TxDOT contract A00220506 bid tabulation
METAL BEAM GUARD FENCE REPAIR, US0290 (Various Highways in Waller County to Various Highways in Waller County). Let by Texas DOT on July 14, 2026, Waller, Houston District. 4 bids received; low bid $327,294 by T&L Cleaning Services LLC, -38% against the engineer's estimate of $525,410.
- Owner
- Texas DOT
- Letting
- 14 JUL 2026
- Pay items
- 31
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | T&L Cleaning Services LLC | $327,294 | Low | -38% |
| 2 | Rhino Equity, LLC | $497,443 | +52% | -5.0% |
| 3 | Austin Barricade Company, L.L.C. | $660,512 | +102% | +26% |
| 4 | Isi Contracting, Inc. | $880,001 | +169% | +67% |
Engineer's estimate: $525,410.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. T&L Cleaning Services LLC | 2. Rhino Equity, LLC | 3. Austin Barricade Company, L.L.C. | 4. Isi Contracting, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (callout) (500-7002) | EACH | 10 | $756.00 | $200.00 | $1.00 | $4,985.00 | $280.00 |
| 2 | Mobilization (emergency) (500-7033) | EACH | 2 | $538.00 | $0.01 | $25.00 | $2,487.00 | $558.00 |
| 3 | TMA (stationary) (505-7001) | DAY | 100 | $206.00 | $0.01 | $1.00 | $1.00 | $658.00 |
| 4 | Metal W-beam guard fence (timber post) (540-7001) | LF | 100 | $18.00 | $10.00 | $25.00 | $87.00 | $72.00 |
| 5 | Downstream anchor terminal section (540-7015) | EACH | 8 | $100.00 | $900.00 | $1,000.00 | $400.00 | $1,425.00 |
| 6 | Guardrail end treatment (install) (544-7001) | EACH | 35 | $200.00 | $1.00 | $100.00 | $200.00 | $3,109.00 |
| 7 | Replace rail element (W-beam) (770-7001) | LF | 1,500 | $150.00 | $10.00 | $25.00 | $35.00 | $16.00 |
| 8 | Replace rail element (thrie-beam) (770-7002) | LF | 35 | $87.00 | $60.00 | $20.00 | $100.00 | $23.00 |
| 9 | Repl rail elmnt(thrie-BM trans to W-BM) (770-7003) | EACH | 35 | $54.00 | $60.00 | $25.00 | $1.00 | $941.00 |
| 10 | Replace timber post W/ concrete FND (770-7008) | EACH | 5 | $58.00 | $1,000.00 | $40.00 | $1,458.00 | $136.00 |
| 11 | Replace steel post W/ concrete FND (770-7009) | EACH | 5 | $34.00 | $1.00 | $40.00 | $987.00 | $185.00 |
| 12 | Realign posts (770-7010) | EACH | 20 | $21.00 | $0.01 | $10.00 | $486.00 | $10.20 |
| 13 | Replace terminal anchor posts (770-7012) | EACH | 8 | $5.00 | $50.00 | $1.00 | $1.00 | $826.00 |
| 14 | Rem obsolete get & repl W/ SGT (770-7013) | EACH | 70 | $2,071.00 | $2,000.00 | $3,000.00 | $2,500.00 | $2,650.00 |
| 15 | Repl single gdrail terminal impact head (770-7015) | EACH | 20 | $682.00 | $1,500.00 | $2,600.00 | $725.00 | $1,173.00 |
| 16 | Replace single gdrail terminal rail (770-7016) | LF | 1,600 | $18.00 | $10.00 | $30.00 | $35.00 | $33.00 |
| 17 | Replace single gdrail terminal post (770-7017) | EACH | 400 | $27.00 | $30.00 | $50.00 | $70.00 | $44.00 |
| 18 | Replace blockout (770-7018) | EACH | 260 | $80.00 | $50.00 | $20.00 | $125.00 | $26.00 |
| 19 | Replace SGT object marker (770-7021) | EACH | 60 | $29.00 | $60.00 | $5.00 | $1.00 | $37.00 |
| 20 | Replace SGT cable anchor (770-7022) | EACH | 15 | $46.00 | $150.00 | $100.00 | $1.00 | $128.00 |
| 21 | Replace SGT cable assembly (770-7023) | EACH | 15 | $54.00 | $150.00 | $100.00 | $1.00 | $165.00 |
| 22 | Replace SGT strut (770-7024) | EACH | 15 | $64.00 | $150.00 | $100.00 | $1.00 | $117.00 |
| 23 | Raise rail (770-7025) | LF | 200 | $3.00 | $0.01 | $1.00 | $10.00 | $7.20 |
| 24 | Repair rail element (curved rail) (770-7027) | LF | 50 | $22.00 | $0.01 | $25.00 | $215.00 | $49.00 |
| 25 | Replace posts (TL-4)(gibraltar) (771-7005) | EACH | 600 | $32.00 | $90.00 | $170.00 | $230.00 | $365.00 |
| 26 | Cable splice / turnbuckle (TL-4) (771-7010) | EACH | 2 | $121.00 | $500.00 | $1.00 | $500.00 | $973.00 |
| 27 | Repair or replace cable barrier terminal sec(TL-4) (771-7014) | EACH | 8 | $639.00 | $800.00 | $1.00 | $6,000.00 | $11,078 |
| 28 | Replace cable (TL-4) (771-7016) | LF | 40 | $5.00 | $10.00 | $1.00 | $10.00 | $8.30 |
| 29 | Check / RE-tension cable (TL-4) (771-7018) | EACH | 70 | $78.00 | $90.00 | $1.00 | $1.00 | $1.80 |
| 30 | Repair (T4(S)) (776-7010) | LF | 25 | $20.00 | $100.00 | $1.00 | $65.00 | $154.00 |
| 31 | Repair (steel post W/ base plate)(T4(S)) (776-7011) | EACH | 5 | $19.00 | $100.00 | $1.00 | $150.00 | $891.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 14, 2026. Compiled by Mirage Metrics.