TxDOT contract A00206403 bid tabulation
Hazard Elimination & Safety, NEW COPELAND RD (at Rose Rudman Trail to and Hubbard Middle School). Let by Texas DOT on January 7, 2026, Smith, Tyler District. 4 bids received; low bid $539,227 by Reynolds & Kay, LTD., -2.8% against the engineer's estimate of $554,995.
- Owner
- Texas DOT
- Letting
- 07 JAN 2026
- Pay items
- 88
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Reynolds & Kay, LTD. | $539,227 | Low | -3.0% |
| 2 | Garret Shields Infrastructure | $573,656 | +6.0% | +3.0% |
| 3 | Tight Line Construction, LLC | $636,391 | +18% | +15% |
| 4 | Grey Sky Construction LLC | $653,357 | +21% | +18% |
Engineer's estimate: $554,995.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Reynolds & Kay, LTD. | 2. Garret Shields Infrastructure | 3. Tight Line Construction, LLC | 4. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparation row (tree prune and trim) (100-7010) | STA | 0.50 | $1,100.00 | $3,000.00 | $10,000 | $20,000 | $50,000 |
| 2 | Removing concrete (medians) (104-7008) | SY | 15 | $80.00 | $50.00 | $300.00 | $20.00 | |
| 3 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 352 | $21.00 | $18.00 | $40.00 | $55.00 | $20.00 |
| 4 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 227 | $50.00 | $20.00 | $55.00 | $20.00 | |
| 5 | Remove (8") TRT/untrt base & asphalt pavement (105-7028) | SY | 149 | $5.10 | $30.00 | $20.00 | $50.00 | $20.00 |
| 6 | Excavation (roadway) (110-7001) | CY | 138 | $16.00 | $17.00 | $50.00 | $100.00 | $20.00 |
| 7 | Backfill (type B)(vehicle) (134-7007) | CY | 33 | $50.00 | $42.00 | $40.00 | $125.00 | $100.00 |
| 8 | Block sodding (162-7002) | SY | 192 | $5.00 | $9.00 | $8.00 | $15.00 | $10.00 |
| 9 | Vegetative watering (168-7001) | TGL | 17 | $7.15 | $50.00 | $50.00 | $100.00 | $20.00 |
| 10 | Rework BS metal (type C)(8")(ord comp) (251-7051) | SY | 120 | $23.00 | $30.00 | $40.00 | $100.00 | $25.00 |
| 11 | Flexible pavement structure repair(8") (351-7007) | SY | 66 | $48.00 | $120.00 | $120.00 | $100.00 | $90.00 |
| 12 | Concrete pavement (CRCP)(fast TRK) (10") (360-7074) | SY | 22 | $200.00 | $200.00 | $450.00 | $200.00 | |
| 13 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 22 | $425.00 | $270.00 | $400.00 | $481.25 | $450.00 |
| 14 | Mobilization (500-7001) | LS | 1 | $48,000 | $52,000 | $40,000 | $60,000 | $50,000 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $8,000.00 | $3,000.00 | $5,000.00 | $2,500.00 | $8,500.00 |
| 16 | Portable changeable message sign (503-7001) | DAY | 12 | $1,352.00 | $100.00 | $100.00 | $225.00 | $150.00 |
| 17 | TMA (stationary) (505-7001) | DAY | 40 | $210.00 | $250.00 | $300.00 | $400.00 | $250.00 |
| 18 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 60 | $5.50 | $36.00 | $6.00 | $20.00 | $18.00 |
| 19 | Biodegradable erosion control logs (remove) (506-7046) | LF | 60 | $1.36 | $10.00 | $1.00 | $5.00 | $9.00 |
| 20 | Colored textured concrete (8") (528-7005) | SY | 86 | $200.00 | $228.00 | $120.00 | $250.00 | $150.00 |
| 21 | Concrete curb & gutter (type II) (529-7009) | LF | 388 | $40.00 | $55.00 | $50.00 | $70.00 | $65.00 |
| 22 | Concrete sidewalks (4") (531-7001) | SY | 336 | $75.00 | $120.00 | $100.00 | $95.00 | $60.00 |
| 23 | Curb ramps (type 1) (531-7005) | EACH | 1 | $3,050.00 | $4,200.00 | $3,000.00 | $5,000.00 | $2,850.00 |
| 24 | Curb ramps (type 3) (531-7007) | EACH | 7 | $3,800.00 | $4,000.00 | $3,000.00 | $5,000.00 | $2,850.00 |
