Red Baron Building Company, LLC: TxDOT bid record
Red Baron Building Company, LLC submitted 20 bids on Texas DOT contracts in the data, from 06 MAY 2021 to 08 APR 2026, and was the low bidder on 6 of them (30%). When it was not low, its total sat a median +43% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $1,556,132
- Latest bid
- 08 APR 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 4 | 1 | 25% |
| 2022 | 2 | 1 | 50% |
| 2023 | 3 | 1 | 33% |
| 2024 | 3 | 0 | 0% |
| 2025 | 6 | 3 | 50% |
| 2026 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 15 | 9 (60%) | $200.00 | $230.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 13 | 6 (46%) | $1,500.00 | $5,000.00 |
| Flowable backfill | 401-7001 | CY | 6 | 4 (67%) | $275.00 | $350.00 |
| Vegetative watering | 168-7001 | MG | 5 | 4 (80%) | $10.00 | $29.97 |
| Portable changeable message sign | 503-7001 | DAY | 12 | 3 (25%) | $125.00 | $100.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 5 | 3 (60%) | $500.00 | $643.00 |
| Excavation (roadway) | 110-7001 | CY | 5 | 2 (40%) | $30.00 | $20.00 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 10 | 1 (10%) | $2.00 | $1.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 10 | 1 (10%) | $4.00 | $4.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Cross Plus Construction, LLC | 9 | 3 of 9 |
| Garret Shields Infrastructure | 6 | 5 of 6 |
| Highway 19 Construction LLC | 5 | 3 of 5 |
| Structural Integrity Group LLC | 5 | 0 of 5 |
| East Texas Bridge, Inc. | 4 | 2 of 4 |
| Crackseal of Texas, LLC | 4 | 2 of 4 |
| THK Construction LLC | 4 | 4 of 4 |
| True Roads Construction, LLC | 4 | 1 of 4 |
| Premier Contractors LLC | 4 | 2 of 4 |
| Icos Management, LLC | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 APR 2026 | A00212486 | Tyler District | Construct Bridge, SL 323 (0.12 mi S of US 271 to UPRR) | 9 of 9 | $2,341,953 | +54% |
| 05 MAR 2026 | A00198645 | Tyler District | Construct Pedestrian Infrastructure, Various (VARIOUS LOCATION to TYLER DISTRICT) | 7 of 14 | $1,223,662 | +18% |
| 09 DEC 2025 | A00218248 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various Bridges in to the Tyler District) | 3 of 8 | $627,999 | +43% |
| 12 NOV 2025 | A00216530 | Tyler District | BRIDGE RAIL REPAIR, US0080 (VARIOUS BRIDGES to IN THE TYLER DISTRICT) | 1 of 7 | $143,287 | Low, 12% under the second |
| 21 OCT 2025 | A00216543 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, US0079 (Various bridges in Cherokee, Gregg, Rusk to ,Smith, and Wood Counties) | 1 of 6 | $194,460 | Low, 42% under the second |
| 21 OCT 2025 | A00216166 | Tyler District | BRIDGE PREVENTATIVE MAINTENANCE, US0079 (Various bridges to in Anderson and Henderson Counties) | 4 of 7 | $374,964 | +16% |
| 12 AUG 2025 | A00216062 | Tyler District | BRIDGE JOINT CLEANING AND SEALING, SH0031 (Various Bridges in to the Tyler District) | 6 of 8 | $584,870 | +75% |
| 11 MAR 2025 | A00210436 | Tyler District | FULL DEPTH CONCRETE REPAIR, SH0019 (VARIOUS LOCATIONS to IN THE TYLER DISTRICT) | 1 of 4 | $167,715 | Low, 43% under the second |
| 07 NOV 2024 | A00200684 | Tyler District | Bridge Maintenance, Various (Various Locations to in the Tyler District) | 10 of 10 | $5,329,150 | +71% |
| 07 JUN 2024 | 06241001 | Tyler District | FM1798 Bridge preventative maintenance from VARIOUS LOCATIONS to IN THE TYLER DISTRICT | 3 of 4 | $183,400 | +28% |
| 05 JUN 2024 | 06243041 | Tyler District | US 79 Embankment stabilization from CR 333 to CR 344 | 5 of 5 | $1,246,384 | +73% |
| 02 JUN 2023 | 06234211 | Tyler District | FM2422 Culvert repair from VARIOUS ROADWAYS IN to THE TYLER DISTRICT | 2 of 9 | $378,497 | +1.0% |
| 14 MAR 2023 | 03231001 | Tyler District | US0069 Concrete structure repair from RUSK STATE HOSPITAL to PARKING LOT | 1 of 3 | $298,238 | Low, 20% under the second |
| 07 MAR 2023 | 03233036 | Tyler District | FM 1804 Bridge replacement from AT BLACK CREEK, .25 MI S OF US 80 to STR# 102500227401001 | 7 of 8 | $894,972 | +41% |
| 07 SEP 2022 | 09224031 | Tyler District | US0080 Concrete spall repair from VARIOUS LOCATIONS IN to THE TYLER DISTRICT | 1 of 5 | $320,000 | Low, 28% under the second |
| 09 AUG 2022 | 08221001 | Tyler District | FM1798 Crack seal from VARIOUS ROADWAYS IN to THE TYLER DISTRICT | 6 of 6 | $433,765 | +227% |
| 08 OCT 2021 | 10214225 | Tyler District | SH0334 Bridge joint cleaning and sealing from VARIOUS ROADWAYS to TYLER DISTRICT | 4 of 9 | $375,700 | +88% |
| 07 OCT 2021 | 10214024 | Tyler District | US0271 Bridge preventative maintenance from VARIOUS LOCATIONS IN GREGG to , RUSK, SMITH, AND CHEROKEE COUNTIE | 1 of 1 | $432,432 | Low |
| 05 AUG 2021 | 08214214 | Tyler District | US0069 Crack seal from VARIOUS ROADWAYS IN to THE TYLER DISTRICT | 4 of 4 | $1,158,860 | +156% |
| 06 MAY 2021 | 05213231 | Tyler District | SH 64 Bridge maintenance from PRAIRIE CREEK | 3 of 10 | $350,766 | +6.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.