T&L Cleaning Services LLC: TxDOT bid record
T&L Cleaning Services LLC submitted 99 bids on Texas DOT contracts in the data, from 07 FEB 2020 to 17 NOV 2026, and was the low bidder on 26 of them (26%). When it was not low, its total sat a median +32% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $14,705,105
- Latest bid
- 17 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 1 | 20% |
| 2024 | 3 | 1 | 33% |
| 2025 | 54 | 15 | 28% |
| 2026 | 37 | 9 | 24% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Waco District | 15 | 8 | 53% |
| Fort Worth District | 15 | 6 | 40% |
| San Angelo District | 11 | 2 | 18% |
| Austin District | 10 | 2 | 20% |
| Abilene District | 8 | 1 | 13% |
| Bryan District | 7 | 2 | 29% |
| Brownwood District | 6 | 2 | 33% |
| Beaumont District | 5 | 2 | 40% |
| Yoakum District | 4 | 0 | 0% |
| Dallas District | 4 | 0 | 0% |
| Amarillo District | 4 | 0 | 0% |
| Pharr District | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| TMA (stationary) | 505-7001 | DAY | 19 | 13 (68%) | $150.00 | $230.00 |
| Replace single gdrail terminal post | 770-7017 | EACH | 20 | 10 (50%) | $60.00 | $96.00 |
| Replace cable (TL-4) | 771-7016 | LF | 13 | 10 (77%) | $1.00 | $4.00 |
| Realign posts | 770-7010 | EACH | 11 | 10 (91%) | $10.00 | $25.00 |
| Downstream anchor terminal section | 540-7015 | EACH | 22 | 9 (41%) | $1,200.00 | $1,485.00 |
| TMA (mobile operation) | 505-7003 | DAY | 16 | 9 (56%) | $250.00 | $291.17 |
| Replace blockout | 770-7018 | EACH | 14 | 9 (64%) | $10.00 | $32.00 |
| Install delineator assembly (D-SW)SZ 1(BRF)GF2 | 658-7018 | EACH | 13 | 9 (69%) | $20.00 | $32.50 |
| Full - width mowing | 730-7022 | ACRE | 42 | 8 (19%) | $53.50 | $45.00 |
| Litter removal | 734-7001 | ACRE | 28 | 8 (29%) | $19.50 | $20.00 |
| Replace rail element (thrie-beam) | 770-7002 | LF | 16 | 8 (50%) | $20.00 | $35.00 |
| Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) | 658-7019 | EACH | 15 | 8 (53%) | $20.00 | $35.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Abescape Group LLC | 25 | 11 of 25 |
| Rhino Equity, LLC | 20 | 9 of 20 |
| Jasco | 19 | 7 of 19 |
| Austin Barricade Company, L.L.C. | 18 | 8 of 18 |
| Ross Sa Enterprise LLC | 18 | 10 of 18 |
| R&M Incorporated | 16 | 13 of 16 |
| USA DT Services, Inc. | 15 | 3 of 15 |
| Ortega'S Lawn and Landscaping, LLC | 14 | 7 of 14 |
| Cross Plus Construction, LLC | 14 | 9 of 14 |
| Abescape Landscaping, LLC | 13 | 9 of 13 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 NOV 2026 | A00223372 | Waco District | MOWING HIGHWAY RIGHT OF WAY, SH0022 (VARIOUS ROADWAYS to ACROSS BOSQUE COUNTY) | 3 of 7 | $288,947 | +11% |
| 17 NOV 2026 | A00223374 | Waco District | MOWING HIGHWAY RIGHT OF WAY, US0084 (VARIOUS ROADWAYS to ACROSS CORYELL COUNTY) | 3 of 8 | $274,622 | +8.0% |
| 12 NOV 2026 | A00221878 | Dallas District | MOWING HIGHWAY RIGHT OF WAY, IH0035 (VARIOUS ROADWAYS to DENTON COUNTY MAINTENANCE SECTION) | 7 of 8 | $492,629 | +34% |
| 05 NOV 2026 | A00224313 | Lubbock District | METAL BEAM GUARD FENCE REPAIR, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS) | 2 of 4 | $253,134 | +60% |
| 29 OCT 2026 | A00222998 | Abilene District | METAL BEAM GUARD FENCE REPAIR, IH0020 (Various locations in to the Abilene Area) | 3 of 3 | $793,940 | +24% |
| 29 OCT 2026 | A00222999 | Abilene District | METAL BEAM GUARD FENCE REPAIR, IH0020 (Various locations in to the Big Spring Area) | 3 of 4 | $830,770 | +24% |
| 29 OCT 2026 | A00223000 | Abilene District | METAL BEAM GUARD FENCE REPAIR, US0084 (Various locations in to the Snyder Area) | 3 of 3 | $250,898 | +24% |
| 29 OCT 2026 | A00223097 | Abilene District | CABLE BARRIER REPAIR, IH0020 (Various Locations to in the Abilene District) | 2 of 3 | $764,883 | +10% |
| 29 OCT 2026 | A00223099 | Abilene District | CABLE BARRIER REPAIR, IH0020 (Various Locations to in the Abilene District) | 1 of 4 | $1,017,742 | Low, 0.0% under the second |
| 07 OCT 2026 | A00222519 | Waco District | METAL BEAM GUARD FENCE REPAIR, SH0006 (Various locations to In McLennan, Hill, Falls, & Limestone) | 1 of 4 | $1,158,972 | Low, 4.0% under the second |
| 06 OCT 2026 | A00222925 | Waco District | METAL BEAM GUARD FENCE REPAIR, US0190 (VARIOUS LOCATIONS to ACROSS BELL, CORYELL, HAMILTON AND BOSQE) | 2 of 3 | $790,639 | +5.0% |
| 17 SEP 2026 | A00223848 | San Angelo District | MOWING HIGHWAY RIGHT OF WAY, SH0208 (VARIOUS LOCATIONS IN TOM GREEN COUNTY to VARIOUS LOCATIONS IN TOM GREEN COUNTY) | 5 of 5 | $331,240 | +64% |
| 15 SEP 2026 | A00220286 | Odessa District | MOWING HIGHWAY RIGHT OF WAY, US0385 (VARIOUS to VARIOUS) | 6 of 6 | $526,320 | +116% |
| 15 SEP 2026 | A00223082 | Odessa District | MOWING HIGHWAY RIGHT OF WAY, US0067 (VARIOUS to VARIOUS) | 5 of 5 | $517,500 | +85% |
| 15 SEP 2026 | A00223755 | Brownwood District | MOWING HIGHWAY RIGHT OF WAY, US0067 (COMANCHE COUNTY to COMANCHE COUNTY) | 1 of 7 | $439,578 | Low, 7.0% under the second |
| 15 SEP 2026 | A00223847 | San Angelo District | MOWING HIGHWAY RIGHT OF WAY, SH0208 (VARIOUS HIGHWAYS IN TOM GREEN COUNTY to VARIOUS HIGHWAYS IN TOM GREEN COUNTY) | 4 of 5 | $363,150 | +39% |
| 02 SEP 2026 | A00200023 | Fort Worth District | Replace Guardrail, Various (VARIOUS LOCATIONS to WITHIN FORT WORTH DISTRICT) | 4 of 11 | $4,347,498 | +19% |
| 18 AUG 2026 | A00222586 | Waco District | CRASH CUSHION ATTENUATOR REPAIR, SH0195 (VARIOUS LOCATIONS to ACROSS WACO DISTRICT) | 1 of 1 | $1,037,026 | Low |
| 12 AUG 2026 | A00223094 | Bryan District | METAL BEAM GUARD FENCE REPAIR, SH0006 (Various to Various) | 2 of 2 | $264,615 | 0.0% |
| 11 AUG 2026 | A00223019 | Bryan District | METAL BEAM GUARD FENCE REPAIR, SH0036 (Various to Various) | 1 of 2 | $268,455 | Low, 10% under the second |
| 21 JUL 2026 | A00216493 | Beaumont District | METAL BEAM GUARD FENCE REPAIR, US0096 (US 96 to VARIOUS LOCATIONS) | 1 of 4 | $313,007 | Low, 44% under the second |
| 21 JUL 2026 | A00219602 | Beaumont District | METAL BEAM GUARD FENCE REPAIR, IH0010 (Various Locations in to Jefferson , Hardin, and Tyler Counties) | 1 of 5 | $473,882 | Low, 12% under the second |
| 14 JUL 2026 | A00220506 | Houston District | METAL BEAM GUARD FENCE REPAIR, US0290 (Various Highways in Waller County to Various Highways in Waller County) | 1 of 4 | $327,294 | Low, 52% under the second |
| 09 JUL 2026 | A00220198 | San Angelo District | MOWING HIGHWAY RIGHT OF WAY, US0377 (VARIOUS HWYS IN KIMBLE COUNTY to VARIOUS HWYS IN KIMBLE COUNTY) | 3 of 3 | $313,362 | +32% |
| 09 JUL 2026 | A00220199 | San Angelo District | MOWING HIGHWAY RIGHT OF WAY, FM2887 (VARIOUS HWYS IN RUNNELS COUNTY to VARIOUS HWYS IN RUNNELS COUNTY) | 5 of 5 | $311,480 | +52% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.