TxDOT contract A00219268 bid tabulation
Install Illumination, Various (Install Roadway Illumination to in the Tyler District). Let by Texas DOT on August 6, 2026, Smith, Tyler District. 10 bids received; low bid $655,280 by Striping Technology, L.P., -29% against the engineer's estimate of $926,787.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 15
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Striping Technology, L.P. | $655,280 | Low | -29% |
| 2 | North Texas Traffic Systems Construction | $703,832 | +7.0% | -24% |
| 3 | Jasco | $710,153 | +8.0% | -23% |
| 4 | Albatross Construction LLC | $743,256 | +13% | -20% |
| 5 | Highway Intelligent Traffic Solutions, Inc. | $778,194 | +19% | -16% |
| 6 | Texas Traffic Control Systems, Inc. | $796,563 | +22% | -14% |
| 7 | 3LW Civil LLC | $799,586 | +22% | -14% |
| 8 | Florida Traffic Control Devices, Inc. | $927,150 | +41% | 0.0% |
| 9 | Structural Integrity Group LLC | $947,435 | +45% | +2.0% |
| 10 | Creacom, Inc. | $988,580 | +51% | +7.0% |
Engineer's estimate: $926,787.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Striping Technology, L.P. | 2. North Texas Traffic Systems Construction | 3. Jasco | 4. Albatross Construction LLC | 5. Highway Intelligent Traffic Solutions, Inc. | 6. Texas Traffic Control Systems, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 1 | $2,000.00 | $18,870 | $7,000.00 | $8,500.00 | $3,450.00 | $2,950.00 | $2,000.00 |
| 2 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 500 | $315.00 | $248.00 | $200.00 | $138.00 | $291.99 | $199.33 | $300.00 |
| 3 | Mobilization (500-7001) | LS | 1 | $80,000 | $14,250 | $55,000 | $90,000 | $56,718 | $74,462 | $55,000 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $4,000.00 | $4,100.00 | $1,800.00 | $1.00 | $5,885.70 | $10,886 | $5,000.00 |
| 5 | TMA (stationary) (505-7001) | DAY | 60 | $200.00 | $300.00 | $140.00 | $1.00 | $200.00 | $200.86 | $200.00 |
| 6 | TMA (mobile operation) (505-7003) | DAY | 20 | $200.00 | $300.00 | $50.00 | $1.00 | $200.00 | $515.81 | $200.00 |
| 7 | In RD IL (type SA) 40T-12 (250W EQ) LED (610-7128) | EACH | 21 | $5,000.00 | $3,400.00 | $4,300.00 | $6,200.00 | $4,471.20 | $4,515.00 | $4,900.00 |
| 8 | In RD IL (type SA) 50T-12 (400W EQ) LED (610-7200) | EACH | 25 | $6,500.00 | $3,750.00 | $5,200.00 | $6,600.00 | $5,471.70 | $5,571.10 | $5,500.00 |
| 9 | In RD IL (type SA) 50T-12-12(400W EQ)LED (610-7201) | EACH | 4 | $7,500.00 | $5,725.00 | $5,800.00 | $7,250.00 | $6,495.20 | $6,874.74 | $6,850.00 |
| 10 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 5,805 | $12.00 | $7.75 | $10.00 | $4.50 | $9.46 | $10.08 | $8.00 |
| 11 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 4,416 | $30.00 | $19.00 | $18.00 | $16.00 | $12.24 | $13.36 | $20.00 |
| 12 | Electrical conductor (no.8) bare (620-7007) | LF | 10,221 | $2.00 | $2.00 | $2.20 | $1.25 | $1.32 | $1.76 | $2.50 |
| 13 | Electrical conductor (no.8) insulated (620-7008) | LF | 20,442 | $2.50 | $2.25 | $2.45 | $1.50 | $1.61 | $2.08 | $2.50 |
| 14 | Ground box type A (122311)W/apron (624-7002) | EACH | 27 | $1,300.00 | $1,103.00 | $1,075.00 | $1,450.00 | $908.50 | $1,307.94 | $1,235.00 |
| 15 | Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009) | EACH | 6 | $7,500.00 | $6,750.00 | $6,800.00 | $6,500.00 | $9,182.75 | $8,232.49 | $6,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.