| 25 | Curb ramps (type 7) (531-7010) | EACH | 2 | $3,500.00 | $3,000.00 | $4,500.00 | $2,850.00 | |
| 26 | Curb ramps (type 21) (531-7013) | EACH | 2 | $3,750.00 | $4,000.00 | $3,000.00 | $5,000.00 | $2,850.00 |
| 27 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 295 | $15.00 | $17.00 | $23.00 | $15.00 | $20.00 |
| 28 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 80 | $22.00 | $25.00 | $25.00 | $22.50 | $30.00 |
| 29 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 75 | $31.00 | $28.00 | $35.00 | $40.00 | |
| 30 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 445 | $45.00 | $35.00 | $42.00 | $45.00 | $60.00 |
| 31 | Electrical conductor (no.12) insulated (620-7004) | LF | 160 | $1.50 | $2.25 | $2.60 | $2.20 | $3.00 |
| 32 | Electrical conductor (no.8) insulated (620-7008) | LF | 628 | $2.40 | $2.50 | $3.50 | $2.50 | $3.00 |
| 33 | Electrical conductor (no.6) bare (620-7009) | LF | 995 | $2.40 | $3.00 | $3.60 | $3.15 | $3.00 |
| 34 | Electrical conductor (no.6) insulated (620-7010) | LF | 206 | $2.80 | $3.00 | $4.00 | $3.15 | $3.00 |
| 35 | Ground box type D (162922)W/apron (624-7008) | EACH | 7 | $1,800.00 | $1,400.00 | $2,000.00 | $1,687.50 | $1,150.00 |
| 36 | Remove electrical services (628-7002) | EACH | 1 | $750.00 | $500.00 | $1,250.00 | $6,500.00 | |
| 37 | Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190) | EACH | 2 | $11,500 | $6,600.00 | $10,000 | $9,375.00 | $12,500 |
| 38 | Aluminum signs (type A) (636-7001) | SF | 45 | $38.00 | $70.00 | $40.00 | $85.00 | $30.00 |
| 39 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $725.00 | $770.00 | $800.00 | $1,250.00 | $1,150.00 |
| 40 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $780.00 | $875.00 | $800.00 | $1,250.00 | $1,150.00 |
| 41 | Remove SM RD SN sup&AM (644-7073) | EACH | 2 | $110.00 | $160.00 | $100.00 | $250.00 | $100.00 |
| 42 | Install object marker assembly (OM-1)(WFLX)GND (658-7054) | EACH | 2 | $650.00 | $410.00 | $800.00 | $250.00 | $100.00 |
| 43 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 185 | $2.00 | $2.20 | $2.50 | $6.00 | |
| 44 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 596 | $6.62 | $7.75 | $8.30 | $9.40 | $12.00 |
| 45 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 120 | $3.89 | $5.00 | $5.50 | $6.25 | $8.00 |
| 46 | Pavement sler 4" (666-7346) | LF | 1,294 | $0.51 | $1.00 | $1.10 | $1.25 | $1.00 |
| 47 | Pavement sler 8" (666-7348) | LF | 185 | $1.00 | $1.10 | $1.25 | $6.00 | |
| 48 | Pavement sler 12" (666-7350) | LF | 120 | $1.16 | $2.00 | $2.20 | $2.50 | $8.00 |
| 49 | Pavement sler 24" (666-7352) | LF | 596 | $2.04 | $2.00 | $2.20 | $2.50 | $12.00 |
| 50 | Pavement sler (arrow) (666-7353) | EACH | 2 | $100.00 | $110.00 | $125.00 | $250.00 | |
| 51 | Pavement sler (word) (666-7354) | EACH | 2 | $100.00 | $110.00 | $125.00 | $250.00 | |
| 52 | Reflectorized pavement marking type I (W)4"(broken)(100MIL) (666-7402) | LF | 320 | $3.06 | $5.00 | $5.60 | $6.25 | $1.00 |
| 53 | Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405) | LF | 164 | $5.00 | $5.60 | $6.25 | $1.00 | |
| 54 | Reflectorized pavement marking type I (Y)4"(broken)(100MIL) (666-7414) | LF | 40 | $1.80 | $5.00 | $5.60 | $6.25 | $1.00 |
| 55 | Reflectorized pavement marking type I (Y)4"(solid)(100MIL) (666-7417) | LF | 810 | $1.07 | $5.00 | $5.60 | $6.25 | $1.00 |
| 56 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 2 | $230.00 | $250.00 | $285.00 | $250.00 | |
| 57 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 2 | $300.00 | $300.00 | $350.00 | $250.00 | |
