Garret Shields Infrastructure submitted 435 bids on Texas DOT contracts in the data, from 07 SEP 2022 to 12 NOV 2026, and was the low bidder on 96 of them (22%). When it was not low, its total sat a median +24% above the low bid.

Owner
Texas DOT
Low bid volume
$104,229,800
Latest bid
12 NOV 2026
Data through
19 NOV 2026
435Bids
96Low bids
22Win rate, percent
+24%Median gap to the low bid when not low, 339 bids

By year

YearBidsLow bidsWin rate
202219526%
2023351131%
2024521529%
20251532416%
20261764123%
Garret Shields Infrastructure, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District872529%
Paris District501020%
Houston District391231%
Fort Worth District36617%
Bryan District311445%
Lufkin District30723%
Tyler District27415%
Austin District24313%
San Antonio District23313%
Beaumont District16319%
Waco District16213%
Yoakum District15320%
Garret Shields Infrastructure, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Temporary sediment control fence (remove)506-7041LF16894 (56%)$1.00$1.00
Portable changeable message sign503-7002EACH9486 (91%)$1,000.00$10,000
Biodegradable erosion control logs (remove)506-7046LF11569 (60%)$1.00$1.40
Portable changeable message sign503-7001DAY11747 (40%)$100.00$100.00
Barricades, signs and traffic handling502-7001MO33946 (14%)$5,000.00$5,000.00
TMA (stationary)505-7001DAY34837 (11%)$300.00$230.00
Vegetative watering168-7001TGL11732 (27%)$50.00$37.73
Preparing row100-7002STA9432 (34%)$1,000.00$2,750.00
Rock filter dams (remove)506-7011LF8530 (35%)$10.00$12.00
Construction exits (remove)506-7024SY6330 (48%)$5.00$10.00
Rock filter dams (install) (type 2)506-7002LF5530 (55%)$20.00$40.00
Flowable backfill401-7001CY11627 (23%)$450.00$350.00
Garret Shields Infrastructure, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Garret Shields Infrastructure, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 NOV 2026A00222903Dallas DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0035E (IH 35E SB Connector B to At SS 366)1 of 6$237,780Low, 20% under the second
03 NOV 2026A00204003Bryan DistrictBridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK)6 of 15$793,429+10%
03 NOV 2026A00219553Austin DistrictBRIDGE PREVENTATIVE MAINTENANCE, RM2222 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT)6 of 13$1,482,270+37%
28 OCT 2026A00223651Lufkin DistrictBRIDGE PREVENTATIVE MAINTENANCE, US0059 (Various Locations to Various Locations)2 of 8$844,758+24%
15 OCT 2026A00223685Paris DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0030 (Various locations in to Hopkins County)2 of 11$263,600+4.0%
14 OCT 2026A00215965Dallas DistrictBRIDGE PREVENTATIVE MAINTENANCE, FM1385 (At Little Elm Creek Bridge to and Little Elm Creek Relief)1 of 6$83,076Low, 12% under the second
14 OCT 2026A00222907Dallas DistrictCONCRETE STRUCTURE REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section)2 of 4$328,550+62%
14 OCT 2026A00222230Dallas DistrictREPAIR/REPLACE CONCRETE BARRIER, IH0035E (VARIOUS ROADWAYS to DENTON COUNTY MAINTENANCE SECTION)1 of 3$166,500Low, 20% under the second
13 OCT 2026A00223040Tyler DistrictCULVERT REPAIR, SH0294 (Various locations in to the Tyler District)2 of 7$508,479+1.0%
07 OCT 2026A00135746Dallas DistrictConstruct Pedestrian Infrastructure, IH 35E (DART Victory Station to At IH 35E Southbound Frontage Roads)1 of 9$1,177,500Low, 1.0% under the second
07 OCT 2026A00217666Houston DistrictRehabilitate Bridge, Various (Various Locations on IH 45, IH 610, to US 290, and FM 1458)6 of 6$6,360,358+56%
06 OCT 2026A00211479Austin DistrictBridge Maintenance, US 79 (US 79 at Drain to #14-246-0-0204-01-008.)2 of 14$487,798+42%
06 OCT 2026A00206378Bryan DistrictConstruct Pedestrian Infrastructure, FM 486 (Front Street to Salty Street)3 of 10$292,640+14%
06 OCT 2026A00134683Houston DistrictBridge Replacement, POOL HILL RD (Pool Hill Road/CR2030 @ Brookshire Creek to .)1 of 9$1,963,405Low, 5.0% under the second
30 SEP 2026A00223527Lufkin DistrictDITCH CLEANING AND RESHAPING, US0059 (VARIOUS LOCATIONS IN SHELBY COUNTY to MAINTENANCE SECTION)3 of 3$581,300+162%
22 SEP 2026A00223244Beaumont DistrictCULVERT CLEANING, IH0010 (Various to Various)2 of 2$316,100+33%
22 SEP 2026A00218207Abilene DistrictBRIDGE PREVENTATIVE MAINTENANCE, BI0020R (VARIOUS LOCATIONS to IN THE ABILENE DISTRICT)5 of 12$883,730+29%
17 SEP 2026A00222990Paris DistrictEROSION REPAIR, US0075 (Various locations in to Grayson County)1 of 2$167,500Low, 107% under the second
16 SEP 2026A00222875Tyler DistrictCONCRETE SPALL REPAIR, US0080 (Various Locations in to the Tyler District)2 of 8$836,500+25%
15 SEP 2026A00221804Bryan DistrictBRIDGE RAIL RETROFIT, IH0045 (Various to Various)1 of 3$308,110Low, 13% under the second
09 SEP 2026A00221715Dallas DistrictROCK/RIPRAP, US0380 (Various Roadways in the to Denton County Maintenance Section)2 of 4$49,600+24%
09 SEP 2026A00218652Dallas DistrictBRIDGE PREVENTATIVE MAINTENANCE, FM0055 (FM 55 to At Mill Creek)1 of 5$43,618Low, 46% under the second
09 SEP 2026A00222694Dallas DistrictROCK/RIPRAP, SH0005 (Collin County to Maintenance Section)2 of 5$110,000+5.0%
09 SEP 2026A00219985Dallas DistrictEROSION REPAIR, FM1378 (FM 1378 to AT SLOAN CREEK)2 of 3$82,414+3.0%
03 SEP 2026A00139727Paris DistrictBridge Replacement, FM 911 (FM 911 to At Anderson Creek)7 of 8$1,823,131+24%
Garret Shields Infrastructure: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy