Rare Earth Landscape Solutions LLC: TxDOT bid record
Rare Earth Landscape Solutions LLC submitted 30 bids on Texas DOT contracts in the data, from 05 JUN 2024 to 03 NOV 2026, and was the low bidder on 6 of them (20%). When it was not low, its total sat a median +35% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $2,917,142
- Latest bid
- 03 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 5 | 2 | 40% |
| 2025 | 16 | 2 | 13% |
| 2026 | 9 | 2 | 22% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Austin District | 9 | 4 | 44% |
| Fort Worth District | 5 | 0 | 0% |
| San Antonio District | 5 | 2 | 40% |
| Waco District | 2 | 0 | 0% |
| Brownwood District | 2 | 0 | 0% |
| Tyler District | 2 | 0 | 0% |
| Pharr District | 1 | 0 | 0% |
| Bryan District | 1 | 0 | 0% |
| Dallas District | 1 | 0 | 0% |
| Corpus Christi District | 1 | 0 | 0% |
| Childress District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 29 | 8 (28%) | $5,420.00 | $5,000.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 16 | 8 (50%) | $1.00 | $1.40 |
| TMA (stationary) | 505-7001 | DAY | 6 | 4 (67%) | $300.00 | $230.00 |
| Remove SM RD SN sup&AM | 644-7073 | EACH | 7 | 3 (43%) | $50.00 | $110.00 |
| Landscape establish | 193-7001 | MO | 8 | 2 (25%) | $1,695.00 | $2,500.00 |
| Mulch | 192-7001 | CY | 7 | 2 (29%) | $75.20 | $50.00 |
| Plant material (1 gal) | 192-7026 | EACH | 6 | 2 (33%) | $10.41 | $10.00 |
| Irrig sys oper and maintenance | 193-7007 | MO | 12 | 1 (8%) | $1,000.00 | $1,200.00 |
| Biodegradable erosion control logs (install) (8") | 506-7043 | LF | 7 | 1 (14%) | $5.00 | $6.00 |
| Landscape edge | 192-7016 | LF | 7 | 1 (14%) | $16.50 | $19.65 |
| Plant material (5 gal) | 192-7029 | EACH | 6 | 1 (17%) | $30.00 | $40.00 |
| Install small roadside sign support and assembly TYS80(1)SA(P) | 644-7025 | EACH | 5 | 1 (20%) | $900.00 | $850.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Tight Line Construction, LLC | 14 | 11 of 14 |
| Central North Construction, LLC | 10 | 6 of 10 |
| Texas Road Construction, LLC | 9 | 3 of 9 |
| Rhino Equity, LLC | 7 | 5 of 7 |
| HJC Farms, Inc. | 6 | 2 of 6 |
| Structural Integrity Group LLC | 6 | 1 of 6 |
| Green Sage Services LLC | 5 | 2 of 5 |
| Jasco | 5 | 0 of 5 |
| Garret Shields Infrastructure | 5 | 0 of 5 |
| Apex Landscape & Irrigation, LLC | 5 | 3 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 NOV 2026 | A00215476 | Austin District | SMALL SIGN REPLACEMENT, SH0045 (VARIOUS LOCATIONS IN WILLIAMSON to AND TRAVIS COUNTIES) | 2 of 7 | $987,821 | +3.0% |
| 09 SEP 2026 | A00215473 | Austin District | SMALL SIGN REPLACEMENT, SH0130 (VARIOUS LOCATIONS IN to TRAVIS COUNTY) | 1 of 4 | $620,666 | Low, 8.0% under the second |
| 02 SEP 2026 | A00212599 | Pharr District | Landscape Development, PR 100 (PR 100 (WB) to PR 100 (EB)) | 2 of 5 | $93,992 | +1.0% |
| 06 AUG 2026 | A00217764 | Austin District | Landscape Development, Various (Various locations Bastrop County to SL 109; SH 21; US 290; FM 1704) | 3 of 8 | $300,791 | +34% |