| 58 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 28 | $4.17 | $11.00 | $11.00 | $12.50 | $6.00 |
| 59 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 26 | $11.00 | $11.00 | $12.50 | $6.00 | |
| 60 | Eliminating existing PM & markers (4") (677-7001) | LF | 364 | $2.00 | $2.25 | $2.50 | $1.00 | |
| 61 | Eliminating existing PM & markers (6") (677-7002) | LF | 880 | $0.45 | $3.00 | $3.30 | $3.75 | $3.00 |
| 62 | Eliminating existing PM & markers (8") (677-7004) | LF | 195 | $4.00 | $4.40 | $5.00 | $6.00 | |
| 63 | Eliminating existing PM & markers (12") (677-7006) | LF | 60 | $5.00 | $5.50 | $6.25 | $8.00 | |
| 64 | Eliminating existing PM & markers (24") (677-7008) | LF | 214 | $3.50 | $5.00 | $5.50 | $6.25 | $12.00 |
| 65 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $150.00 | $166.00 | $190.00 | $250.00 | |
| 66 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $150.00 | $166.00 | $190.00 | $250.00 | |
| 67 | Pavement surface preparation for marking (4") (678-7001) | LF | 1,334 | $0.40 | $0.50 | $0.56 | $0.75 | $1.00 |
| 68 | Pavement surface preparation for marking (8") (678-7004) | LF | 185 | $0.75 | $0.85 | $1.00 | $6.00 | |
| 69 | Pavement surface preparation for marking (12") (678-7006) | LF | 120 | $0.48 | $1.50 | $1.70 | $1.90 | $8.00 |
| 70 | Pavement surface preparation for marking (24") (678-7008) | LF | 596 | $1.15 | $2.50 | $2.80 | $3.15 | $12.00 |
| 71 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $100.00 | $110.00 | $125.00 | $250.00 | |
| 72 | Pavement surface preparation for marking (word) (678-7016) | EACH | 2 | $100.00 | $110.00 | $125.00 | $250.00 | |
| 73 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 54 | $0.90 | $2.00 | $2.20 | $2.50 | $50.00 |
| 74 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $40,000 | $44,500 | $55,000 | $41,250 | $55,000 |
| 75 | Install highway traffic signal (upgrade) (680-7011) | EACH | 1 | $36,000 | $24,000 | $6,250.00 | $45,000 | |
| 76 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 6 | $400.00 | $270.00 | $450.00 | $500.00 | $350.00 |
| 77 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 12 | $400.00 | $270.00 | $450.00 | $500.00 | $350.00 |
| 78 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 10 | $925.00 | $475.00 | $900.00 | $1,062.50 | $2,850.00 |
| 79 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 6 | $2,005.00 | $215.00 | $325.00 | $315.00 | $250.00 |
| 80 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 1,653 | $2.75 | $2.50 | $4.30 | $3.50 | $3.00 |
| 81 | Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036) | LF | 589 | $4.85 | $3.50 | $6.75 | $3.75 | $3.00 |
| 82 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 1,628 | $2.65 | $2.00 | $4.00 | $2.50 | $3.00 |
| 83 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 2 | $14,000 | $18,000 | $22,000 | $18,500 | $20,000 |
| 84 | Pedestrian pole assembly (687-7001) | EACH | 8 | $3,100.00 | $3,300.00 | $3,125.00 | $1,850.00 | |
| 85 | Pedestrian detect push button (APS) (688-7001) | EACH | 10 | $1,100.00 | $730.00 | $1,200.00 | $1,500.00 | $1,850.00 |
| 86 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $4,800.00 | $3,100.00 | $5,000.00 | $4,375.00 | $3,500.00 |
| 87 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $8,800.00 | $10,000 | $9,000.00 | $10,000 | |
| 88 | Radar presence detector comm cable (6008-7009) | LF | 362 | $4.75 | $5.50 | $3.75 | $3.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.