal course (3006-7001) | GAL | 469 | $3.70 | $7.00 | $10.00 | $12.00 | $30.00 |
| 71 | Inwater column encapsulation (4048-7001) | LF | 160 | $2,500.00 | $2,365.00 | $1,800.00 | $853.00 | $3,500.00 |
| 72 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 9 | $556.00 | $1,682.00 | $1,000.00 | $678.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way