Garret Shields Infrastructure: TxDOT bid record
Garret Shields Infrastructure submitted 435 bids on Texas DOT contracts in the data, from 07 SEP 2022 to 12 NOV 2026, and was the low bidder on 96 of them (22%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $104,229,800
- Latest bid
- 12 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 19 | 5 | 26% |
| 2023 | 35 | 11 | 31% |
| 2024 | 52 | 15 | 29% |
| 2025 | 153 | 24 | 16% |
| 2026 | 176 | 41 | 23% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 87 | 25 | 29% |
| Paris District | 50 | 10 | 20% |
| Houston District | 39 | 12 | 31% |
| Fort Worth District | 36 | 6 | 17% |
| Bryan District | 31 | 14 | 45% |
| Lufkin District | 30 | 7 | 23% |
| Tyler District | 27 | 4 | 15% |
| Austin District | 24 | 3 | 13% |
| San Antonio District | 23 | 3 | 13% |
| Beaumont District | 16 | 3 | 19% |
| Waco District | 16 | 2 | 13% |
| Yoakum District | 15 | 3 | 20% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 168 | 94 (56%) | $1.00 | $1.00 |
| Portable changeable message sign | 503-7002 | EACH | 94 | 86 (91%) | $1,000.00 | $10,000 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 115 | 69 (60%) | $1.00 | $1.40 |
| Portable changeable message sign | 503-7001 | DAY | 117 | 47 (40%) | $100.00 | $100.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 339 | 46 (14%) | $5,000.00 | $5,000.00 |
| TMA (stationary) | 505-7001 | DAY | 348 | 37 (11%) | $300.00 | $230.00 |
| Vegetative watering | 168-7001 | TGL | 117 | 32 (27%) | $50.00 | $37.73 |
| Preparing row | 100-7002 | STA | 94 | 32 (34%) | $1,000.00 | $2,750.00 |
| Rock filter dams (remove) | 506-7011 | LF | 85 | 30 (35%) | $10.00 | $12.00 |
| Construction exits (remove) | 506-7024 | SY | 63 | 30 (48%) | $5.00 | $10.00 |
| Rock filter dams (install) (type 2) | 506-7002 | LF | 55 | 30 (55%) | $20.00 | $40.00 |
| Flowable backfill | 401-7001 | CY | 116 | 27 (23%) | $450.00 | $350.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Icos Management, LLC | 89 | 25 of 89 |
| Structural Integrity Group LLC | 87 | 26 of 87 |
| Cross Plus Construction, LLC | 65 | 26 of 65 |
| Built Right Construction of Oklahoma, LLC | 63 | 7 of 63 |
| SCR Civil Construction, LLC | 61 | 12 of 61 |
| Roy Jorgensen Associates, Inc. | 53 | 21 of 53 |
| THK Construction LLC | 51 | 29 of 51 |
| Blacksmith Ventures LLC | 51 | 19 of 51 |
| BK Field Operations LLC | 50 | 37 of 50 |
| Ti-Zack Concrete, LLC | 48 | 16 of 48 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | A00222903 | Dallas District | BRIDGE PREVENTATIVE MAINTENANCE, IH0035E (IH 35E SB Connector B to At SS 366) | 1 of 6 | $237,780 | Low, 20% under the second |
| 03 NOV 2026 | A00204003 | Bryan District | Bridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK) | 6 of 15 | $793,429 | +10% |
| 03 NOV 2026 | A00219553 | Austin District | BRIDGE PREVENTATIVE MAINTENANCE, RM2222 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | 6 of 13 | $1,482,270 | +37% |
| 28 OCT 2026 | A00223651 | Lufkin District | BRIDGE PREVENTATIVE MAINTENANCE, US0059 (Various Locations to Various Locations) | 2 of 8 | $844,758 | +24% |
| 15 OCT 2026 | A00223685 | Paris District | BRIDGE PREVENTATIVE MAINTENANCE, IH0030 (Various locations in to Hopkins County) | 2 of 11 | $263,600 | +4.0% |
