TxDOT contract A00221442 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, SH0006 (VARIOUS BRIDGE LOCATIONS to in the Waco District). Let by Texas DOT on July 1, 2026, McLennan, Waco District. 11 bids received; low bid $922,471 by Taylor Bridge LLC, -22% against the engineer's estimate of $1,179,878.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 37
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Taylor Bridge LLC | $922,471 | Low | -22% |
| 2 | The Truesdell Corporation | $929,929 | +1.0% | -21% |
| 3 | Digg Commercial, LLC | $1,084,000 | +18% | -8.0% |
| 4 | Icos Management, LLC | $1,102,170 | +19% | -7.0% |
| 5 | Garret Shields Infrastructure | $1,177,250 | +28% | 0.0% |
| 6 | Cross Plus Construction, LLC | $1,413,933 | +53% | +20% |
| 7 | Structural Integrity Group LLC | $1,489,013 | +61% | +26% |
| 8 | Built Right Construction of Oklahoma, LLC | $1,508,855 | +64% | +28% |
| 9 | Blacksmith Ventures LLC | $1,693,160 | +84% | +44% |
| 10 | Rear Contractors LLC | $1,805,275 | +96% | +53% |
| 11 | Crackseal of Texas, LLC | $2,966,716 | +222% | +151% |
Engineer's estimate: $1,179,878.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Taylor Bridge LLC | 2. The Truesdell Corporation | 3. Digg Commercial, LLC | 4. Icos Management, LLC | 5. Garret Shields Infrastructure | 6. Cross Plus Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 2 | $1,525.00 | $1,000.00 | $1,250.00 | $10,000 | $2,100.00 | $1,000.00 | $2,000.00 |
| 2 | Removing concrete (rail) (104-7036) | LF | 12 | $1,936.00 | $275.00 | $136.00 | $30.00 | $420.00 | $200.00 | $130.00 |
| 3 | Removing concrete (miscellaneous) (104-7047) | CY | 12 | $100.00 | $150.00 | $255.00 | $634.00 | $126.00 | $500.00 | $120.00 |
| 4 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 1,695 | $40.00 | $25.00 | $31.00 | $30.00 | $31.35 | $40.00 | $30.00 |
| 5 | Flexible pavement structure repair(8") (351-7007) | SY | 12 | $75.00 | $175.00 | $188.00 | $200.00 | $1,050.00 | $200.00 | $330.00 |
| 6 | Flowable backfill (401-7001) | CY | 94 | $385.00 | $475.00 | $510.00 | $298.00 | $273.00 | $300.00 | $500.00 |
| 7 | Temporary special shoring (cofferdam) (403-7002) | SF | 1,922 | $27.50 | $5.00 | $10.00 | $25.00 | $10.50 | $50.00 | $68.00 |
| 8 | Class C concrete (rail foundation) (420-7052) | CY | 2 | $2,150.00 | $2,500.00 | $1,000.00 | $1,000.00 | $2,100.00 | $600.00 | $1,000.00 |
| 9 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 195 | $143.00 | $75.00 | $58.00 | $100.00 | $157.50 | $150.00 | $100.00 |
| 10 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 30 | $148.00 | $175.00 | $210.00 | $100.00 | $315.00 | $150.00 | $120.00 |
| 11 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 327 | $177.50 | $300.00 | $135.00 | $200.00 | $189.00 | $200.00 | $200.00 |
| 12 | Concrete structure repair (standard) (429-7009) | SF | 150 | $215.00 | $150.00 | $140.00 | $150.00 | $168.00 | $100.00 | $200.00 |
| 13 | Riprap (stone protection)(12 in) (432-7041) | CY | 620 | $221.65 | $155.00 | $144.00 | $150.00 | $158.00 | $200.00 | $240.00 |
| 14 | Riprap (stone protection)(18 in) (432-7043) | CY | 1,280 | $200.00 | $155.00 | $144.00 | $150.00 | $168.00 | $180.00 | $245.00 |
| 15 | Riprap (stone protection)(24 in) (432-7045) | CY | 339 | $201.75 | $155.00 | $144.00 | $150.00 | $189.00 | $200.00 | $245.00 |
| 16 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 320 | $50.00 | $50.00 | $55.00 | $20.00 | $42.00 | $40.00 | $30.00 |
| 17 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 1,712 | $45.00 | $50.00 | $48.00 | $35.00 | $52.50 | $50.00 | $58.00 |
| 18 | Header type expansion joint (454-7011) | LF | 84 | $108.66 | $150.00 | $255.00 | $400.00 | $420.00 | $100.00 | $200.00 |
| 19 | Gabions (galvanized) (459-7001) | CY | 184 | $530.00 | $350.00 | $277.00 | $327.00 | $315.00 | $300.00 | $300.00 |
| 20 | Mobilization (500-7001) | LS | 1 | $87,398 | $54,000 | $93,090 | $69,992 | $56,700 | $100,000 | $100,000 |
| 21 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $3,830.00 | $1.00 | $4,500.00 | $5,000.00 | $1.10 | $4,000.00 | $5,000.00 |
| 22 | Portable changeable message sign (503-7001) | DAY | 28 | $83.54 | $1.00 | $1.00 | $600.00 | $262.50 | $100.00 | $1.00 |
| 23 | TMA (stationary) (505-7001) | DAY | 58 | $150.00 | $1.00 | $1.00 | $1,500.00 | $262.50 | $300.00 | $250.00 |
| 24 | Temporary sediment control fence (install) (506-7039) | LF | 1,000 | $4.26 | $3.00 | $1.00 | $10.00 | $2.10 | $5.00 | $1.00 |
| 25 | Temporary sediment control fence (remove) (506-7041) | LF | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.10 | $1.00 | $1.00 |
| 26 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 2 | $2,000.00 | $3,000.00 | $3,500.00 | $3,000.00 | $4,200.00 | $1,500.00 | $1,800.00 |
| 27 | Remove metal beam guard fence (542-7001) | LF | 30 | $3.00 | $50.00 | $10.00 | $35.00 | $10.50 | $5.00 | $5.00 |
| 28 | JT / CRCK seal (hot - poured rubber) (712-7002) | LF | 1,600 | $5.25 | $7.50 | $5.00 | $20.00 | $10.50 | $3.00 | $5.00 |
| 29 | Spalling repair (polymeric) (semirigid) (720-7003) | GAL | 15 | $355.00 | $550.00 | $155.00 | $200.00 | $630.00 | $50.00 | $101.00 |
| 30 | Driftwood removal (735-7060) | CY | 605 | $80.85 | $35.00 | $88.00 | $63.00 | $84.00 | $100.00 | $200.00 |
| 31 | Tree trimming / brush removal(channels) (752-7003) | ACRE | 0.50 | $1,435.00 | $7,500.00 | $5,000.00 | $7,450.00 | $10,500 | $25,000 | $6,000.00 |
| 32 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 10 | $100.00 | $250.00 | $450.00 | $200.00 | $1,050.00 | $1,000.00 | $200.00 |
| 33 | Tree removal (12" - 18" diameter) (752-7006) | EACH | 10 | $110.00 | $250.00 | $450.00 | $500.00 | $2,100.00 | $1,500.00 | $400.00 |
| 34 | Tree removal (18" - 24" diameter) (752-7007) | EACH | 5 | $150.00 | $250.00 | $650.00 | $900.00 | $2,625.00 | $2,000.00 | $999.00 |
| 35 | Concrete rail replacement (in-kind) (778-7004) | LF | 12 | $375.00 | $1,000.00 | $800.00 | $550.00 | $1,260.00 | $500.00 | $400.00 |
| 36 | CNC crack repair (discrete)(inject) (780-7002) | LF | 30 | $63.80 | $250.00 | $45.00 | $100.00 | $126.00 | $50.00 | $100.00 |
| 37 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 12 | $556.00 | $750.00 | $600.00 | $300.00 | $3,150.00 | $200.00 | $2,499.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.