TxDOT contract A00218351 bid tabulation
Rehabilitate Existing Roadway, FM 699 (At Tributary of Eight Mile Creek to .). Let by Texas DOT on March 5, 2026, Panola, Atlanta District. 10 bids received; low bid $492,768 by C & W Southern LLC, -27% against the engineer's estimate of $672,434.
- Owner
- Texas DOT
- Letting
- 05 MAR 2026
- Pay items
- 40
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | C & W Southern LLC | $492,768 | Low | -27% |
| 2 | Icos Management, LLC | $548,178 | +11% | -18% |
| 3 | W. M. Miller Construction Company, Inc. | $632,424 | +28% | -6.0% |
| 4 | Skyline Bridge LLC | $710,481 | +44% | +6.0% |
| 5 | Garret Shields Infrastructure | $718,648 | +46% | +7.0% |
| 6 | H. V. Caver, Inc. | $740,407 | +50% | +10% |
| 7 | Hodges and Son Construction Company, Inc. | $796,466 | +62% | +18% |
| 8 | East Texas Bridge, Inc. | $798,778 | +62% | +19% |
| 9 | THK Construction LLC | $867,807 | +76% | +29% |
| 10 | RB Contracting, LLC | $905,465 | +84% | +35% |
Engineer's estimate: $672,434.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. C & W Southern LLC | 2. Icos Management, LLC | 3. W. M. Miller Construction Company, Inc. | 4. Skyline Bridge LLC | 5. Garret Shields Infrastructure | 6. H. V. Caver, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 227 | $20.00 | $20.00 | $27.00 | $43.00 | $64.34 | $40.00 | $45.00 |
| 2 | Backfill (type B) (134-7002) | STA | 13.40 | $150.00 | $800.00 | $321.00 | $680.00 | $854.00 | $200.00 | $225.00 |
| 3 | Blading (150-7001) | STA | 13.40 | $250.00 | $200.00 | $214.00 | $263.00 | $650.00 | $100.00 | $250.00 |
| 4 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 2,085 | $0.55 | $0.59 | $1.00 | $1.20 | $0.66 | $0.80 | $1.00 |
| 5 | Vegetative watering (168-7001) | TGL | 33.40 | $5.00 | $5.00 | $1.00 | $0.01 | $1.00 | $50.00 | $0.01 |
| 6 | Cut & restore asphalt paving (400-7008) | SY | 254 | $150.00 | $100.00 | $150.00 | $100.00 | $112.86 | $150.00 | $174.17 |
| 7 | Cem stabil BKFL (400-7010) | CY | 299 | $250.00 | $250.00 | $203.00 | $245.00 | $268.58 | $250.00 | $225.00 |
| 8 | Flowable backfill (401-7001) | CY | 38 | $275.00 | $250.00 | $278.00 | $358.00 | $336.41 | $275.00 | $277.66 |
| 9 | Trench excavation protection (402-7001) | LF | 40 | $16.00 | $50.00 | $107.00 | $45.00 | $30.30 | $1.00 | $50.00 |
| 10 | Temporary special shoring (403-7001) | SF | 2,400 | $1.00 | $2.00 | $1.50 | $19.10 | $40.00 | $13.00 | |
| 11 | Class A concrete (seal) (420-7001) | CY | 30 | $975.00 | $500.00 | $535.00 | $437.00 | $540.96 | $1,000.00 | $423.80 |
| 12 | Riprap (mow strip)(4 in) (432-7013) | CY | 75 | $800.00 | $250.00 | $642.00 | $450.00 | $589.35 | $600.00 | $480.05 |
| 13 | Riprap (stone protection)(18 in) (432-7043) | CY | 111 | $300.00 | $175.00 | $214.00 | $308.00 | $147.45 | $200.00 | $200.00 |
| 14 | Bedding material (6 in) (432-7050) | CY | 38 | $200.00 | $180.00 | $193.00 | $233.00 | $200.00 | $50.00 | $215.00 |
| 15 | Concrete box culvert (8 FT X 8 FT) (462-7025) | LF | 80 | $905.00 | $856.00 | $772.00 | $1,044.25 | $1,000.00 | $738.43 | |
| 16 | RC pipe (CL III)(48 in) (464-7011) | LF | 102 | $175.00 | $275.00 | $300.00 | $268.00 | $215.00 | $300.00 | $242.46 |
