Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Garret Shields Infrastructure | $1,963,405 | Low | -8.0% |
| 2 | John Reed and Company, LLC | $2,067,046 | +5.0% | -3.0% |
| 3 | Texas Steel Industrial Placing, LLC | $2,082,144 | +6.0% | -2.0% |
| 4 | Jfo Services, LLC | $2,119,280 | +8.0% | 0.0% |
| 5 | STX Civil | $2,195,624 | +12% | +3.0% |
| 6 | Trevway, Inc. | $2,267,997 | +16% | +7.0% |
| 7 | Forde Construction Company, Inc. | $2,548,135 | +30% | +20% |
| 8 | Earth Builders, L.P. | $2,983,322 | +52% | +40% |
| 9 | Isi Contracting, Inc. | $3,218,689 | +64% | +51% |
Engineer's estimate: $2,127,190.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Garret Shields Infrastructure | 2. John Reed and Company, LLC | 3. Texas Steel Industrial Placing, LLC | 4. Jfo Services, LLC | 5. STX Civil | 6. Trevway, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (miscellaneous) (104-7047) | CY | 313 | $50.00 | $100.00 | $150.00 | $60.00 | $92.55 | $103.67 | $64.00 |
| 2 | Remove (8"-12") TRT/untrt base & asphalt pavement (105-7008) | SY | 733 | $30.00 | $20.00 | $30.00 | $11.67 | $29.12 | $20.00 | |
| 3 | Remove (11"-15") TRT/untrt base & asphalt pavement (105-7011) | SY | 808 | $12.96 | $40.00 | $20.00 | $35.00 | $11.67 | $29.12 | $20.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 392 | $29.64 | $30.00 | $40.00 | $20.00 | $17.09 | $63.59 | $21.00 |
| 5 | Embankment (final)(DC)(type C) (132-7006) | CY | 398 | $15.95 | $40.00 | $60.00 | $20.00 | $31.88 | $86.49 | $35.00 |
| 6 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 1,358 | $1.32 | $0.25 | $0.30 | $0.55 | $1.80 | $1.62 | $1.26 |
| 7 | Soil ret BLKT(SL_mod_clay_short_roll) (169-7009) | SY | 63 | $1.54 | $5.00 | $3.00 | $1.59 | $21.03 | $2.70 | $5.00 |
| 8 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 425 | $15.79 | $10.00 | $12.00 | $14.25 | $11.67 | $34.66 | $69.47 |
| 9 | D-GR HMA type-B PG70-22 (341-7006) | TON | 1,218 | $147.42 | $175.00 | $150.00 | $194.50 | $233.55 | $139.64 | $245.68 |
| 10 | D-GR HMA type D PG70-22 (341-7048) | TON | 245 | $400.00 | $240.00 | $160.00 | $274.00 | $233.55 | $202.25 | $346.11 |
| 11 | Tack coat (341-7082) | GAL | 318 | $2.20 | $10.00 | $12.00 | $4.00 | $11.67 | $21.06 | $5.00 |
| 12 | Cem stabil BKFL (400-7010) | CY | 152 | $223.67 | $200.00 | $120.00 | $150.00 | $58.86 | $183.57 | $150.00 |
| 13 | Temporary special shoring (403-7001) | SF | 113 | $60.00 | $20.00 | $9.00 | $202.75 | $117.62 | $100.00 | |
| 14 | Drilled shaft (24 in) (416-7004) | LF | 357 | $260.00 | $260.00 | $350.00 | $170.71 | $285.77 | $366.68 | |
| 15 | Drilled shaft (36 in) (416-7006) | LF | 256 | $351.72 | $260.00 | $380.00 | $400.00 | $367.94 | $265.68 | $326.37 |
| 16 | Class C concrete (abutment) (420-7012) | CY | 57 | $1,715.02 | $1,200.00 | $1,950.00 | $1,700.00 | $1,219.66 | $2,045.97 | $875.82 |
| 17 | Reinforced concrete slab (422-7001) | SF | 2,176 | $28.75 | $25.00 | $50.00 | $25.00 | $40.28 | $29.06 | $19.00 |
| 18 | Reinforced concrete slab (slab beam) (422-7007) | SF | 1,446 | $20.00 | $40.00 | $25.00 | $46.40 | $31.27 | $35.00 | |
| 19 | Approach slab (422-7013) | CY | 96.40 | $660.52 | $800.00 | $1,200.00 | $700.00 | $720.14 | $623.27 | $649.14 |
| 20 | Retaining wall (cast-in-place) (423-7016) | SF | 84 | $190.00 | $200.00 | $550.00 | $933.54 | $626.93 | $300.00 | |
| 21 | Prestressed concrete girder (TX28) (425-7001) | LF | 270 | $255.90 | $280.00 | $280.00 | $300.00 | $282.99 | $352.74 | $314.98 |
| 22 | Prestressed concrete slab beam (4SB15) (425-7018) | LF | 356 | $280.00 | $220.00 | $300.00 | $272.96 | $302.07 | $324.00 | |
| 23 | Riprap (concrete)(5 in) (432-7002) | CY | 106.50 | $540.10 | $600.00 | $450.00 | $575.00 | $716.99 | $580.90 | $550.00 |
| 24 | Riprap (mow strip)(4 in) (432-7013) | CY | 37 | $711.67 | $600.00 | $500.00 | $575.00 | $727.33 | $528.02 | $450.00 |
| 25 | Rail (type T223) (450-7008) | LF | 282 | $220.62 | $100.00 | $225.00 | $135.00 | $156.66 | $211.18 | $131.96 |
| 26 | Type A joint (454-7001) | LF | 64 | $75.00 | $20.00 | $70.00 | $23.36 | $42.00 | $15.00 | |
| 27 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 63 | $210.32 | $180.00 | $180.00 | $180.00 | $309.55 | $194.36 | $266.00 |
| 28 | RC pipe (CL III)(36 in) (464-7009) | LF | 314 | $139.90 | $300.00 | $120.00 | $145.00 | $144.06 | $152.30 | $160.17 |
| 29 | RC pipe (arch)(CL III)(des 1) (464-7040) | LF | 51 | $300.00 | $260.00 | $180.00 | $259.12 | $362.30 | $353.44 | |
| 30 | Inl(CMP)(pazd-CZ)(FG)(5FTX5FT-4FTX4FT) (465-7167) | EACH | 3 | $10,117 | $6,000.00 | $9,000.00 | $11,000 | $6,539.53 | $8,695.21 | $14,367 |
| 31 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 1 | $1,500.00 | $1,200.00 | $2,500.00 | $3,425.56 | $2,173.80 | $5,381.82 | |
| 32 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 3 | $8,458.67 | $5,000.00 | $5,100.00 | $4,500.00 | $7,166.80 | $4,709.90 | $9,700.00 |
| 33 | Removing structure (pipe) (496-7007) | LF | 223 | $19.36 | $20.00 | $20.00 | $100.00 | $61.83 | $97.00 | $62.29 |
| 34 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 1 | $15,000 | $48,000 | $30,000 | $23,355 | $42,677 | $30,000 | |
| 35 | Mobilization (500-7001) | LS | 1 | $194,934 | $200,000 | $195,000 | $208,000 | $195,002 | $195,736 | $200,000 |
| 36 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $7,500.00 | $5,000.00 | $5,000.00 | $3,000.00 | $1,484.03 | $3,474.84 | $1,894.74 |
| 37 | TMA (stationary) (505-7001) | DAY | 6 | $1,000.00 | $600.00 | $900.00 | $291.94 | $267.00 | $600.00 | |
| 38 | Rock filter dams (install) (type 2) (506-7002) | LF | 97 | $65.06 | $25.00 | $120.00 | $45.00 | $40.87 | $19.43 | $12.00 |
| 39 | Rock filter dams (remove) (506-7011) | LF | 97 | $36.60 | $10.00 | $15.00 | $20.00 | $17.52 | $6.48 | $1.00 |
| 40 | Temporary sediment control fence (install) (506-7039) | LF | 1,208 | $5.59 | $5.00 | $4.00 | $3.75 | $2.93 | $3.87 | $4.00 |
| 41 | Temporary sediment control fence (remove) (506-7041) | LF | 1,208 | $2.06 | $1.00 | $1.00 | $1.00 | $0.76 | $1.03 | $1.00 |
| 42 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 44 | $9.23 | $5.00 | $8.00 | $10.50 | $14.01 | $5.40 | $10.00 |
| 43 | Biodegradable erosion control logs (remove) (506-7046) | LF | 44 | $0.25 | $1.00 | $1.00 | $2.00 | $7.00 | $2.16 | $1.00 |
| 44 | Constructing detours (508-7001) | SY | 444 | $120.00 | $60.00 | $170.00 | $66.72 | $257.47 | $200.00 | |
| 45 | One-way traffic control (port traffic signal) (510-7003) | MO | 14 | $5,000.00 | $1,200.00 | $4,000.00 | $3,476.23 | $3,253.13 | $3,789.47 | |
| 46 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 180 | $100.00 | $81.01 | $100.00 | $110.70 | $75.63 | $132.00 | |
| 47 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 340 | $100.00 | $70.30 | $50.00 | $29.14 | $73.73 | $138.00 | |
