Central North Construction, LLC: TxDOT bid record

Central North Construction, LLC submitted 97 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 17 NOV 2026, and was the low bidder on 25 of them (26%). When it was not low, its total sat a median +32% above the low bid.

Owner
Texas DOT
Low bid volume
$33,521,245
Latest bid
17 NOV 2026
Data through
19 NOV 2026
97Bids
25Low bids
26Win rate, percent
+32%Median gap to the low bid when not low, 68 bids

By year

YearBidsLow bidsWin rate
202016531%
20217114%
20224250%
20238563%
20247457%
202527415%
202628414%
Central North Construction, LLC, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Fort Worth District261454%
Houston District24521%
Dallas District15533%
Austin District900%
Tyler District800%
San Antonio District4125%
Beaumont District200%
Waco District200%
Lufkin District200%
Abilene District100%
Atlanta District100%
Pharr District100%
Central North Construction, LLC, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Barricades, signs and traffic handling502-7001MO6838 (56%)$2,500.00$5,000.00
Biodegradable erosion control logs (remove)506-7046LF5635 (63%)$0.50$1.40
TMA (stationary)505-7001DAY3919 (49%)$250.00$230.00
Biodegradable erosion control logs (install) (8")506-7043LF3018 (60%)$1.25$6.00
Plant bed preparation192-7009SY2914 (48%)$4.00$6.47
TMA (mobile operation)505-7003DAY2414 (58%)$250.00$291.17
Vegetative watering168-7001TGL2013 (65%)$18.00$37.73
Block sodding162-7002SY2710 (37%)$6.00$6.20
Fertilizer166-7001ACRE2310 (43%)$985.00$950.00
Plant material (45 gal) (tree)192-7040EACH2210 (45%)$490.00$500.00
Mobilization (callout)500-7002EACH1510 (67%)$550.00$688.00
Mulch192-7002SY1510 (67%)$3.00$4.00
Central North Construction, LLC, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Central North Construction, LLC, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
17 NOV 2026A00223372Waco DistrictMOWING HIGHWAY RIGHT OF WAY, SH0022 (VARIOUS ROADWAYS to ACROSS BOSQUE COUNTY)6 of 7$403,896+55%
17 NOV 2026A00223374Waco DistrictMOWING HIGHWAY RIGHT OF WAY, US0084 (VARIOUS ROADWAYS to ACROSS CORYELL COUNTY)6 of 8$380,910+50%
17 NOV 2026A00224263Bryan DistrictMOWING HIGHWAY RIGHT OF WAY, SH0006 (Various to Various)3 of 9$519,665+9.0%
03 NOV 2026A00221476Houston DistrictLandscape Development, IH 10 (SH 99(W) to SH 6)5 of 5$2,192,700+90%
06 AUG 2026A00217764Austin DistrictLandscape Development, Various (Various locations Bastrop County to SL 109; SH 21; US 290; FM 1704)7 of 8$645,244+188%
06 AUG 2026A00213982Lufkin DistrictLandscape Development, Various (Various Locations Districtwide to .)5 of 5$757,363+67%
05 AUG 2026A00191479Pharr DistrictLandscape Development, BU 77X (E. Washington Ave. to E. Jefferson Ave.)6 of 6$898,615+273%
02 JUL 2026A00217109Fort Worth DistrictLandscape Development, IH 20 (Mikus Road to East of Mikus Road)1 of 7$291,494Low, 12% under the second
02 JUL 2026A00217103Fort Worth DistrictLandscape Development, FM 156 (FM 156/ S Blue Mound Road to End of Median)1 of 7$159,000Low, 20% under the second
02 JUL 2026A00215672Tyler DistrictLandscape Development, Various (Kaufman C/L to Harrison C/L)6 of 6$1,706,200+682%
01 JUL 2026A00196687Dallas DistrictConstruct Pedestrian Infrastructure, FM 3039 (South of Hunter Lane to South of West Lewis)7 of 9$852,160+42%
01 JUL 2026A00217580Fort Worth DistrictLandscape Development, SH 199 (East SH199 at Boyd Rd (FM 730) to West SH199 at Boyd Rd (FM 730))2 of 6$322,918+13%
01 JUL 2026A00217112Fort Worth DistrictLandscape Development, US 377 (Basswood Blvd to Starnes Rd)2 of 6$405,417+4.0%
01 JUL 2026A00214038Paris DistrictLandscape Development, US 377 (At BU 377 B to .)4 of 4$668,075+36%
03 JUN 2026A00212313Beaumont DistrictLandscape Development, Various (DISTRICTWIDE to .)3 of 5$1,291,942+5.0%
02 JUN 2026A00217763Austin DistrictLandscape Development, Various (Various Locations Williamson County to IH 35, FM 972; US 79; SH 95)3 of 6$1,768,765+17%
07 MAY 2026A00198364Houston DistrictLandscape Development, SH 242 (FM 1488 to East of IH 45)1 of 7$1,579,083Low, 7.0% under the second
06 MAY 2026A00199223Houston DistrictLandscape Development, FM 1488 (FM 1774 to FM 149)2 of 5$2,335,691+10%
15 APR 2026A00218952Dallas DistrictMOWING HIGHWAY RIGHT OF WAY, US0380 (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION)6 of 6$358,955+50%
15 APR 2026A00218953Dallas DistrictMOWING HIGHWAY RIGHT OF WAY, US0075 (VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION)6 of 6$550,072+56%
15 APR 2026A00219122Fort Worth DistrictMOWING HIGHWAY RIGHT OF WAY, US0380 (VARIOUS LOCATIONS WITHIN to Jack and Wise Counties)7 of 7$1,475,029+105%
08 APR 2026A00199263Houston DistrictLandscape Development, IH 45 (Virginia Point Road to SH 87)2 of 4$3,281,000+3.0%
07 APR 2026A00217861Houston DistrictLandscape Development, SH 242 (IH 45 to IH 69)4 of 7$1,852,462+22%
10 MAR 2026A00218362Houston DistrictMOWING HIGHWAY RIGHT OF WAY, IH0045 (Various Highways in Montgomery County to Various Highways in Montgomery County)3 of 4$617,630+19%
04 MAR 2026A00213451San Antonio DistrictLandscape Development, Various (Various Locations Districtwide to .)1 of 5$2,101,093Low, 40% under the second
Central North Construction, LLC: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy