TxDOT letting results, March 5, 2026
33 contracts let by Texas DOT on March 5, 2026, $53,026,843 in low bids, a median of 6 bidders per contract. On the 33 with an engineer's estimate, the low bid came in under it 22 times; median low bid -12% against the estimate.
- Owner
- Texas DOT
- Contracts
- 33
- Low bids, total
- $53,026,843
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00214435 | DRY DOCKING FERRY BOATS, SH0361 (SH0361 to at Ferry Landing) | Corpus Christi District | 1 | Palacios Shipyard, Inc. | $6,619,350 | 0.0% | TxDOT | ||
| A00214708 | SWEEPING AND DEBRIS REMOVAL, IH0069 (IH 69, etc. to IH 69, etc.) | Houston District | 2 | Elite Kings Construction, LLC | $5,003,000 | $5,095,883 | +2.0% | -1.0% | TxDOT |
| A00209676 | Rehabilitate Bridge, Various (Various Locations on IH 45 and IH 610 to .) | Houston District | 6 | Southern Road & Bridge, LLC | $4,927,653 | $5,129,595 | +4.0% | +42% | TxDOT |
| A00207303 | Construct Pedestrian Infrastructure, Various (Spur 503 to Loy Lake Rd) | Paris District | 11 | Scout 5 Construction LLC | $2,744,602 | $2,763,804 | +1.0% | -7.0% | TxDOT |
| A00208872 | Install/Replace Signs, Various (Various Locations in Hallettsville to LaGrange, Calhoun and Austin County) | Yoakum District | 6 | Vaca Underground Utilities Inc | $2,600,761 | $2,911,966 | +12% | +2.0% | TxDOT |
| A00135150 | Resurface Roadway, SH 211 (FM 1957 to US 90) | San Antonio District | 8 | Bobcat Services, Inc. | $2,498,078 | $2,535,515 | +1.0% | -24% | TxDOT |
| A00217747 | MILL AND INLAY, US0079 (9th St to Anderson St.) | Bryan District | 7 | Texas Materials Group, Inc. | $2,329,117 | $2,387,380 | +3.0% | +5.0% | TxDOT |
| A00195344 | Bridge Replacement, FM 816 (At Loring Creek Relief to .) | Paris District | 12 | Hodges and Son Construction Company, Inc. | $2,085,509 | $2,125,564 | +2.0% | -23% | TxDOT |
| A00191311 | Hazard Elimination & Safety, Various (various locations in to the Lubbock District) | Lubbock District | 5 | L&L Company | $1,984,573 | $2,289,373 | +15% | +14% | TxDOT |
| A00218072 | Install Traffic Signal, SH 78 (at CR 550 to in Farmersville) | Dallas District | 8 | Elecnor Belco Electric, Inc. | $1,754,724 | $1,991,344 | +13% | -15% | TxDOT |
| A00138814 | Preventive Maintenance, SH 11 (SH 19 to SH 154) | Paris District | 4 | RK Hall, LLC | $1,638,858 | $1,687,995 | +3.0% | -16% | TxDOT |
| A00197284 | Bridge Maintenance, Various (Various Bridge locations: Burnet to Blanco, Gillespie, Llano & Mason) | Austin District | 14 | Premier Contractors LLC | $1,606,502 | $1,728,062 | +8.0% | -14% | TxDOT |
| A00193765 | Traffic Signal Improvements, SH 352 (at Galloway Ave to in the City of Mesquite) | Dallas District | 8 | Elecnor Belco Electric, Inc. | $1,590,456 | $1,986,243 | +25% | -31% | TxDOT |
| A00209819 | Preventive Maintenance, FM 110 (IH 35 to SH 123) | Austin District | 7 | Dean Word Company, LTD. | $1,570,963 | $1,673,884 | +7.0% | -37% | TxDOT |
| A00200904 | Bridge Replacement, COUNTY ROAD 2018 (AT HACKBERRY BRANCH to STR# 201760AA0367001) | Beaumont District | 8 | Hodges and Son Construction Company, Inc. | $1,485,796 | $1,744,495 | +17% | -17% | TxDOT |
| A00218763 | REFLECTORIZED PAVEMENT MARKINGS & MARKERS, IH0030 (VARIOUS LOCATIONS WITHIN to EAST DALLAS COUNTY MAINTENANCE SECTIONS) | Dallas District | 3 | Stripe-A-Zone, LLC | $1,391,334 | $1,413,372 | +2.0% | -12% | TxDOT |
