TxDOT contract A00218207 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, BI0020R (VARIOUS LOCATIONS to IN THE ABILENE DISTRICT). Let by Texas DOT on September 22, 2026, Taylor, Abilene District. 12 bids received; low bid $685,424 by Blacksmith Ventures LLC, -27% against the engineer's estimate of $937,100.
- Owner
- Texas DOT
- Letting
- 22 SEP 2026
- Pay items
- 19
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Blacksmith Ventures LLC | $685,424 | Low | -27% |
| 2 | Macias Specialty Contracting LLC | $732,093 | +7.0% | -22% |
| 3 | Road Doctors LLC | $820,200 | +20% | -12% |
| 4 | Rear Contractors LLC | $842,149 | +23% | -10% |
| 5 | Garret Shields Infrastructure | $883,730 | +29% | -6.0% |
| 6 | Ti-Zack Concrete, LLC | $890,710 | +30% | -5.0% |
| 7 | Structural Integrity Group LLC | $901,634 | +32% | -4.0% |
| 8 | Scott Tucker Construction Company, LLC | $936,075 | +37% | 0.0% |
| 9 | Cross Plus Construction, LLC | $949,482 | +39% | +1.0% |
| 10 | MPB, Inc. | $1,013,487 | +48% | +8.0% |
| 11 | Premier Contractors LLC | $1,114,479 | +63% | +19% |
| 12 | The Truesdell Corporation | $1,394,394 | +103% | +49% |
Engineer's estimate: $937,100.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Blacksmith Ventures LLC | 2. Macias Specialty Contracting LLC | 3. Road Doctors LLC | 4. Rear Contractors LLC | 5. Garret Shields Infrastructure | 6. Ti-Zack Concrete, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7007) | CY | 3 | $100.00 | $500.00 | $395.00 | $50.00 | $100.00 | $500.00 | $287.50 |
| 2 | Removing concrete (MSE panels) (104-7026) | SF | 35 | $250.00 | $145.00 | $33.00 | $50.00 | $50.00 | $100.00 | $178.25 |
| 3 | Removing concrete (coping) (104-7027) | LF | 20 | $50.00 | $300.00 | $58.00 | $50.00 | $150.00 | $100.00 | $419.75 |
| 4 | Flowable backfill (401-7001) | CY | 10 | $300.00 | $750.00 | $325.00 | $600.00 | $1,000.00 | $300.00 | $897.00 |
| 5 | Class C concrete (column encasement) (420-7064) | CY | 47 | $750.00 | $1,500.00 | $1,300.00 | $1,500.00 | $1,000.00 | $1,800.00 | $1,437.50 |
| 6 | Class C concrete (coping) (420-7143) | LF | 20 | $400.00 | $300.00 | $190.00 | $200.00 | $250.00 | $300.00 | $1,552.50 |
| 7 | Retaining wall (existing MSE) (fascia) (423-7010) | SF | 35 | $1,000.00 | $145.00 | $115.00 | $50.00 | $350.00 | $50.00 | $517.50 |
| 8 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 810 | $130.00 | $115.00 | $65.00 | $200.00 | $200.00 | $100.00 | $143.75 |
| 9 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 2,760 | $150.00 | $127.00 | $135.00 | $100.00 | $140.00 | $170.00 | $132.25 |
| 10 | Riprap (concrete)(CL B) (432-7005) | CY | 3 | $1,000.00 | $1,200.00 | $800.00 | $800.00 | $2,000.00 | $1,000.00 | $862.50 |
| 11 | Riprap (stone protection)(18 in) (432-7043) | CY | 531 | $300.00 | $208.00 | $180.00 | $250.00 | $190.00 | $160.00 | $109.25 |
| 12 | Cleaning and sealing existing joints (438-7001) | LF | 40 | $50.00 | $25.00 | $60.00 | $100.00 | $76.00 | $50.00 | $178.25 |
| 13 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 54 | $60.00 | $25.00 | $22.00 | $100.00 | $75.00 | $50.00 | $212.75 |
| 14 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 328 | $45.00 | $25.00 | $25.00 | $100.00 | $50.00 | $40.00 | $132.25 |
| 15 | Mobilization (500-7001) | LS | 1 | $64,800 | $1.00 | $70,000 | $80,000 | $70,000 | $70,000 | $28,750 |
| 16 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $10,000 | $1.00 | $3,500.00 | $2,500.00 | $1.00 | $5,000.00 | $17,825 |
| 17 | TMA (stationary) (505-7001) | DAY | 64 | $300.00 | $235.00 | $310.00 | $50.00 | $1.00 | $300.00 | $258.75 |
| 18 | Driftwood removal (735-7060) | CY | 60 | $70.00 | $1.00 | $105.00 | $200.00 | $100.00 | $120.00 | $115.00 |
| 19 | CNC crack repair (discrete)(inject) (780-7002) | LF | 80 | $75.00 | $5.00 | $97.00 | $150.00 | $100.00 | $50.00 | $51.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 22, 2026. Compiled by Mirage Metrics.