TxDOT contract A00219553 bid tabulation

BRIDGE PREVENTATIVE MAINTENANCE, RM2222 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT). Let by Texas DOT on November 3, 2026, Travis, Austin District. 13 bids received; low bid $1,080,402 by Road Doctors LLC, -16% against the engineer's estimate of $1,289,420.

Owner
Texas DOT
Letting
03 NOV 2026
Pay items
16
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Road Doctors LLC$1,080,402Low-16%
2Digg Commercial, LLC$1,188,500+10%-8.0%
3The Truesdell Corporation$1,352,352+25%+5.0%
4Structural Integrity Group LLC$1,394,989+29%+8.0%
5Icos Management, LLC$1,455,038+35%+13%
6Garret Shields Infrastructure$1,482,270+37%+15%
7Premier Contractors LLC$1,572,351+46%+22%
8Restek, Inc.$1,653,920+53%+28%
9SCR Civil Construction, LLC$1,712,690+59%+33%
10Taylor Bridge LLC$1,742,010+61%+35%
11Blacksmith Ventures LLC$1,798,946+67%+40%
12Rear Contractors LLC$2,056,221+90%+59%
13Southern Road & Bridge, LLC$2,969,200+175%+130%
TxDOT contract A00219553: bids by rank

Engineer's estimate: $1,289,420.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Road Doctors LLC2. Digg Commercial, LLC3. The Truesdell Corporation4. Structural Integrity Group LLC5. Icos Management, LLC6. Garret Shields Infrastructure
1Block sodding (162-7002)SY1,500$6.00$10.00$15.00$1.00$10.00$8.40$8.00
2Broadcast seed (temporary_warm) (164-7005)SY2,000$0.50$2.00$5.00$1.00$2.00$2.10$0.50
3Broadcast seed (temporary_cool) (164-7006)SY2,000$0.35$2.00$0.01$1.00$2.00$2.10$0.50
4Vegetative watering (168-7001)TGL80$75.00$250.00$50.00$1.00$45.00$10.50$50.00
5Concrete structure repair (vertical & overhead) (429-7007)SF945$150.00$80.00$210.00$180.00$260.50$168.00$200.00
6Riprap (stone common)(dry)(24 in) (432-7034)CY1,175$250.00$170.00$220.00$250.00$238.00$189.00$250.00
7Cleaning and sealing existing joints (438-7001)LF10,493$40.00$39.00$10.00$38.00$37.00$47.25$40.00
8Clean existing culverts (480-7001)EACH29$1,000.00$1,000.00$1,024.00$2,600.00$3,740.00$5,250.00$5,000.00
9Mobilization (500-7001)LS1$125,000$65,000$99,976$201,118$131,000$91,000$80,000
10Barricades, signs and traffic handling (502-7001)MO6$5,000.00$2,000.00$7,000.00$2,700.00$2,500.00$1.10$5,000.00
11TMA (stationary) (505-7001)DAY75$250.00$1.00$2,500.00$200.00$225.00$262.50$500.00
12Temporary sediment control fence (install) (506-7039)LF3,000$1.50$6.00$10.00$1.00$2.00$2.10$5.00
13Temporary sediment control fence (remove) (506-7041)LF3,000$1.00$1.50$1.00$1.00$1.00$1.10$1.00
14Driftwood removal (735-7061)LS19$2,500.00$4,000.00$1,000.00$4,000.00$2,000.00$5,250.00$2,500.00
15CNC crack repair (discrete)(inject) (780-7002)LF1,670$75.00$75.00$78.00$45.00$47.00$52.50$100.00
16Bent cap/abutment cap cleaning (7001-7002)EACH46$750.00$500.00$1,058.00$420.00$1,250.00$2,100.00$800.00
TxDOT contract A00219553: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 3, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy