TxDOT contract A00200023 bid tabulation
Replace Guardrail, Various (VARIOUS LOCATIONS to WITHIN FORT WORTH DISTRICT). Let by Texas DOT on September 2, 2026, Parker, Fort Worth District. 11 bids received; low bid $3,643,031 by Odum Services, LLC, -27% against the engineer's estimate of $4,975,541.
- Owner
- Texas DOT
- Letting
- 02 SEP 2026
- Pay items
- 29
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Odum Services, LLC | $3,643,031 | Low | -27% |
| 2 | 3LW Civil LLC | $3,806,232 | +4.0% | -24% |
| 3 | Garret Shields Infrastructure | $4,338,033 | +19% | -13% |
| 4 | T&L Cleaning Services LLC | $4,347,498 | +19% | -13% |
| 5 | HJC Farms, Inc. | $4,356,790 | +20% | -12% |
| 6 | Digg Commercial, LLC | $4,478,158 | +23% | -10% |
| 7 | Short-Line Corporation | $4,598,137 | +26% | -8.0% |
| 8 | Icos Management, LLC | $4,625,522 | +27% | -7.0% |
| 9 | Altus Construction LLC | $4,811,296 | +32% | -3.0% |
| 10 | Roadway Specialties, Inc. | $5,261,753 | +44% | +6.0% |
| 11 | Ragle Construction, Inc. | $5,872,430 | +61% | +18% |
Engineer's estimate: $4,975,541.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Odum Services, LLC | 2. 3LW Civil LLC | 3. Garret Shields Infrastructure | 4. T&L Cleaning Services LLC | 5. HJC Farms, Inc. | 6. Digg Commercial, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 1,050 | $12.00 | $10.00 | $30.00 | $10.00 | $21.00 | $12.75 | $10.00 |
| 2 | Removing concrete (rail) (104-7036) | LF | 60 | $36.00 | $12.00 | $50.00 | $100.00 | $100.00 | $86.25 | $50.00 |
| 3 | Embankment (final)(OC)(type B) (132-7003) | CY | 259 | $160.00 | $35.00 | $133.59 | $30.00 | $85.00 | $94.50 | $100.00 |
| 4 | Block sodding (162-7002) | SY | 1,869 | $10.00 | $8.00 | $0.10 | $8.00 | $10.50 | $9.75 | $15.00 |
| 5 | Broadcast seed (permanent_urban_clay) (164-7004) | SY | 3,588 | $0.95 | $1.50 | $0.10 | $0.50 | $3.15 | $0.35 | $10.00 |
| 6 | Vegetative watering (168-7001) | TGL | 223 | $350.00 | $50.00 | $0.10 | $25.00 | $200.00 | $35.71 | $25.00 |
| 7 | Riprap (mow strip)(4 in) (432-7013) | CY | 2,309.10 | $850.00 | $585.00 | $917.27 | $700.00 | $600.00 | $700.00 | $550.00 |
| 8 | Mobilization (500-7001) | LS | 1 | $375,000 | $100,000 | $54,000 | $300,000 | $495,000 | $400,000 | $350,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $6,200.00 | $5,000.00 | $3,087.53 | $5,000.00 | $15,500 | $2,500.00 | $5,000.00 |
| 10 | Portable changeable message sign (503-7002) | EACH | 4 | $8,500.00 | $10,000 | $0.10 | $10,000 | $10,000 | $15,000 | $10,000 |
| 11 | TMA (stationary) (505-7001) | DAY | 346 | $280.00 | $250.00 | $0.10 | $300.00 | $200.00 | $150.00 | $1,400.00 |
| 12 | Temporary sediment control fence (install) (506-7039) | LF | 36,419 | $5.00 | $3.50 | $0.10 | $5.00 | $5.00 | $3.00 | $4.00 |
| 13 | Temporary sediment control fence (remove) (506-7041) | LF | 36,419 | $2.00 | $1.00 | $0.10 | $1.00 | $1.00 | $0.75 | $1.00 |
| 14 | Metal W-beam guard fence (timber post) (540-7001) | LF | 38,705 | $25.00 | $22.50 | $16.00 | $25.00 | $20.00 | $27.00 | $25.00 |
| 15 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 73 | $2,060.00 | $1,700.00 | $2,210.00 | $1,500.00 | $2,000.00 | $2,500.00 | $2,291.00 |
| 16 | Short radius (28") (540-7013) | LF | 49 | $40.00 | $50.00 | $41.69 | $50.00 | $50.00 | $91.50 | $35.00 |
| 17 | Downstream anchor terminal section (540-7015) | EACH | 54 | $1,500.00 | $1,525.00 | $1,430.86 | $1,500.00 | $1,500.00 | $17.50 | $1,350.00 |
| 18 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 65 | $825.00 | $650.00 | $768.24 | $800.00 | $500.00 | $300.00 | $694.00 |
| 19 | Metal beam guard fence trans (31"-28")(25') (540-7031) | EACH | 2 | $500.00 | $550.00 | $708.20 | $1,000.00 | $400.00 | $1,325.00 | $1,200.00 |
| 20 | TL-3 31" short radius (complete) (540-7039) | EACH | 3 | $15,600 | $23,500 | $24,000 | $25,000 | $21,000 | $1,000.00 | $29,000 |
| 21 | Remove metal beam guard fence (542-7001) | LF | 40,162.50 | $3.00 | $2.00 | $0.10 | $1.00 | $1.00 | $2.00 | $2.00 |
| 22 | Remove downstream anchor terminal (542-7003) | EACH | 153 | $220.00 | $150.00 | $255.33 | $500.00 | $100.00 | $152.00 | $228.00 |
| 23 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 52 | $210.00 | $150.00 | $273.10 | $500.00 | $100.00 | $175.00 | $231.00 |
| 24 | Guardrail end treatment (install) (544-7001) | EACH | 139 | $3,300.00 | $2,875.00 | $2,965.00 | $3,200.00 | $4,000.00 | $4,000.00 | $3,123.00 |
| 25 | Guardrail end treatment (remove) (544-7003) | EACH | 51 | $250.00 | $300.00 | $298.99 | $500.00 | $100.00 | $300.00 | $315.00 |
| 26 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001) | EACH | 619 | $50.00 | $40.00 | $33.00 | $20.00 | $10.00 | $34.00 | $30.00 |
| 27 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 277 | $38.00 | $40.00 | $34.00 | $20.00 | $20.00 | $34.00 | $32.00 |
| 28 | Install delineator assembly (D-SY)SZ 1(yflx)GF2 (658-7021) | EACH | 91 | $31.00 | $40.00 | $33.00 | $20.00 | $10.00 | $34.00 | $34.00 |
| 29 | Install delineator assembly (D-SY)SZ 1(BRF)GF2(BI) (658-7037) | EACH | 24 | $35.00 | $40.00 | $34.00 | $20.00 | $20.00 | $34.00 | $36.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.