Texas Steel Industrial Placing, LLC: TxDOT bid record
Texas Steel Industrial Placing, LLC submitted 79 bids on Texas DOT contracts in the data, from 03 JUN 2021 to 07 OCT 2026, and was the low bidder on 10 of them (13%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $20,568,204
- Latest bid
- 07 OCT 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 5 | 3 | 60% |
| 2022 | 9 | 3 | 33% |
| 2025 | 34 | 1 | 3% |
| 2026 | 31 | 3 | 10% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Yoakum District | 25 | 8 | 32% |
| Fort Worth District | 8 | 0 | 0% |
| Bryan District | 6 | 0 | 0% |
| Paris District | 6 | 0 | 0% |
| Corpus Christi District | 5 | 0 | 0% |
| Dallas District | 5 | 0 | 0% |
| Waco District | 4 | 0 | 0% |
| Amarillo District | 3 | 0 | 0% |
| Wichita Falls District | 3 | 2 | 67% |
| San Antonio District | 3 | 0 | 0% |
| Houston District | 2 | 0 | 0% |
| Lufkin District | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sediment control fence (remove) | 506-7041 | LF | 68 | 21 (31%) | $1.00 | $1.00 |
| Preparing row | 100-7002 | STA | 64 | 21 (33%) | $2,000.00 | $2,750.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 78 | 19 (24%) | $2,000.00 | $5,000.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 54 | 15 (28%) | $3,250.00 | $3,245.00 |
| Cem stabil BKFL | 400-7010 | CY | 55 | 14 (25%) | $200.00 | $200.00 |
| Vegetative watering | 168-7001 | TGL | 39 | 10 (26%) | $50.00 | $37.73 |
| Block sodding | 162-7002 | SY | 20 | 10 (50%) | $6.00 | $6.20 |
| TMA (stationary) | 505-7001 | DAY | 40 | 9 (23%) | $250.00 | $230.00 |
| Reinforced concrete slab | 422-7001 | SF | 21 | 9 (43%) | $23.00 | $27.00 |
| Excavation (roadway) | 110-7001 | CY | 62 | 8 (13%) | $20.00 | $20.00 |
| Class C concrete (abutment) | 420-7012 | CY | 40 | 8 (20%) | $1,250.00 | $1,315.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 39 | 8 (21%) | $110.00 | $110.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| STX Civil | 40 | 22 of 40 |
| Hodges and Son Construction Company, Inc. | 30 | 16 of 30 |
| Garret Shields Infrastructure | 23 | 14 of 23 |
| E-Z Bel Construction, LLC | 21 | 11 of 21 |
| Ti-Zack Concrete, LLC | 16 | 8 of 16 |
| Hunter Industries, LTD. | 14 | 5 of 14 |
| Skyline Bridge LLC | 14 | 4 of 14 |
| C. E. Barker, LTD. | 14 | 4 of 14 |
| Coppell Construction Co., Inc. | 12 | 3 of 12 |
| Knife River Corporation - South | 12 | 6 of 12 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | A00191892 | Odessa District | Bridge Replacement, US 90 (Sanderson Canyon and Union Pacific RR to .) | 3 of 7 | $8,495,711 | +26% |
| 07 OCT 2026 | A00218294 | Fort Worth District | BRIDGE PREVENTATIVE MAINTENANCE, SH0114 (VARIOUS LOCATIONS WITHIN to Jack & Wise Counties) | 4 of 7 | $1,999,337 | +92% |
| 06 OCT 2026 | A00134683 | Houston District | Bridge Replacement, POOL HILL RD (Pool Hill Road/CR2030 @ Brookshire Creek to .) | 3 of 9 | $2,082,144 | +6.0% |
| 03 SEP 2026 | A00184830 | Amarillo District | Bridge Replacement, IH 40 (IH 40 AT SH 207 to .) | 4 of 7 | $12,935,696 | +31% |
| 02 SEP 2026 | A00192185 | Houston District | Bridge Replacement, FM 2004 (At Highland Bayou to .) | 4 of 11 | $3,701,646 | +16% |
| 02 SEP 2026 | A00207438 | Wichita Falls District | Bridge Replacement, HOWARD RD (CR 194 (Signed Howard Rd) to at North Fork Village Creek and at Draw) | 1 of 6 | $2,804,230 | Low, 1.0% under the second |
| 02 SEP 2026 | A00207409 | Yoakum District | Bridge Replacement, COUNTY ROAD 125 (at Draw to STR # AA02-49-001) | 2 of 12 | $2,699,424 | +1.0% |
| 06 AUG 2026 | A00194280 | Waco District | Construct Pedestrian Infrastructure, FM 3470 (SH 201 to IH 14) | 3 of 8 | $4,372,041 | +7.0% |
| 06 AUG 2026 | A00136986 | San Antonio District | Bridge Replacement, IH 10 (At SH 80 to .) | 2 of 8 | $5,956,399 | +4.0% |
| 06 AUG 2026 | A00214454 | Fort Worth District | Bridge Replacement, COUNTY ROAD 1590 (AT BIG SANDY CREEK to .) | 3 of 8 | $999,854 | +4.0% |
| 05 AUG 2026 | A00206966 | Paris District | Construct Pedestrian Infrastructure, SH 5 (Newport Drive to Umphress Street) | 6 of 10 | $1,165,169 | +17% |
| 05 AUG 2026 | A00189667 | Fort Worth District | Bicycle And Pedestrian Improvements, Various (Fort Worth District to City of Weatherford) | 6 of 7 | $3,079,682 | +40% |
| 05 AUG 2026 | A00206283 | Yoakum District | Bridge Replacement, FREYBURG ENGLE RD (@ ROCKY CREEK to STR# AA02-75-002 (FREYBURG-ENGLE RD)) | 2 of 9 | $1,730,087 | +7.0% |
| 05 AUG 2026 | A00217911 | Dallas District | Bridge Maintenance, US 80 (at Big Brushy Creek to .) | 5 of 10 | $1,115,555 | +40% |
| 02 JUL 2026 | A00206483 | Yoakum District | Hazard Elimination & Safety, SH 71 (7.80 Mi N of Wharton C/L to Wharton C/L) | 3 of 9 | $5,488,592 | +15% |
| 01 JUL 2026 | A00219976 | Yoakum District | Construct Pedestrian Infrastructure, FM 155 (IH 10 to Near Northern City Limits of Weimar) | 1 of 10 | $1,630,795 | Low, 3.0% under the second |
| 01 JUL 2026 | A00131299 | Waco District | Bridge Replacement, county road 443 (CR 254 @ PERRY CREEK to (MAP #82)) | 2 of 8 | $2,167,348 | +4.0% |
| 07 MAY 2026 | A00210343 | Dallas District | Bicycle And Pedestrian Improvements, Various (Various Locations along SH 78 to In the Dallas District) | 6 of 8 | $3,512,170 | +31% |
| 07 MAY 2026 | A00207502 | San Antonio District | Bridge Replacement, FM 1107 (At Ecleto Creek to .) | 8 of 17 | $1,171,456 | +23% |
| 06 MAY 2026 | A00206377 | Bryan District | Construct Pedestrian Infrastructure, FM 3090 (SH 6 SB Frontage Road to N. Railroad Street) | 3 of 10 | $2,084,195 | +14% |
| 06 MAY 2026 | A00135827 | Paris District | Bridge Replacement, CRAFT RD (Craft Rd to At Choctaw Creek Tributary) | 5 of 10 | $938,592 | +17% |
| 06 MAY 2026 | A00139927 | San Angelo District | Bridge Replacement, FM 72 (At Spring Creek Bridge to -) | 6 of 10 | $5,539,335 | +26% |
| 05 MAR 2026 | A00200904 | Beaumont District | Bridge Replacement, COUNTY ROAD 2018 (AT HACKBERRY BRANCH to STR# 201760AA0367001) | 3 of 8 | $1,775,911 | +20% |
| 05 MAR 2026 | A00195344 | Paris District | Bridge Replacement, FM 816 (At Loring Creek Relief to .) | 4 of 12 | $2,269,867 | +9.0% |
| 05 MAR 2026 | A00207303 | Paris District | Construct Pedestrian Infrastructure, Various (Spur 503 to Loy Lake Rd) | 3 of 11 | $2,827,011 | +3.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.