C & W Southern LLC: TxDOT bid record
C & W Southern LLC submitted 25 bids on Texas DOT contracts in the data, from 01 MAY 2025 to 03 NOV 2026, and was the low bidder on 8 of them (32%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $5,048,453
- Latest bid
- 03 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 7 | 3 | 43% |
| 2026 | 18 | 5 | 28% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Wichita Falls District | 4 | 2 | 50% |
| Tyler District | 4 | 1 | 25% |
| Paris District | 3 | 0 | 0% |
| Waco District | 3 | 1 | 33% |
| Dallas District | 2 | 1 | 50% |
| Lufkin District | 2 | 0 | 0% |
| Yoakum District | 2 | 0 | 0% |
| Corpus Christi District | 2 | 1 | 50% |
| Abilene District | 1 | 0 | 0% |
| Atlanta District | 1 | 1 | 100% |
| Bryan District | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 25 | 10 (40%) | $1,500.00 | $5,000.00 |
| Vegetative watering | 168-7001 | TGL | 15 | 10 (67%) | $10.00 | $37.73 |
| Rock filter dams (remove) | 506-7011 | LF | 12 | 10 (83%) | $1.00 | $12.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 19 | 8 (42%) | $1.00 | $1.00 |
| Removing structure (bridge 0 - 99 FT length) | 496-7009 | EACH | 11 | 8 (73%) | $10,000 | $26,200 |
| Metal W-beam guard fence (timber post) | 540-7001 | LF | 9 | 6 (67%) | $24.50 | $27.00 |
| Preparing row | 100-7002 | STA | 16 | 5 (31%) | $1,425.00 | $2,750.00 |
| Excavation (channel) | 110-7002 | CY | 13 | 5 (38%) | $15.00 | $27.00 |
| Riprap (stone protection)(18 in) | 432-7043 | CY | 11 | 5 (45%) | $175.00 | $200.00 |
| Guardrail end treatment (install) | 544-7001 | EACH | 14 | 4 (29%) | $3,150.00 | $3,245.00 |
| Excavation (roadway) | 110-7001 | CY | 12 | 4 (33%) | $15.00 | $20.00 |
| Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) | 658-7019 | EACH | 10 | 4 (40%) | $32.50 | $35.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Garret Shields Infrastructure | 14 | 6 of 14 |
| Hodges and Son Construction Company, Inc. | 12 | 4 of 12 |
| STX Civil | 10 | 3 of 10 |
| THK Construction LLC | 9 | 2 of 9 |
| Skyline Bridge LLC | 9 | 3 of 9 |
| Icos Management, LLC | 8 | 1 of 8 |
| Tucan Contracting, LLC | 6 | 2 of 6 |
| Highway 19 Construction LLC | 6 | 2 of 6 |
| Blacksmith Ventures LLC | 6 | 3 of 6 |
| E-Z Bel Construction, LLC | 6 | 1 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 NOV 2026 | A00204003 | Bryan District | Bridge Replacement, COUNTY ROAD 244 (ON CR 244 (FCR 344) to AT DEEP CREEK) | 1 of 15 | $721,844 | Low, 1.0% under the second |
| 15 OCT 2026 | A00223685 | Paris District | BRIDGE PREVENTATIVE MAINTENANCE, IH0030 (Various locations in to Hopkins County) | 7 of 11 | $307,350 | +22% |
| 13 OCT 2026 | A00223040 | Tyler District | CULVERT REPAIR, SH0294 (Various locations in to the Tyler District) | 5 of 7 | $648,410 | +28% |
| 20 AUG 2026 | A00223274 | Lufkin District | BRIDGE PREVENTATIVE MAINTENANCE, FM0227 (Various Locations to Various Locations) | 4 of 10 | $736,320 | +26% |
| 01 JUL 2026 | A00196687 | Dallas District | Construct Pedestrian Infrastructure, FM 3039 (South of Hunter Lane to South of West Lewis) | 1 of 9 | $598,150 | Low, 7.0% under the second |