| 02 JUN 2026 | A00217763 | Austin District | Landscape Development, Various (Various Locations Williamson County to IH 35, FM 972; US 79; SH 95) | 5 of 6 | $1,931,089 | +27% |
| 08 APR 2026 | A00197324 | Austin District | Install/Replace Signs, Various (VARIOUS LOCATIONS IN TRAVIS to & HAYS COUNTIES) | 2 of 7 | $409,525 | +5.0% |
| 14 JAN 2026 | A00215471 | Austin District | SMALL SIGN REPLACEMENT, SH0130 (VARIOUS LOCATIONS IN to WILLIAMSON COUNTY) | 1 of 9 | $522,876 | Low, 5.0% under the second |
| 07 JAN 2026 | A00213720 | Corpus Christi District | Install/Replace Signs, Various (Various locations to San Patricio, Nueces Co.) | 4 of 6 | $49,985 | +103% |
| 06 JAN 2026 | A00206389 | Childress District | Hazard Elimination & Safety, US 82 (3.20 Miles East of the Benjamin C/L to 1.40 Miles) | 2 of 7 | $246,740 | +4.0% |
| 17 DEC 2025 | A00217857 | San Antonio District | BRIDGE SCOUR REPAIR, FM0775 (UNNAMED DRAW to UNNAMED DRAW) | 5 of 8 | $87,959 | +64% |
| 17 DEC 2025 | A00214340 | San Antonio District | EROSION REPAIR, FM2439 (AT UNNAMED DRAW to AT UNNAMED DRAW) | 4 of 6 | $39,914 | +41% |
| 09 DEC 2025 | A00217158 | Bryan District | CURB & GUTTER MAINT, US0079 (Buffalo City Limits to SH 75) | 3 of 4 | $130,040 | +63% |
| 15 OCT 2025 | A00216183 | San Antonio District | BRIDGE SCOUR REPAIR, US0087 (AT JAMES CREEK to AT JAMES CREEK) | 2 of 5 | $53,611 | +34% |
| 15 OCT 2025 | A00217596 | Austin District | LITTER REMOVAL, US0281 (VARIOUS LOCATIONS IN BURNET to AND LLANO COUNTIES) | 1 of 8 | $126,252 | Low, 27% under the second |
| 05 SEP 2025 | A00213273 | Fort Worth District | Landscape Development, US 81 (FM 407 to S of FM 407) | 5 of 6 | $335,521 | +46% |
| 05 SEP 2025 | A00211554 | Tyler District | Landscape Development, Various (VARIOUS LOCATIONS ALONG to US 79) | 3 of 7 | $143,023 | +20% |
| 04 SEP 2025 | A00212790 | Brownwood District | Hazard Elimination & Safety, SH 36 (0.4 MI W. OF FM 587 to CR 274) | 4 of 10 | $64,357 | +54% |
| 04 SEP 2025 | A00212789 | Brownwood District | Hazard Elimination & Safety, FM 500 (CR205 to CR211) | 3 of 12 | $127,802 | +35% |
| 04 SEP 2025 | A00211512 | Tyler District | Landscape Development, Various (VARIOUS LOCATION ON SH 31 to AND FM 315) | 5 of 5 | $77,476 | +44% |
| 08 AUG 2025 | A00201249 | Austin District | Landscape Development, Various (Various Locations Districtwide to .) | 3 of 5 | $805,060 | +39% |
| 07 AUG 2025 | A00213110 | Fort Worth District | Landscape Development, Various (Various Locations to In Mineral Wells) | 3 of 5 | $475,614 | +36% |
| 02 JUL 2025 | A00208137 | Waco District | Landscape Development, US 84 (@ Poage Dr to @ Poage Dr) | 3 of 3 | $211,854 | +28% |
| 01 JUL 2025 | A00212752 | Austin District | Landscape Development, GREENLEE DR (At Tippit Middle School to .) | 1 of 5 | $1,125,475 | Low, 25% under the second |
| 05 JUN 2025 | A00210994 | Dallas District | Landscape Development, US 75 (at W. White St to .) | 6 of 6 | $478,502 | +42% |
| 07 JAN 2025 | A00208135 | Waco District | Landscape Development, FS 439 (@ US 190 to @ US 190) | 3 of 3 | $232,749 | +94% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.