TxDOT letting results, September 7, 2022
75 contracts let by Texas DOT on September 7, 2022, $299,304,146 in low bids, a median of 4 bidders per contract. On the 75 with an engineer's estimate, the low bid came in under it 35 times; median low bid +2.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 75
- Low bids, total
- $299,304,146
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 09223001 | SH 149 Widen existing 2-lane highway to 4-lane divided from 0.8 MI S. OF SH 315 to US 59 | Atlanta District | 3 | Longview Bridge and Road, LTD. | $29,546,263 | $29,582,266 | 0.0% | +2.0% | TxDOT |
| 09223041 | US 67 Widen road - add lanes from 0.45 MILES EAST OF US 385 to 0.20 MILES WEST OF SH 329 | Odessa District | 3 | Jones Bros. Dirt & Paving Contractors, Inc. | $26,727,485 | $28,888,421 | +8.0% | +24% | TxDOT |
| 09223024 | SH 207 Rehabiliation from 1109 FT NORTH OF FM 40 EAST to GARZA COUNTY LINE | Lubbock District | 4 | Duininck, Inc. | $23,557,971 | $25,176,323 | +7.0% | +25% | TxDOT |
| 09223003 | IH 10 Seal coat from EAST OF NECHES RIVER BRIDGE, EAST to FM 105 | Beaumont District | 2 | Clark Construction of Texas, Inc. | $15,248,084 | $16,610,131 | +9.0% | +15% | TxDOT |
| 09223021 | SH 114 Widen road - add lanes from NEAR EAST LIMITS OF OLNEY to 0.8 MI WEST OF FM 1769 | Wichita Falls District | 4 | Zack Burkett Co. | $10,612,895 | $11,593,316 | +9.0% | +6.0% | TxDOT |
| 09223036 | SH 111 Surfacing/roadway restoration from FM 3131 to SH 172 | Yoakum District | 3 | Hunter Industries, LTD. | $9,898,507 | $10,415,256 | +5.0% | -2.0% | TxDOT |
| 09223028 | US 96 Widen road - add shoulders from 1.06 MILES S OF SL 500 to 0.35 MILES S OF FM 417 | Lufkin District | 2 | Moore Brothers Construction Company | $9,395,982 | $10,144,362 | +8.0% | +10% | TxDOT |
| 09223040 | VA Construct pedestrian infrastructure from AT THE BRIDGE OF THE AMERICAS to ZARAGOZA PORT OF ENTRY | El Paso District | 1 | Tri State Electric, LTD. | $8,297,286 | +5.0% | TxDOT | ||
| 09223030 | FM 1377 Hazard elimination & safety from FM 545 to 0.269 MILES SOUTH OF CR 466 | Dallas District | 3 | A. K. Gillis & Sons, LLC | $8,279,604 | $10,099,202 | +22% | +2.0% | TxDOT |
| 09223006 | FM 218 Seal coat from MILLS CL to FM 2486 | Waco District | 2 | Cox Paving of Texas, Inc. | $8,071,175 | $9,472,896 | +17% | +3.0% | TxDOT |
| 09223002 | US 90 Seal coat from VAL VERDE/KINNEY COUNTY LINE to 2.055 MI WEST OF FM 693 | Laredo District | 4 | Ronald R. Wagner & Co., LP | $8,058,701 | $8,221,645 | +2.0% | -21% | TxDOT |
| 09223039 | FM 2790 Rehabilitate existing roadway from FISCHER RD. to IH 410 | San Antonio District | 8 | Capital Excavation Company | $7,692,727 | $7,997,716 | +4.0% | -6.0% | TxDOT |
| 09223007 | US 62 Overlay from COTTLE C/L, NORTH to FM 164 | Childress District | 5 | RK Hall, LLC | $7,466,260 | $7,474,513 | 0.0% | -5.0% | TxDOT |
| 09223025 | US 80 Rehabilitate existing roadway from WOOD C/L to 0.3 MI E OF SH 155N | Atlanta District | 3 | Madden Contracting Company, LLC. | $6,277,174 | $6,894,561 | +10% | -22% | TxDOT |
| 09223026 | US 283 Resurface roadway from RED RIVER to FM 924 | Wichita Falls District | 4 | Zack Burkett Co. | $6,216,762 | $6,808,812 | +10% | +5.0% | TxDOT |
| 09223032 | US 271 Rehabilitate existing roadway from FM 3417 to CAMP C/L | Atlanta District | 2 | RK Hall, LLC | $5,186,944 | $7,705,991 | +49% | -28% | TxDOT |
| 09223008 | FM 1829 Seal coat from SH 36 to US 84 | Waco District | 4 | Brannan Paving Co., LTD. | $5,068,817 | $5,554,439 | +10% | -3.0% | TxDOT |
| 09223009 | US 259 Resurface roadway from UPSHUR C/L, S to FM 1844 | Tyler District | 4 | Madden Contracting Company, LLC. | $5,038,500 | $5,087,153 | +1.0% | 0.0% | TxDOT |
| 09224033 | US0287 Mill and inlay from VARIOUS ROADWAYS IN HENDERSON, ANDE to SMITH, & CHEROKEE COUNTIES | Tyler District | 3 | Big Creek Construction, LTD. | $4,990,503 | $5,589,504 | +12% | +6.0% | TxDOT |
| 09223033 | FM 81 Rehabilitate existing roadway from 700 FT S OF FM 627 to FM 2773 | Corpus Christi District | 7 | Relmco, Inc. | $4,887,026 | $5,089,529 | +4.0% | -4.0% | TxDOT |
| 09223037 | IH 10 Preventive maintenance from FM 34 to 2 MI E OF FM 34 | El Paso District | 3 | Dan Williams Company | $4,777,419 | $6,416,948 | +34% | -10% | TxDOT |
| 09223017 | FM 939 Rehabilitate and widen roadway from FM 342 to SH 164 | Waco District | 4 | Knife River Corporation - South | $4,553,672 | $4,587,650 | +1.0% | +4.0% | TxDOT |
| 09223010 | US 259 Resurface roadway from SH 31 IN KILGORE, S to RUSK C/L | Tyler District | 5 | Madden Contracting Company, LLC. | $4,533,083 | $4,776,392 | +5.0% | -2.0% | TxDOT |
| 09224017 | SH0099 Bundled bid from LIBERTY CL TO CHAMBERS CL to SH 99 | Beaumont District | 3 | Roy Jorgensen Associates, Inc. | $4,274,496 | $5,475,818 | +28% | -3.0% | TxDOT |
| 09223038 | SH 16 Resurface roadway from DREW LANE to IH 10 | San Antonio District | 4 | Austin Bridge & Road Services, LP | $4,178,288 | $4,252,528 | +2.0% | -20% | TxDOT |
| 09223011 | FM 574 Bridge replacement from AT PECAN BAYOU | Brownwood District | 4 | Acme Bridge Company, Inc. | $3,930,712 | $4,194,759 | +7.0% | +2.0% | TxDOT |
| 09223027 | IH 20 Resurface roadway from CALLAHAN C/L (MLW) to CR 198 | Brownwood District | 1 | J. H. Strain & Sons, Inc. | $3,280,637 | +31% | TxDOT | ||
| 09223005 | CS Reconstruct existing roadway from NAVIGATION BLVD; AT JENSEN/RUNNELS | Houston District | 4 | MBN Enterprises LLC | $3,268,853 | $3,993,858 | +22% | -4.0% | TxDOT |
| 09224016 | IH0020 Roadside mowing and herbicide from VARIOUS LOCATIONS WITHIN to SOUTH TARRANT COUNTY | Fort Worth District | 2 | Jasco | $3,207,824 | $4,685,894 | +46% | +44% | TxDOT |
| 09223013 | FM 2170 Rehabilitate existing roadway from FM 2551 to FM 1378 | Dallas District | 3 | Foutsco Paving Company, LLC | $3,061,582 | $3,118,351 | +2.0% | +21% | TxDOT |
| 09223012 | BS 6-R Hazard elimination & safety from SH 6 N to SH 21 | Bryan District | 7 | D. I. J. Construction, Inc. | $2,897,018 | $3,168,299 | +9.0% | +13% | TxDOT |
| 09223029 | SH 276 Resurface roadway from FM 549 to FM 550 | Dallas District | 4 | Texas Materials Group, Inc. | $2,748,754 | $2,787,453 | +1.0% | +5.0% | TxDOT |
| 09223016 | FM 326 Roadway rehabilitation/reconstruction from 0.500 MILES NORTH OF US 69 to US 69 | Lufkin District | 3 | Moore Brothers Construction Company | $2,637,474 | $2,702,675 | +2.0% | +21% | TxDOT |
| 09224029 | SH0046 Flexible pavement structure repair from VARIOUS LOCATIONS IN COMAL, GUADALU to AND WILSON COUNTIES | San Antonio District | 5 | Texas Materials Group, Inc. | $2,637,043 | $2,810,077 | +7.0% | +28% | TxDOT |
| 09223015 | VA Surfacing/roadway restoration from WITHIN LAKE ARROWHEAD STATE PARK | Wichita Falls District | 5 | Duininck, Inc. | $2,547,007 | $2,623,718 | +3.0% | +41% | TxDOT |
| 09224014 | US0080 Crash cushion attenuator repair from VARIOUS ROADWAYS IN to NORTHEAST DALLAS COUNTY MAINTENANCE | Dallas District | 2 | Fireman Excavating, Inc. | $2,496,690 | $5,446,760 | +118% | -31% | TxDOT |
| 09224028 | US0090 Flexible pavement structure repair from VAVARIOUS LOCATIONS IN MEDINA, ATAS to FRIO AND MCMULLEN COUNTIES | San Antonio District | 7 | Clark Construction of Texas, Inc. | $2,351,122 | $2,380,970 | +1.0% | +16% | TxDOT |
| 09224032 | US0271 Mill and inlay from VARIOUS ROADWAYS to VARIOUS ROADWAYS | Tyler District | 3 | Texas Materials Group, Inc. | $2,166,524 | $2,296,754 | +6.0% | +29% | TxDOT |
| 09224036 | SH0021 Hot-mix cold-laid (material only) from VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT | Austin District | 4 | Lone Star Paving Company | $1,969,300 | $2,003,925 | +2.0% | +27% | TxDOT |
| 09224005 | US0281 Hot-mix cold-laid (material only) from VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT | Austin District | 5 | Malbec Materials LLC | $1,932,500 | $2,011,150 | +4.0% | +7.0% | TxDOT |
| 09224013 | US0080 Metal beam guard fence repair from VARIOUS ROADWAYS IN to NORTHEAST DALLAS COUNTY MAINTENANCE | Dallas District | 2 | Fireman Excavating, Inc. | $1,740,500 | $2,956,400 | +70% | -27% | TxDOT |
| 09224008 | IH0010 Mill and inlay from 0.5 MILES EAST OF SH 62 to UP RR OVERPASS (FRONTAGE ROAD) | Beaumont District | 1 | Texas Materials Group, Inc. | $1,690,917 | +17% | TxDOT | ||
| 09224026 | US0075 Aggregate from ALL COUNTIES IN THE to PARIS DISTRICT | Paris District | 2 | RK Hall, LLC | $1,614,951 | $2,560,400 | +59% | +6.0% | TxDOT |
| 09224006 | US0069 Mill and inlay from SPURLOCK to FM365 | Beaumont District | 2 | Cornerstone Paving and Construction, L.L.C. | $1,547,222 | $1,704,395 | +10% | -4.0% | TxDOT |
| 09224030 | IH0410 Flexible pavement structure repair from VARIOUS LOCATIONS IN to BEXAR COUNTY | San Antonio District | 5 | Texas Materials Group, Inc. | $1,289,459 | $1,471,409 | +14% | +18% | TxDOT |
| 09223034 | SL 1 Preventive maintenance from WILLIAMSON CREEK to CONVICT HILL TURNAROUND | Austin District | 3 | Hunter Industries, LTD. | $1,239,173 | $1,612,554 | +30% | -2.0% | TxDOT |
| 09223014 | FM 1464 Install/upgrade roadway lighting from WEST AIRPORT to SH 99 | Houston District | 6 | Highway Intelligent Traffic Solutions, Inc. | $1,186,119 | $1,304,971 | +10% | -36% | TxDOT |
| 09224001 | US0380 Mill and inlay from VARIOUS LOCATIONS to IN HASKELL COUNTY | Abilene District | 4 | Zack Burkett Co. | $1,170,303 | $1,249,964 | +7.0% | +23% | TxDOT |
| 09224010 | SL0012 Reflectorized pavement markings & markers from VARIOUS ROADWAYS IN THE DALLAS to COUNTY MAINTENANCE SECTIONS | Dallas District | 4 | Total Highway Maintenance, LLC | $1,140,220 | $1,581,382 | +39% | -7.0% | TxDOT |
| 09224012 | IH0035E Bridge repair from IH 35E SB to AT SH 183 WB | Dallas District | 5 | Gibson & Associates, Inc. | $1,038,346 | $1,045,543 | +1.0% | +31% | TxDOT |
| 09224025 | BU0069J Limestone rock asphalt from ANG HOU & TRIN COUNTIES MAINT. YARD to ANG HOU & TRIN COUNTIES MAINT. YARD | Lufkin District | 1 | Vulcan Construction Materials, LLC | $1,034,640 | +21% | TxDOT | ||
| 09224007 | SH0105 Full depth concrete repair from VARIOUS LOCATIONS IN to JEFFERSON , HARDIN, AND ORANGE COUN | Beaumont District | 5 | O. Trevino Construction, LLC | $898,275 | $1,005,675 | +12% | -28% | TxDOT |
| 09223018 | IH 69 Landscape development from 0.094 WEST OF READING RD to GREATWOOD PARKWAY | Houston District | 2 | Yellowstone Landscape - Central, Inc. | $800,573 | $1,146,747 | +43% | -17% | TxDOT |
| 09224027 | IH0002 Expressway mowing and litter removal from HIDALGO COUNTY to VARIOUS ROADS | Pharr District | 1 | R&M Incorporated | $680,761 | +19% | TxDOT | ||
| 09224019 | IH0045 Storm sewer system cleaning from VARIOUS HIGHWAYS IN MONTGOMERY COUN to VARIOUS HIGHWAYS IN MONTGOMERY COUN | Houston District | 2 | Shalom Services Corporation | $675,000 | $731,350 | +8.0% | +16% | TxDOT |
| 09223023 | VA Construct pedestrian infrastructure from VARIOUS LOCATION IN CITY OF WHARTON | Yoakum District | 4 | Encino Landscape, Inc. | $664,042 | $744,937 | +12% | +2.0% | TxDOT |
| 09223022 | FM 528 Rehabilitate bridge from AT IRRIGATION CANAL | Houston District | 6 | MB Western Industrial Contracting Co. | $614,814 | $635,837 | +3.0% | +4.0% | TxDOT |
| 09224035 | US0287 Crack seal from CRACK SEALING VARIOUS LOCATIONS to THROUGHOUT THE WFS DISTRICT | Wichita Falls District | 6 | Scout 5 Construction LLC | $500,627 | $599,593 | +20% | -45% | TxDOT |
| 09224018 | US0059 Reflective pavement markings (graphics) from VARIOUS HIGHWAYS IN FORT BEND COUNT to VARIOUS HIGHWAYS IN FORT BEND COUNT | Houston District | 7 | Republic Traffic Safety, Inc. | $497,706 | $541,963 | +9.0% | -19% | TxDOT |
| 09224015 | IH0010 Districtwide crack seal from VARIOUS LOCATIONS to VARIOUS LOCATIONS | El Paso District | 4 | Crackseal of Texas, LLC | $474,800 | $495,042 | +4.0% | -7.0% | TxDOT |
| 09223019 | US 181 Install median barrier from ON US181 FROM 1.188 MI N OF FM3355 to 1.085 S OF FM 3355 | Corpus Christi District | 6 | Massana Construction Inc. | $460,101 | $598,214 | +30% | -42% | TxDOT |
| 09223035 | VA Preventive maintenance from FY 2024 STRIPING REFRESH IN TRAVIS to FY 2024 STRIPING REFRESH IN TRAVIS | Austin District | 3 | D. I. J. Construction, Inc. | $453,755 | $602,626 | +33% | -28% | TxDOT |
| 09223020 | VA Preventive maintenance from FY 2024 STRIPING REFRESH IN TRAVIS to FY 2024 STRIPING REFRESH IN TRAVIS | Austin District | 3 | D. I. J. Construction, Inc. | $442,395 | $557,117 | +26% | -25% | TxDOT |
| 09224009 | IH0020 Full depth concrete repair from VARIOUS ROADWAYS IN KAUFMAN/ROCKWAL to MAINTENANCE SECTION | Dallas District | 5 | O. Trevino Construction, LLC | $416,550 | $494,500 | +19% | +21% | TxDOT |
| 09223031 | US 90 Install/replace signs from 0.1 MI N OF KINGSWAY to 0.1 MI S OF KINGSWAY | Laredo District | 2 | Triple H Field Services, LLC | $409,635 | $548,422 | +34% | +12% | TxDOT |
| 09224003 | SH0207 Mowing highway right of way from VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS | Amarillo District | 1 | Texas Blacktops LLC | $380,832 | +22% | TxDOT | ||
| 09224004 | US0059 Crack seal from VARIOUS ROADWAYS to VARIOUS ROADWAYS | Atlanta District | 8 | D & M Contractors, LLC | $329,424 | $395,808 | +20% | -31% | TxDOT |
| 09224031 | US0080 Concrete spall repair from VARIOUS LOCATIONS IN to THE TYLER DISTRICT | Tyler District | 5 | Red Baron Building Company, LLC | $320,000 | $408,500 | +28% | -16% | TxDOT |
| 09224034 | FM0367 Tree trimming and brush removal from TREE TRIMMING VARIOUS LOCATIONS IN to WICHITA-WILBARGER-CLAY COUNTIES | Wichita Falls District | 4 | Fowler Construction | $313,559 | $407,965 | +30% | -22% | TxDOT |
| 09224011 | IH0030 Tree trimming and brush removal from VARIOUS ROADWAYS IN THE WEST to DALLAS COUNTY MAINTENANCE SECTIONS | Dallas District | 3 | Shalom Services Corporation | $277,735 | $462,790 | +67% | -13% | TxDOT |
| 09224022 | US0070 Crack seal from VARIOUS LOCATIONS to VARIOUS LOCATIONS | Lubbock District | 4 | Greenpak Solutions, Limited Liability Company | $274,153 | $357,804 | +31% | -30% | TxDOT |
| 09224023 | IH0027 Crack seal from VARIOUS LOCATIONS to VARIOUS LOCATIONS | Lubbock District | 5 | Crackseal of Texas, LLC | $254,745 | $264,656 | +4.0% | -8.0% | TxDOT |
| 09224024 | US0059 Bridge preventative maintenance from WITHIN THE LUFKIN DISTRICT to VARIOUS LOCATIONS | Lufkin District | 9 | Garret Shields Infrastructure | $238,790 | $240,360 | +1.0% | -10% | TxDOT |
| 09224002 | IH0040 Mowing highway right of way from VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS | Amarillo District | 2 | All Hands & Duke, Inc. | $167,233 | $168,635 | +1.0% | +20% | TxDOT |
| 09224021 | US0084 Crack seal from VARIOUS LOCATIONS to VARIOUS LOCATIONS | Maintenance Division District | 5 | Greenpak Solutions, Limited Liability Company | $98,124 | $131,436 | +34% | -41% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.