| 10 JUN 2026 | A00220544 | Lufkin District | BRIDGE PREVENTATIVE MAINTENANCE, US0059 (Various Locations to Various Locations) | 2 of 7 | $517,705 | +11% |
| 03 JUN 2026 | A00190949 | Corpus Christi District | Bridge Replacement, LAZY F (0.1 Mi S of FM 883 to FM 883) | 5 of 10 | $1,016,647 | +23% |
| 02 JUN 2026 | A00190177 | Corpus Christi District | Bridge Replacement, COUNTY ROAD 230 (AA02-30 Draw to 0.5 MI SE of CR 237) | 1 of 10 | $817,325 | Low, 5.0% under the second |
| 07 MAY 2026 | A00203223 | Waco District | Removal And/Or Replacement And/Or Disposal, OLD ROBINSON DR (Old Robinson Rd @ Drain to Old Robinson Rd @ Drain) | 1 of 6 | $578,158 | Low, 0.0% under the second |
| 06 MAY 2026 | A00135827 | Paris District | Bridge Replacement, CRAFT RD (Craft Rd to At Choctaw Creek Tributary) | 2 of 10 | $858,061 | +7.0% |
| 08 APR 2026 | A00131274 | Waco District | Bridge Replacement, COUNTY ROAD 104 (@ WILLIAMS CREEK to (MAP #2)) | 3 of 10 | $1,927,248 | +6.0% |
| 07 APR 2026 | A00186047 | Waco District | Bridge Replacement, COUNTY ROAD 325 (FCR 461 @ Hog Creek to (MAP #2064)) | 6 of 12 | $1,273,226 | +22% |
| 05 MAR 2026 | A00218351 | Atlanta District | Rehabilitate Existing Roadway, FM 699 (At Tributary of Eight Mile Creek to .) | 1 of 10 | $492,768 | Low, 11% under the second |
| 05 MAR 2026 | A00198645 | Tyler District | Construct Pedestrian Infrastructure, Various (VARIOUS LOCATION to TYLER DISTRICT) | 5 of 14 | $1,168,572 | +12% |
| 11 FEB 2026 | A00216038 | Wichita Falls District | CULVERT REPLACEMENT, FM0368 (FM 0368 to in Archer County) | 3 of 7 | $307,940 | +7.0% |
| 05 FEB 2026 | A00194041 | Dallas District | Bridge Replacement, NW CR 4340 (NW CR 4340 at Frost Branch to .) | 4 of 15 | $1,386,310 | +13% |
| 04 FEB 2026 | A00198028 | Paris District | Construct Pedestrian Infrastructure, BU 271B (E Price St to MLK Dr) | 2 of 13 | $753,594 | +4.0% |
| 06 JAN 2026 | A00206284 | Yoakum District | Bridge Replacement, COUNTY ROAD 281 (@ PONTON CREEK to STR# AA01-72-001) | 2 of 10 | $1,217,213 | +5.0% |
| 03 DEC 2025 | A00130819 | Yoakum District | Bridge Replacement, FM 806 (AT RATLIFF CREEK to STR#0716-03-012) | 7 of 12 | $1,845,044 | +15% |
| 28 OCT 2025 | A00214044 | Wichita Falls District | BRIDGE PREVENTATIVE MAINTENANCE, SH0114 (Various BPM maintenance to in the Graham office Area) | 1 of 12 | $491,415 | Low, 4.0% under the second |
| 21 OCT 2025 | A00216543 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, US0079 (Various bridges in Cherokee, Gregg, Rusk to ,Smith, and Wood Counties) | 4 of 6 | $297,020 | +53% |
| 09 OCT 2025 | A00194081 | Abilene District | Bridge Replacement, CR 314 (AT DRAW to .) | 3 of 8 | $944,491 | +3.0% |
| 08 OCT 2025 | A00207434 | Wichita Falls District | Bridge Replacement, S HANCOCK ST (Hancock St to at Dry Fork Little Wichita River) | 4 of 8 | $1,220,291 | +6.0% |
| 02 JUL 2025 | A00183414 | Wichita Falls District | Bridge Replacement, FM 923 (At Bush Knob Creek to .) | 1 of 8 | $728,607 | Low, 1.0% under the second |
| 01 MAY 2025 | A00184614 | Tyler District | Hazard Elimination & Safety, YOUNG (Mobberly Ave to MLK Blvd) | 1 of 13 | $620,186 | Low, 14% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.