| A00210419 | Preventive Maintenance, SH 171 (W Owens St to South of BB Fielder Rd) | Fort Worth District | 4 | O. Trevino Construction, LLC | $1,234,417 | $1,392,432 | +13% | -47% | TxDOT |
| A00193004 | Hazard Elimination & Safety, FM 365 (US 90 to LNVA CANAL) | Beaumont District | 3 | Cornerstone Paving and Construction, L.L.C. | $1,134,406 | $1,317,468 | +16% | -12% | TxDOT |
| A00214469 | Highway Improvement, SH 78 (Cameron Ave/Tenison Pkwy to Tenison Memorial Drive) | Dallas District | 5 | Palmer Hall Construction | $1,098,618 | $1,130,253 | +3.0% | +18% | TxDOT |
| A00198645 | Construct Pedestrian Infrastructure, Various (VARIOUS LOCATION to TYLER DISTRICT) | Tyler District | 14 | Garret Shields Infrastructure | $1,038,973 | $1,094,777 | +5.0% | -17% | TxDOT |
| A00206552 | Hazard Elimination & Safety, US 87 (5.24 MI NORTH OF SH 354 to 1.52 MI SOUTH OF SH 354) | Amarillo District | 2 | Vaca Underground Utilities Inc | $1,004,804 | $1,171,574 | +17% | -21% | TxDOT |
| A00210232 | Surfacing/Roadway Restoration, FM 529 (SH 99 to US 290) | Houston District | 3 | Batterson, LLP | $910,739 | $952,023 | +5.0% | +7.0% | TxDOT |
| A00210036 | Preventive Maintenance, Various (Various Locations in Travis County to .) | Austin District | 6 | TRP Infrastructure Services, LLC | $868,731 | $882,258 | +2.0% | +1.0% | TxDOT |
| A00219580 | BUNDLED BID, IH0635 (IH 30 to TI Blvd.) | Dallas District | 4 | Roy Jorgensen Associates, Inc. | $755,725 | $840,864 | +11% | -37% | TxDOT |
| A00218351 | Rehabilitate Existing Roadway, FM 699 (At Tributary of Eight Mile Creek to .) | Atlanta District | 10 | C & W Southern LLC | $492,768 | $548,178 | +11% | -27% | TxDOT |
| A00211470 | Hazard Elimination & Safety, Various (VARIOUS LOCATIONS to IN THE ABILENE DISTRICT) | Abilene District | 6 | Stripe Lines, Inc. | $440,762 | $467,745 | +6.0% | -47% | TxDOT |
| A00209977 | Install Traffic Signal, WILLIAM D. FITCH PKWY (At Pebble Creek Parkway to .) | Bryan District | 9 | Larry Young Paving, Inc. | $421,790 | $434,520 | +3.0% | +14% | TxDOT |
| A00196733 | Bicycle And Pedestrian Improvements, SH 18 (15TH ST to 12TH ST) | Odessa District | 2 | Icos Management, LLC | $414,186 | $573,799 | +39% | -12% | TxDOT |
| A00216828 | Bridge Maintenance, Various (Various Bridge Locations: Bastrop to Bastrop County) | Austin District | 13 | Taylor Bridge LLC | $327,386 | $343,231 | +5.0% | -37% | TxDOT |
| A00183881 | Install/Replace Signs, Various (DISTRICTWIDE (SIGNING) to .) | El Paso District | 6 | Centerline Technologies, LLC | $320,400 | $360,137 | +12% | -14% | TxDOT |
| A00212656 | Railroad Crossing Improvements, Various (District Wide to District Wide) | Childress District | 2 | Centerline Technologies, LLC | $320,106 | $441,613 | +38% | -4.0% | TxDOT |
| A00217917 | Surfacing/Roadway Restoration, IH 10 (FM 1489 to FM 359) | Houston District | 4 | Emery Sapp & Son'S Inc. | $299,552 | $307,556 | +3.0% | +1.0% | TxDOT |
| A00214620 | Hazard Elimination & Safety, FM 1167 (US 287, South to 0.133 Miles) | Childress District | 2 | Scott Tucker Construction Company, LLC | $112,207 | $115,090 | +3.0% | +57% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.