| 17 | Headwall (CH - FW - 0) (diameter= 48 in) (466-7011) | EACH | 2 | $10,000 | $7,500.00 | $16,050 | $20,252 | $12,300 | $15,000 | $19,916 |
| 18 | Wingwall (PW - 1) (HW=10 FT) (466-7180) | EACH | 2 | $15,000 | $16,050 | $17,000 | $43,725 | $20,000 | $83,448 | |
| 19 | Removing structure (set) (496-7004) | EACH | 6 | $400.00 | $250.00 | $2,140.00 | $360.00 | $500.00 | $100.00 | $750.00 |
| 20 | Removing structure (headwall) (496-7006) | EACH | 2 | $1,000.00 | $2,140.00 | $3,900.00 | $2,500.00 | $1,000.00 | $2,000.00 | |
| 21 | Removing structure (pipe) (496-7007) | LF | 102 | $15.00 | $50.00 | $22.00 | $40.00 | $33.10 | $20.00 | $50.00 |
| 22 | Removing structure (box culvert) (496-7008) | LF | 120 | $35.00 | $43.00 | $80.00 | $90.00 | $100.00 | $100.00 | |
| 23 | Mobilization (500-7001) | LS | 1 | $45,000 | $45,000 | $38,000 | $50,000 | $50,000 | $50,000 | |
| 24 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $7,500.00 | $2,250.00 | $1.00 | $6,900.00 | $5,700.00 | $5,000.00 | $5,945.00 |
| 25 | Portable changeable message sign (503-7001) | DAY | 122 | $180.00 | $66.00 | $1.00 | $295.00 | $60.24 | $100.00 | $100.00 |
| 26 | TMA (stationary) (505-7001) | DAY | 25 | $300.00 | $350.00 | $107.00 | $250.00 | $301.20 | $300.00 | $200.00 |
| 27 | Rock filter dams (install) (type 2) (506-7002) | LF | 120 | $44.50 | $35.00 | $11.00 | $78.00 | $50.00 | $20.00 | $40.00 |
| 28 | Rock filter dams (remove) (506-7011) | LF | 120 | $13.50 | $10.00 | $5.50 | $12.00 | $10.00 | $5.00 | $19.00 |
| 29 | Temporary sediment control fence (install) (506-7039) | LF | 2,680 | $4.00 | $1.25 | $2.00 | $3.85 | $3.50 | $5.00 | $3.60 |
| 30 | Temporary sediment control fence (remove) (506-7041) | LF | 2,680 | $0.60 | $0.50 | $1.00 | $1.00 | $1.25 | $1.00 | $0.65 |
| 31 | Turnouts (ACP) (530-7018) | SY | 24 | $210.00 | $214.00 | $360.00 | $150.00 | $150.00 | $200.00 | |
| 32 | Metal W-beam guard fence (timber post) (540-7001) | LF | 925 | $20.00 | $20.75 | $26.00 | $25.50 | $25.30 | $30.00 | $21.00 |
| 33 | Metal beam guard fence (long span system) (540-7027) | EACH | 4 | $1,500.00 | $1,050.00 | $1,498.00 | $1,320.00 | $1,450.00 | $1,000.00 | $1,075.00 |
| 34 | Guardrail end treatment (install) (544-7001) | EACH | 8 | $2,500.00 | $2,925.00 | $3,745.00 | $3,570.00 | $3,600.00 | $3,500.00 | $2,950.00 |
| 35 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 1 | $250.00 | $1,070.00 | $1,577.00 | $602.40 | $500.00 | $207.50 | |
| 36 | Install delineator assembly (D-SY)SZ 1(yflx)GF2(BI) (658-7022) | EACH | 16 | $35.00 | $25.00 | $107.00 | $66.00 | $54.22 | $30.00 | $42.00 |
| 37 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 8 | $45.00 | $15.00 | $107.00 | $174.00 | $100.00 | $100.00 | $99.95 |
| 38 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 250 | $10.00 | $10.00 | $6.00 | $14.50 | $13.00 | $22.00 | $10.50 |
| 39 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 500 | $8.00 | $10.00 | $6.00 | $10.80 | $13.00 | $14.00 | $10.50 |
| 40 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 12 | $11.00 | $10.00 | $11.00 | $164.00 | $15.00 | $10.00 | $10.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.