Tight Line Construction, LLC: TxDOT bid record
Tight Line Construction, LLC submitted 94 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 04 NOV 2026, and was the low bidder on 27 of them (29%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $11,045,330
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 12 | 3 | 25% |
| 2021 | 10 | 5 | 50% |
| 2022 | 8 | 4 | 50% |
| 2023 | 7 | 2 | 29% |
| 2024 | 16 | 4 | 25% |
| 2025 | 16 | 4 | 25% |
| 2026 | 25 | 5 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Tyler District | 19 | 8 | 42% |
| Austin District | 18 | 5 | 28% |
| Fort Worth District | 12 | 3 | 25% |
| San Antonio District | 11 | 0 | 0% |
| Atlanta District | 5 | 0 | 0% |
| Yoakum District | 4 | 1 | 25% |
| Lufkin District | 4 | 0 | 0% |
| Beaumont District | 3 | 1 | 33% |
| Waco District | 3 | 2 | 67% |
| Dallas District | 3 | 0 | 0% |
| Corpus Christi District | 2 | 2 | 100% |
| Wichita Falls District | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 82 | 21 (26%) | $3,000.00 | $5,000.00 |
| Plant bed preparation | 192-7009 | SY | 36 | 13 (36%) | $9.00 | $6.47 |
| Plant maintenance | 193-6001 | MO | 28 | 12 (43%) | $1,000.00 | $1,800.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 58 | 9 (16%) | $2.00 | $1.40 |
| Irrig sys oper and maintenance | 193-7007 | MO | 36 | 8 (22%) | $1,000.00 | $1,200.00 |
| TMA (stationary) | 505-7001 | DAY | 26 | 8 (31%) | $350.00 | $230.00 |
| Sandbags for erosion control | 506-7035 | EACH | 14 | 8 (57%) | $1.50 | $10.66 |
| Block sodding | 162-7002 | SY | 24 | 7 (29%) | $10.75 | $6.20 |
| Plant material (30 gal) (tree) | 192-7039 | EACH | 13 | 7 (54%) | $300.00 | $325.00 |
| Trench excavation protection | 402-7001 | LF | 7 | 7 (100%) | $1.00 | $10.00 |
| Wildflower seeding | 180-7001 | ACRE | 30 | 6 (20%) | $1,192.50 | $1,638.25 |
| Plant material (45 gal) (tree) | 192-7040 | EACH | 14 | 6 (43%) | $425.00 | $500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Central North Construction, LLC | 41 | 16 of 41 |
| Apex Landscape & Irrigation, LLC | 36 | 19 of 36 |
| Texas Road Construction, LLC | 28 | 9 of 28 |
| Encino Landscape, Inc. | 17 | 13 of 17 |
| Rare Earth Landscape Solutions LLC | 14 | 3 of 14 |
| 3LW Civil LLC | 13 | 9 of 13 |
| Green Sage Services LLC | 13 | 3 of 13 |
| Garret Shields Infrastructure | 12 | 9 of 12 |
| Yellowstone Landscape - Central, Inc. | 11 | 3 of 11 |
| Abescape Landscaping, LLC | 11 | 2 of 11 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00206976 | Austin District | Construct Pedestrian Infrastructure, RM 12 (Old Kyle Road to FM 3237) | 9 of 9 | $1,700,314 | +79% |
| 03 SEP 2026 | A00212859 | Fort Worth District | State Park Improvements, Various (At Possum Kingdom State Park to .) | 4 of 7 | $561,660 | +36% |
| 03 SEP 2026 | A00207181 | Yoakum District | Construct Pedestrian Infrastructure, US 87 (TROPICAL DRIVE to BU 59T) | 7 of 7 | $6,881,478 | +29% |
| 02 SEP 2026 | A00212599 | Pharr District | Landscape Development, PR 100 (PR 100 (WB) to PR 100 (EB)) | 1 of 5 | $93,070 | Low, 1.0% under the second |
| 02 SEP 2026 | A00206056 | Wichita Falls District | Construct Pedestrian Infrastructure, BU 287J (City View Dr to SL 11 WFR) | 1 of 7 | $1,031,370 | Low, 3.0% under the second |
