TxDOT contract A00223651 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, US0059 (Various Locations to Various Locations). Let by Texas DOT on October 28, 2026, Angelina, Lufkin District. 8 bids received; low bid $681,151 by Blacksmith Ventures LLC, -32% against the engineer's estimate of $999,970.
- Owner
- Texas DOT
- Letting
- 28 OCT 2026
- Pay items
- 25
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Blacksmith Ventures LLC | $681,151 | Low | -32% |
| 2 | Garret Shields Infrastructure | $844,758 | +24% | -16% |
| 3 | Ace Contractors, Inc. | $893,898 | +31% | -11% |
| 4 | Shalom Services Corporation | $959,894 | +41% | -4.0% |
| 5 | Icos Management, LLC | $962,069 | +41% | -4.0% |
| 6 | Road Doctors LLC | $966,295 | +42% | -3.0% |
| 7 | Rear Contractors LLC | $1,158,023 | +70% | +16% |
| 8 | Structural Integrity Group LLC | $1,509,149 | +122% | +51% |
Engineer's estimate: $999,970.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Blacksmith Ventures LLC | 2. Garret Shields Infrastructure | 3. Ace Contractors, Inc. | 4. Shalom Services Corporation | 5. Icos Management, LLC | 6. Road Doctors LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 447 | $50.00 | $42.00 | $30.00 | $75.00 | $60.00 | $52.50 | $75.00 |
| 2 | Spec excavation work (hyd excavator) (158-7002) | HR | 54 | $200.00 | $1.00 | $120.00 | $75.00 | $250.00 | $420.00 | $150.00 |
| 3 | Block sodding (162-7002) | SY | 1,000 | $5.00 | $1.00 | $8.00 | $0.50 | $5.00 | $7.35 | $50.00 |
| 4 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7073) | SY | 2,000 | $1.00 | $0.25 | $0.40 | $0.50 | $1.00 | $1.05 | $1.00 |
| 5 | Vegetative watering (168-7001) | TGL | 40 | $20.00 | $0.25 | $50.00 | $0.50 | $100.00 | $10.50 | $100.00 |
| 6 | Flowable backfill (401-7001) | CY | 18 | $450.00 | $1,100.00 | $300.00 | $300.00 | $750.00 | $336.00 | $350.00 |
| 7 | Class C concrete(pile encasement) (420-7059) | LF | 68 | $1,000.00 | $558.00 | $1,200.00 | $1,000.00 | $1,000.00 | $567.00 | $600.00 |
| 8 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 47 | $250.00 | $250.00 | $200.00 | $250.00 | $500.00 | $210.00 | $200.00 |
| 9 | Riprap (stone protection)(24 in) (432-7045) | CY | 1,490 | $250.00 | $232.00 | $200.00 | $250.00 | $285.00 | $220.50 | $175.00 |
| 10 | Cleaning and sealing existing joints (438-7001) | LF | 3,108 | $45.00 | $30.00 | $36.00 | $45.00 | $28.00 | $63.00 | $40.00 |
| 11 | Miscellaneous non-bridge (nbis) (442-7017) | LB | 119.60 | $225.00 | $41.80 | $50.00 | $50.00 | $250.00 | $105.00 | $250.00 |
| 12 | Rail (type T631) (450-7020) | LF | 400 | $100.00 | $125.00 | $150.00 | $110.00 | $165.00 | $147.00 | $175.00 |
| 13 | Mobilization (500-7001) | LS | 1 | $90,000 | $1.00 | $60,000 | $39,000 | $30,000 | $76,000 | $90,000 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $3,600.00 | $1.00 | $5,000.00 | $1.00 | $2,500.00 | $1.05 | $5,000.00 |
| 15 | TMA (stationary) (505-7001) | DAY | 100 | $240.00 | $325.00 | $300.00 | $250.00 | $1.00 | $189.00 | $150.00 |
| 16 | Rock filter dams (remove) (506-7011) | LF | 100 | $20.00 | $1.00 | $10.00 | $50.00 | $10.00 | $10.50 | $50.00 |
| 17 | Temporary sediment control fence (install) (506-7039) | LF | 1,500 | $10.00 | $0.25 | $5.00 | $0.50 | $3.00 | $2.10 | $20.00 |
| 18 | Temporary sediment control fence (remove) (506-7041) | LF | 1,500 | $5.00 | $0.25 | $1.00 | $0.50 | $1.00 | $1.05 | $3.00 |
| 19 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,000 | $30.00 | $30.00 | $35.00 | $40.00 | $27.00 | $17.85 | $27.00 |
| 20 | Remove metal beam guard fence (542-7001) | LF | 800 | $15.00 | $4.00 | $5.00 | $10.00 | $10.00 | $4.20 | $4.00 |
| 21 | Guardrail end treatment (install) (544-7001) | EACH | 8 | $3,250.00 | $3,300.00 | $3,500.00 | $4,000.00 | $4,000.00 | $3,360.00 | $3,200.00 |
| 22 | Guardrail end treatment (remove) (544-7003) | EACH | 8 | $250.00 | $400.00 | $500.00 | $1.00 | $300.00 | $420.00 | $300.00 |
| 23 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 20 | $20.00 | $50.00 | $40.00 | $40.00 | $50.00 | $42.00 | $75.00 |
| 24 | Driftwood removal (735-7061) | LS | 22 | $2,500.00 | $2.00 | $2,000.00 | $2,500.00 | $3,000.00 | $4,200.00 | $4,000.00 |
| 25 | Spot tree trimming / brush removal (752-7002) | LF | 200 | $50.00 | $1.00 | $5.00 | $5.00 | $50.00 | $52.50 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 28, 2026. Compiled by Mirage Metrics.