Jasco: TxDOT bid record
Jasco submitted 80 bids on Texas DOT contracts in the data, from 04 SEP 2020 to 17 NOV 2026, and was the low bidder on 17 of them (21%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $11,842,880
- Latest bid
- 17 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 3 | 100% |
| 2021 | 10 | 2 | 20% |
| 2022 | 2 | 1 | 50% |
| 2023 | 1 | 0 | 0% |
| 2024 | 3 | 2 | 67% |
| 2025 | 21 | 2 | 10% |
| 2026 | 40 | 7 | 18% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Fort Worth District | 15 | 3 | 20% |
| Austin District | 11 | 0 | 0% |
| Dallas District | 10 | 4 | 40% |
| Tyler District | 8 | 2 | 25% |
| Waco District | 7 | 4 | 57% |
| Brownwood District | 5 | 0 | 0% |
| Wichita Falls District | 5 | 0 | 0% |
| Houston District | 3 | 1 | 33% |
| San Antonio District | 3 | 0 | 0% |
| Bryan District | 2 | 0 | 0% |
| San Angelo District | 1 | 0 | 0% |
| Laredo District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Litter removal | 734-7001 | ACRE | 23 | 14 (61%) | $17.00 | $20.00 |
| Full - width mowing | 730-7022 | ACRE | 27 | 8 (30%) | $50.00 | $45.00 |
| Drilled shaft (roadway illumination pole) (30 in) | 416-7040 | LF | 12 | 7 (58%) | $202.50 | $280.00 |
| Spot mowing | 730-7021 | ACRE | 17 | 5 (29%) | $50.00 | $35.00 |
| Electrical conductor (no.6) bare | 620-7009 | LF | 14 | 5 (36%) | $2.17 | $2.10 |
| Barricades, signs and traffic handling | 502-7001 | MO | 10 | 5 (50%) | $2,500.00 | $5,000.00 |
| Full-width mowing (urban) | 730-7017 | ACRE | 8 | 5 (63%) | $50.00 | $55.00 |
| Electrical conductor (no.6) insulated | 620-7010 | LF | 11 | 4 (36%) | $2.45 | $2.50 |
| Mobilization (callout) | 500-7002 | EACH | 9 | 4 (44%) | $1,000.00 | $688.00 |
| Broadcast application | 731-7002 | MI | 6 | 4 (67%) | $900.00 | $955.00 |
| Eliminating existing PM & markers (arrow) | 677-7009 | EACH | 5 | 4 (80%) | $80.24 | $75.00 |
| TMA (stationary) | 505-7001 | DAY | 17 | 3 (18%) | $150.00 | $230.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Abescape Group LLC | 19 | 8 of 19 |
| T&L Cleaning Services LLC | 19 | 12 of 19 |
| Vaca Underground Utilities Inc | 18 | 11 of 18 |
| Cross Plus Construction, LLC | 15 | 7 of 15 |
| Central North Construction, LLC | 13 | 6 of 13 |
| Anthony Services | 13 | 3 of 13 |
| Marcom'S Mowing Service, LLC | 11 | 5 of 11 |
| Highway Intelligent Traffic Solutions, Inc. | 11 | 5 of 11 |
| Florida Traffic Control Devices, Inc. | 11 | 2 of 11 |
| Ortega'S Lawn and Landscaping, LLC | 11 | 5 of 11 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 NOV 2026 | A00223372 | Waco District | MOWING HIGHWAY RIGHT OF WAY, SH0022 (VARIOUS ROADWAYS to ACROSS BOSQUE COUNTY) | 1 of 7 | $261,287 | Low, 9.0% under the second |
| 17 NOV 2026 | A00223374 | Waco District | MOWING HIGHWAY RIGHT OF WAY, US0084 (VARIOUS ROADWAYS to ACROSS CORYELL COUNTY) | 1 of 8 | $254,153 | Low, 5.0% under the second |
| 17 NOV 2026 | A00224263 | Bryan District | MOWING HIGHWAY RIGHT OF WAY, SH0006 (Various to Various) | 7 of 9 | $713,390 | +50% |
| 03 NOV 2026 | A00215476 | Austin District | SMALL SIGN REPLACEMENT, SH0045 (VARIOUS LOCATIONS IN WILLIAMSON to AND TRAVIS COUNTIES) | 3 of 7 | $1,087,420 | +13% |
| 15 SEP 2026 | A00223755 | Brownwood District | MOWING HIGHWAY RIGHT OF WAY, US0067 (COMANCHE COUNTY to COMANCHE COUNTY) | 6 of 7 | $582,816 | +33% |
| 09 SEP 2026 | A00219945 | Austin District | ILLUMINATION MAINTENANCE, SH0045 (VARIOUS LOCATIONS IN to TRAVIS AND WILLIAMSON COUNTIES) | 3 of 4 | $1,196,923 | +79% |
| 09 SEP 2026 | A00220213 | Austin District | ILLUMINATION MAINTENANCE, SH0130 (VARIOUS LOCATIONS IN to WILLIAMSON AND TRAVIS COUNTIES) | 3 of 5 | $1,211,711 | +83% |
| 06 AUG 2026 | A00219268 | Tyler District | Install Illumination, Various (Install Roadway Illumination to in the Tyler District) | 3 of 10 | $710,153 | +8.0% |
| 06 AUG 2026 | A00193593 | Houston District | Hazard Elimination & Safety, FM 3005 (Kiva Road to South of 89th Street) | 1 of 14 | $2,099,052 | Low, 23% under the second |
| 05 AUG 2026 | A00213321 | Fort Worth District | Install Illumination, US 281 (FM 3027 to FM 3027) | 3 of 10 | $196,175 | +8.0% |
| 05 AUG 2026 | A00213379 | Laredo District | Install Illumination, SH 44 (JULIAN ST to CR 338) | 5 of 7 | $858,260 | +10% |
| 05 AUG 2026 | A00193595 | Houston District | Hazard Elimination & Safety, SH 6 (Memorial Drive to Westpark Drive) | 8 of 13 | $1,998,432 | +9.0% |
| 05 AUG 2026 | A00218301 | San Antonio District | Install Illumination, Various (Various Locations in San Antonio to .) | 7 of 12 | $994,413 | +31% |
| 02 JUL 2026 | A00193582 | Houston District | Hazard Elimination & Safety, FM 517 (FM 646 to SH 3) | 8 of 10 | $2,581,272 | +19% |
| 02 JUL 2026 | A00188160 | Corpus Christi District | Install/Replace Signs, Various (AT VARIOUS LOCATION IN CC DISTRICT to .) | 2 of 3 | $629,643 | +23% |
| 02 JUL 2026 | A00187816 | Odessa District | Traffic Signal Improvements, Various (US 385 and FM 1882 to .) | 1 of 3 | $688,361 | Low, 15% under the second |
| 01 JUL 2026 | A00210034 | Austin District | Signal Improvements,Leds & Gps Clocks, Various (Various locations Districwide to .) | 5 of 5 | $2,771,448 | +35% |
| 01 JUL 2026 | A00184345 | Lubbock District | Traffic Signal Improvements, 13TH ST (Intersection of 13th St to And Slide Road) | 3 of 3 | $369,038 | +12% |
| 01 JUL 2026 | A00193476 | San Antonio District | Hazard Elimination & Safety, JACKSON KELLER RD (In San Antonio on Jackson Keller Rd to At West Ave) | 7 of 7 | $1,671,560 | +33% |
| 01 JUL 2026 | A00215421 | Yoakum District | Traffic Surveillance, Various (Various Intersection Locations to Along US 77, BU77S, and US 87) | 3 of 6 | $995,513 | +22% |
| 03 JUN 2026 | A00206486 | Pharr District | Hazard Elimination & Safety, FM 2220 (6 Mile Rd. to Harvard Ave.) | 4 of 7 | $975,357 | +16% |
| 03 JUN 2026 | A00197323 | Austin District | Install/Replace Signs, Various (Various location in Travis County to .) | 5 of 8 | $277,300 | +32% |
| 03 JUN 2026 | A00213348 | Tyler District | Install Illumination, Various (VARIOUS LOCATIONS IN to TYLER DISTRICT) | 8 of 11 | $669,417 | +18% |
| 03 JUN 2026 | A00211067 | Wichita Falls District | Hazard Elimination & Safety, Various (Various locations to Cooke County) | 5 of 12 | $1,184,738 | +40% |
| 07 MAY 2026 | A00200263 | Beaumont District | Hazard Elimination & Safety, FM 565 (AT SH 99 to .) | 1 of 8 | $310,773 | Low, 15% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.