| 06 AUG 2026 | A00217764 | Austin District | Landscape Development, Various (Various locations Bastrop County to SL 109; SH 21; US 290; FM 1704) | 2 of 8 | $288,954 | +29% |
| 06 AUG 2026 | A00213982 | Lufkin District | Landscape Development, Various (Various Locations Districtwide to .) | 3 of 5 | $512,059 | +13% |
| 05 AUG 2026 | A00207273 | Atlanta District | Landscape Development, Various (Various locations to Various locations) | 2 of 4 | $138,920 | +17% |
| 05 AUG 2026 | A00191479 | Pharr District | Landscape Development, BU 77X (E. Washington Ave. to E. Jefferson Ave.) | 3 of 6 | $272,291 | +13% |
| 05 AUG 2026 | A00206966 | Paris District | Construct Pedestrian Infrastructure, SH 5 (Newport Drive to Umphress Street) | 10 of 10 | $1,665,425 | +68% |
| 02 JUL 2026 | A00212148 | Abilene District | Bicycle And Pedestrian Improvements, FM 3438 (HARTFORD ST to 600 FT N OF LITTLE ELM CREEK) | 7 of 7 | $380,920 | +50% |
| 02 JUL 2026 | A00217109 | Fort Worth District | Landscape Development, IH 20 (Mikus Road to East of Mikus Road) | 2 of 7 | $326,471 | +12% |
| 02 JUL 2026 | A00217103 | Fort Worth District | Landscape Development, FM 156 (FM 156/ S Blue Mound Road to End of Median) | 5 of 7 | $269,004 | +69% |
| 02 JUL 2026 | A00215672 | Tyler District | Landscape Development, Various (Kaufman C/L to Harrison C/L) | 4 of 6 | $317,379 | +45% |
| 01 JUL 2026 | A00214038 | Paris District | Landscape Development, US 377 (At BU 377 B to .) | 1 of 4 | $491,699 | Low, 1.0% under the second |
| 03 JUN 2026 | A00212313 | Beaumont District | Landscape Development, Various (DISTRICTWIDE to .) | 2 of 5 | $1,239,258 | 0.0% |
| 03 JUN 2026 | A00217765 | Austin District | Landscape Development, Various (Various locations Districtwide to .) | 1 of 6 | $425,750 | Low, 2.0% under the second |
| 02 JUN 2026 | A00217763 | Austin District | Landscape Development, Various (Various Locations Williamson County to IH 35, FM 972; US 79; SH 95) | 2 of 6 | $1,618,773 | +7.0% |
| 07 MAY 2026 | A00198364 | Houston District | Landscape Development, SH 242 (FM 1488 to East of IH 45) | 3 of 7 | $1,685,692 | +7.0% |
| 06 MAY 2026 | A00206377 | Bryan District | Construct Pedestrian Infrastructure, FM 3090 (SH 6 SB Frontage Road to N. Railroad Street) | 8 of 10 | $2,605,625 | +42% |
| 07 APR 2026 | A00217861 | Houston District | Landscape Development, SH 242 (IH 45 to IH 69) | 1 of 7 | $1,514,369 | Low, 14% under the second |
| 05 MAR 2026 | A00198645 | Tyler District | Construct Pedestrian Infrastructure, Various (VARIOUS LOCATION to TYLER DISTRICT) | 8 of 14 | $1,256,771 | +21% |
| 04 MAR 2026 | A00213451 | San Antonio District | Landscape Development, Various (Various Locations Districtwide to .) | 5 of 5 | $3,391,190 | +61% |
| 04 FEB 2026 | A00216465 | Dallas District | Landscape Development, SH 66 (Nona Street to East City Limits) | 3 of 5 | $936,809 | +31% |
| 07 JAN 2026 | A00206403 | Tyler District | Hazard Elimination & Safety, NEW COPELAND RD (at Rose Rudman Trail to and Hubbard Middle School) | 3 of 4 | $636,391 | +18% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.