| 14 OCT 2026 | A00215965 | Dallas District | BRIDGE PREVENTATIVE MAINTENANCE, FM1385 (At Little Elm Creek Bridge to and Little Elm Creek Relief) | 1 of 6 | $83,076 | Low, 12% under the second |
| 14 OCT 2026 | A00222907 | Dallas District | CONCRETE STRUCTURE REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section) | 2 of 4 | $328,550 | +62% |
| 14 OCT 2026 | A00222230 | Dallas District | REPAIR/REPLACE CONCRETE BARRIER, IH0035E (VARIOUS ROADWAYS to DENTON COUNTY MAINTENANCE SECTION) | 1 of 3 | $166,500 | Low, 20% under the second |
| 13 OCT 2026 | A00223040 | Tyler District | CULVERT REPAIR, SH0294 (Various locations in to the Tyler District) | 2 of 7 | $508,479 | +1.0% |
| 07 OCT 2026 | A00135746 | Dallas District | Construct Pedestrian Infrastructure, IH 35E (DART Victory Station to At IH 35E Southbound Frontage Roads) | 1 of 9 | $1,177,500 | Low, 1.0% under the second |
| 07 OCT 2026 | A00217666 | Houston District | Rehabilitate Bridge, Various (Various Locations on IH 45, IH 610, to US 290, and FM 1458) | 6 of 6 | $6,360,358 | +56% |
| 06 OCT 2026 | A00211479 | Austin District | Bridge Maintenance, US 79 (US 79 at Drain to #14-246-0-0204-01-008.) | 2 of 14 | $487,798 | +42% |
| 06 OCT 2026 | A00206378 | Bryan District | Construct Pedestrian Infrastructure, FM 486 (Front Street to Salty Street) | 3 of 10 | $292,640 | +14% |
| 06 OCT 2026 | A00134683 | Houston District | Bridge Replacement, POOL HILL RD (Pool Hill Road/CR2030 @ Brookshire Creek to .) | 1 of 9 | $1,963,405 | Low, 5.0% under the second |
| 30 SEP 2026 | A00223527 | Lufkin District | DITCH CLEANING AND RESHAPING, US0059 (VARIOUS LOCATIONS IN SHELBY COUNTY to MAINTENANCE SECTION) | 3 of 3 | $581,300 | +162% |
| 22 SEP 2026 | A00223244 | Beaumont District | CULVERT CLEANING, IH0010 (Various to Various) | 2 of 2 | $316,100 | +33% |
| 22 SEP 2026 | A00218207 | Abilene District | BRIDGE PREVENTATIVE MAINTENANCE, BI0020R (VARIOUS LOCATIONS to IN THE ABILENE DISTRICT) | 5 of 12 | $883,730 | +29% |
| 17 SEP 2026 | A00222990 | Paris District | EROSION REPAIR, US0075 (Various locations in to Grayson County) | 1 of 2 | $167,500 | Low, 107% under the second |
| 16 SEP 2026 | A00222875 | Tyler District | CONCRETE SPALL REPAIR, US0080 (Various Locations in to the Tyler District) | 2 of 8 | $836,500 | +25% |
| 15 SEP 2026 | A00221804 | Bryan District | BRIDGE RAIL RETROFIT, IH0045 (Various to Various) | 1 of 3 | $308,110 | Low, 13% under the second |
| 09 SEP 2026 | A00221715 | Dallas District | ROCK/RIPRAP, US0380 (Various Roadways in the to Denton County Maintenance Section) | 2 of 4 | $49,600 | +24% |
| 09 SEP 2026 | A00218652 | Dallas District | BRIDGE PREVENTATIVE MAINTENANCE, FM0055 (FM 55 to At Mill Creek) | 1 of 5 | $43,618 | Low, 46% under the second |
| 09 SEP 2026 | A00222694 | Dallas District | ROCK/RIPRAP, SH0005 (Collin County to Maintenance Section) | 2 of 5 | $110,000 | +5.0% |
| 09 SEP 2026 | A00219985 | Dallas District | EROSION REPAIR, FM1378 (FM 1378 to AT SLOAN CREEK) | 2 of 3 | $82,414 | +3.0% |
| 03 SEP 2026 | A00139727 | Paris District | Bridge Replacement, FM 911 (FM 911 to At Anderson Creek) | 7 of 8 | $1,823,131 | +24% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.