| 48 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 80 | $100.00 | $84.52 | $50.00 | $66.92 | $78.33 | $100.00 | |
| 49 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 180 | $40.00 | $40.01 | $20.00 | $10.98 | $39.81 | $22.00 | |
| 50 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 180 | $40.00 | $40.01 | $20.00 | $5.49 | $39.17 | $22.00 | |
| 51 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 40 | $40.00 | $75.05 | $20.00 | $24.70 | $58.75 | $22.00 | |
| 52 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 180 | $40.00 | $66.02 | $25.00 | $54.77 | $34.81 | $182.88 | |
| 53 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 340 | $40.00 | $45.00 | $25.00 | $15.79 | $39.17 | $35.00 | |
| 54 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 80 | $40.00 | $45.00 | $25.00 | $23.30 | $58.75 | $35.00 | |
| 55 | Driveways (ACP) (530-7010) | SY | 203 | $50.03 | $100.00 | $180.00 | $100.00 | $280.39 | $131.94 | $133.00 |
| 56 | Metal W-beam guard fence (steel post) (540-7002) | LF | 175 | $40.00 | $50.00 | $34.00 | $51.56 | $47.65 | $47.20 | |
| 57 | Metal thrie-beam guard fence (steel post) (540-7020) | EACH | 4 | $1,500.00 | $2,400.00 | $1,500.00 | $2,382.19 | $2,201.64 | $2,367.49 | |
| 58 | Remove metal beam guard fence (542-7001) | LF | 192 | $10.17 | $5.00 | $3.75 | $3.00 | $4.38 | $4.05 | $17.71 |
| 59 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,500.00 | $4,500.00 | $3,000.00 | $4,425.33 | $4,089.93 | $3,900.00 | |
| 60 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $355.83 | $500.00 | $500.00 | $375.00 | $566.35 | $523.43 | $424.96 |
| 61 | Crash cushion attenuator (install)(L)(N)(TL2) (545-7005) | EACH | 4 | $35,470 | $10,000 | $24,000 | $25,000 | $39,353 | $26,873 | $32,934 |
| 62 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 17 | $948.30 | $1,000.00 | $1,079.00 | $811.00 | $866.47 | $1,006.93 | $1,057.57 |
| 63 | Remove SM RD SN sup&AM (644-7073) | EACH | 12 | $332.70 | $500.00 | $125.00 | $90.00 | $99.26 | $112.24 | $1.00 |
| 64 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 41 | $38.13 | $40.00 | $25.00 | $25.00 | $40.87 | $31.30 | $96.81 |
| 65 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 7 | $101.67 | $40.00 | $75.00 | $111.00 | $116.77 | $138.14 | $270.62 |
| 66 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 2,231 | $1.50 | $3.00 | $3.00 | $3.21 | $3.10 | $6.32 | |
| 67 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 60 | $17.00 | $5.00 | $5.00 | $11.67 | $15.54 | $15.16 | |
| 68 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 92 | $5.80 | $3.00 | $3.00 | $3.21 | $3.10 | $2.92 | |
| 69 | Reflectorized pavement marking type I(W)24"(solid)(100MIL)(callout) (666-7151) | LF | 11 | $58.00 | $25.00 | $25.00 | $17.51 | $15.54 | $15.16 | |
| 70 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 1,519 | $0.47 | $2.00 | $2.52 | $2.52 | $2.33 | $6.30 | $6.15 |
| 71 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 1,519 | $0.47 | $2.00 | $2.52 | $2.52 | $2.33 | $6.30 | $6.15 |
| 72 | Pavement sler 6" (666-7347) | LF | 452 | $0.11 | $1.25 | $0.25 | $0.25 | $0.35 | $1.30 | $1.26 |
| 73 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 19 | $9.30 | $65.00 | $10.00 | $10.00 | $6.95 | $7.12 | $6.95 |
| 74 | Pavement surface preparation for marking (6") (678-7002) | LF | 3,038 | $1.28 | $0.25 | $0.20 | $0.20 | $0.23 | $0.32 | $0.32 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.