TxDOT contract A00198645 bid tabulation

Construct Pedestrian Infrastructure, Various (VARIOUS LOCATION to TYLER DISTRICT). Let by Texas DOT on March 5, 2026, Smith, Tyler District. 14 bids received; low bid $1,038,973 by Garret Shields Infrastructure, -17% against the engineer's estimate of $1,256,856.

Owner
Texas DOT
Letting
05 MAR 2026
Pay items
48
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Garret Shields Infrastructure$1,038,973Low-17%
2THK Construction LLC$1,094,777+5.0%-13%
3Highway 19 Construction LLC$1,113,236+7.0%-11%
4STX Civil$1,143,995+10%-9.0%
5C & W Southern LLC$1,168,572+12%-7.0%
63LW Civil LLC$1,179,067+13%-6.0%
7Red Baron Building Company, LLC$1,223,662+18%-3.0%
8Tight Line Construction, LLC$1,256,771+21%0.0%
9Ti-Zack Concrete, LLC$1,270,736+22%+1.0%
10East Texas Bridge, Inc.$1,304,530+26%+4.0%
11Reynolds & Kay, LTD.$1,320,684+27%+5.0%
12O. Trevino Construction, LLC$1,468,545+41%+17%
13Icos Management, LLC$1,572,352+51%+25%
14Skyline Bridge LLC$1,791,319+72%+43%
TxDOT contract A00198645: bids by rank

Engineer's estimate: $1,256,856.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Garret Shields Infrastructure2. THK Construction LLC3. Highway 19 Construction LLC4. STX Civil5. C & W Southern LLC6. 3LW Civil LLC
1Preparing row (100-7002)STA1$2,000.00$1,000.00$5,000.00$5,000.00$5,000.00$10,000$1,500.00
2Removing concrete (driveways) (104-7011)SY2,239$25.00$20.00$15.00$25.00$20.00$20.00$30.00
3Removing concrete (curb or curb & gutter) (104-7018)LF4,756$20.00$10.00$8.00$10.00$8.00$13.00$17.00
4Flexible pavement structure repair(2") (351-7001)SY40$50.00$40.00$200.00$75.00$120.00$100.00$250.00
5Riprap (concrete)(6 in) (432-7003)CY53$500.00$500.00$900.00$700.00$700.00$350.00$648.30
6Mobilization (500-7001)LS1$86,875$100,000$110,000$120,000$94,400$90,000$35,000
7Barricades, signs and traffic handling (502-7001)MO7$7,000.00$3,000.00$1,471.50$5,000.00$5,000.00$1,500.00$4,930.21
8Portable changeable message sign (503-7001)DAY110$100.00$1.00$100.00$100.00$70.00$140.00$0.01
9TMA (stationary) (505-7001)DAY92$200.00$200.00$275.00$250.00$185.00$350.00$0.01
10TMA (mobile operation) (505-7003)DAY8$165.00$200.00$400.00$100.00$0.10$400.00$0.01
11Concrete curb & gutter (type II) (529-7009)LF4,756$55.00$20.00$35.00$34.00$38.00$50.00$47.51
12Driveways (concrete) (hes) (530-7007)SY2,239$100.00$100.00$95.00$119.00$115.00$90.00$129.44
13Concrete sidewalks (4") (531-7001)SY3,563$100.00$80.00$90.00$73.00$82.00$90.00$85.28
14Curb ramps (type 1) (531-7015)SY23$70.00$300.00$140.00$110.00$110.00$215.00$125.17
15Curb ramps (type 2) (531-7016)SY16$70.00$300.00$140.00$112.00$110.00$205.00$125.17
16Curb ramps (type 3) (531-7017)SY78$70.00$300.00$140.00$130.00$120.00$205.00$125.17
17Curb ramps (type 7) (531-7020)SY243$70.00$300.00$140.00$92.00$150.00$150.00$125.17
18Curb ramps (type 10) (531-7021)SY24$70.00$300.00$140.00$100.00$150.00$215.00$125.17
19Curb ramps (type 20) (531-7022)SY10$70.00$300.00$140.00$180.00$200.00$250.00$125.17
20Curb ramps (type 21) (531-7023)SY5$70.00$300.00$140.00$250.00$150.00$500.00$125.17
21Curb ramps (type 22) (531-7024)SY56$70.00$300.00$140.00$160.00$725.00$215.00$125.17
22Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH4$750.00$800.00$1,000.00$750.00$750.00$800.00$766.97
23Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH1$1,200.00$800.00$1,000.00$850.00$650.00$1,000.00$830.84
24Install small roadside sign support and assembly type 10BWG(1)SB(U) (644-7015)EACH1$1,200.00$800.00$1,000.00$850.00$800.00$1,000.00$1,187.64
25Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH2$1,200.00$1,200.00$1,000.00$980.00$1,100.00$900.00$1,322.53
26Install small roadside sign support and assembly TYS80(1)SB(U) (644-7042)EACH2$1,200.00$1,000.00$1,000.00$950.00$1,000.00$900.00$1,280.51
27Remove SM RD SN sup&AM (644-7073)EACH9$100.00$100.00$250.00$100.00$80.00$100.00$75.00
28Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF375$0.60$0.65$1.58$1.50$0.55$1.50$1.65
29Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF170$0.60$0.47$1.58$1.50$0.40$1.50$1.65
30Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF1,520$1.00$1.75$1.05$1.00$1.50$1.00$1.10
31Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF645$4.00$6.00$1.05$1.00$5.55$1.00$1.10
32Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF1,247$1.00$0.50$1.58$1.50$0.40$1.50$1.65
33Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF116$2.25$4.00$3.15$3.00$3.25$3.00$3.30
34Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,660$1.30$1.75$2.10$2.00$1.50$2.00$2.20
35Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF165$4.50$4.00$5.25$5.00$3.25$5.00$5.50
36Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF480$10.00$8.00$7.35$7.00$7.00$7.00$7.70
37Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF375$1.25$1.20$2.63$2.50$1.00$2.50$2.75
38Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF170$1.25$1.00$2.63$2.50$0.90$2.50$2.75
39Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF1,247$1.25$1.00$2.10$2.00$0.90$2.00$2.20
40Prefabricated PM type C (W)(arrow) (668-7091)EACH6$250.00$300.00$262.50$300.00$240.00$250.00$275.00
41Prefabricated PM type C (W)(word) (668-7103)EACH6$250.00$300.00$315.00$300.00$260.00$300.00$330.00
42Reflectorized pavement marker type I-C (672-7002)EACH19$6.50$6.00$10.50$10.00$5.00$10.00$11.00
43Reflectorized pavement marker type II-A-A (672-7004)EACH62$5.50$6.00$10.50$10.00$5.00$10.00$11.00
44Eliminating existing PM & markers (6") (677-7002)LF696$2.00$1.50$2.10$2.00$2.00$2.00$2.20
45Eliminating existing PM & markers (8") (677-7004)LF792$2.00$2.00$2.10$2.00$2.00$2.00$2.20
46Eliminating existing PM & markers (24") (677-7008)LF255$4.00$6.00$4.20$4.00$4.00$4.00$4.40
47Eliminating existing PM & markers (arrow) (677-7009)EACH3$100.00$42.00$157.50$150.00$150.00$150.00$165.00
48Eliminating existing PM & markers (word) (677-7015)EACH3$100.00$60.00$157.50$150.00$150.00$150.00$165.00
TxDOT contract A00198645: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy