TxDOT letting results, September 4, 2025
48 contracts let by Texas DOT on September 4, 2025, $309,219,646 in low bids, a median of 5 bidders per contract. On the 48 with an engineer's estimate, the low bid came in under it 44 times; median low bid -14% against the estimate.
- Owner
- Texas DOT
- Contracts
- 48
- Low bids, total
- $309,219,646
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00127796 | Construct New Road, US 87 (EAST OF US 385/US 87 INTERCHANGE to MOORE COUNTY LINE) | Amarillo District | 6 | FNF Construction, Inc. | $99,678,127 | $128,810,290 | +29% | -41% | TxDOT |
| A00128327 | Widen Road - Add Lanes, SH 107 (SH 495 to FM 1924) | Pharr District | 7 | Texas Cordia Construction, LLC | $32,261,532 | $34,208,541 | +6.0% | -8.0% | TxDOT |
| A00196445 | Preventive Maintenance, US 67 (SL 306 (W SAN ANGELO) to CHADBOURNE STREET) | San Angelo District | 3 | Reece Albert, Inc. | $20,466,166 | $21,641,672 | +6.0% | -35% | TxDOT |
| A00095081 | Preventive Maintenance, FM 39 (GRIMES COUNTY LINE to US 190) | Bryan District | 5 | Knife River Corporation - South | $18,290,693 | $18,459,645 | +1.0% | +7.0% | TxDOT |
| A00187394 | Seal Coat, US 96 (RE 255, SOUTH to FM 2799) | Beaumont District | 3 | Clark Construction of Texas, Inc. | $13,687,083 | $14,588,710 | +7.0% | -14% | TxDOT |
| A00189861 | Seal Coat, SH 18 (KERMIT LIMITS (SOUTH) to WARD COUNTY LINE) | Odessa District | 1 | Cox Paving of Texas, Inc. | $11,467,507 | -4.0% | TxDOT | ||
| A00189841 | Seal Coat, FM 305 (FM 1901 to CROCKETT COUNTY LINE) | Odessa District | 4 | Ronald R. Wagner & Co., LP | $9,851,071 | $10,199,419 | +4.0% | -9.0% | TxDOT |
| A00187462 | Seal Coat, US 84 (SH 31 to Limestone C/L) | Waco District | 2 | Cox Paving of Texas, Inc. | $9,619,986 | $13,046,969 | +36% | -8.0% | TxDOT |
| A00058987 | Resurface Roadway, SH 199 (Paul Meador Rd/NW Center Dr. to Northside Center) | Fort Worth District | 7 | Foutsco Paving Company, LLC | $8,888,716 | $9,029,405 | +2.0% | -10% | TxDOT |
| A00131524 | Construct Ramps, SH 9 (Old Georgetown Road to BNSF Railway) | Waco District | 3 | Big Creek Construction, LTD. | $7,187,653 | $8,249,567 | +15% | -42% | TxDOT |
| A00189006 | Reconstruct Existing Roadway, SL 12 (US 175 to IH 30) | Dallas District | 6 | Foutsco Paving Company, LLC | $6,104,473 | $6,246,498 | +2.0% | -10% | TxDOT |
| A00187426 | Rehabilitate Existing Roadway, FM 1743 (End of Maintenance to US 82) | Paris District | 4 | A. K. Gillis & Sons, LLC | $5,445,359 | $5,542,767 | +2.0% | -6.0% | TxDOT |
| A00133187 | Resurface Roadway, SH 36 (South of UPRR to South of CR 348) | Houston District | 4 | Durwood Greene Construction Co. | $4,988,997 | $7,212,126 | +45% | -14% | TxDOT |
| A00189763 | Seal Coat, IH 35 (1.1 MI NORTH OF US 83 (WFR) to 0.945 MI NORTH OF CALLAGHAN INTCHG) | Laredo District | 4 | Ronald R. Wagner & Co., LP | $4,828,839 | $5,228,387 | +8.0% | -13% | TxDOT |
| A00211575 | Traffic Signal Improvements, Various (Various Locations to Districtwide) | Dallas District | 4 | American Lighting and Signalization, LLC | $4,816,126 | $4,946,888 | +3.0% | 0.0% | TxDOT |
| A00208985 | Surfacing/Roadway Restoration, US 81 (0.1 miles north of SL 19 to Red River) | Wichita Falls District | 8 | Zack Burkett Co. | $4,768,150 | $4,960,838 | +4.0% | -18% | TxDOT |
| A00210172 | Bridge Maintenance, SH 214 (0.9 miles south of US 60 to On SH 214) | Lubbock District | 10 | Pathfield Investments LLC | $4,197,908 | $4,477,679 | +7.0% | -3.0% | TxDOT |
| A00198123 | Construct Pedestrian Infrastructure, Various (SL 335 to SS 468) | Amarillo District | 5 | L A Fuller & Sons Construction, LTD. | $4,015,191 | $4,485,353 | +12% | -12% | TxDOT |
| A00214744 | ROADWAY WIDENING, FM0145 (Intersection of FM145 & SH194 (Hart) to Castro/Swisher County Line) | Lubbock District | 1 | CK Newberry, LLC | $3,593,324 | +64% | TxDOT | ||
| A00213057 | FLEXIBLE PAVEMENT STRUCTURE REPAIR, IH0010 (District Wide to .) | Yoakum District | 4 | Hunter Industries, LTD. | $2,922,697 | $3,726,891 | +28% | -16% | TxDOT |
| A00213256 | ILLUMINATION MAINTENANCE, IH0610 (Various Highways in Houston District to Various Highways in Houston District) | Houston District | 6 | Lindsey Electric, L.P. | $2,671,630 | $3,397,187 | +27% | -12% | TxDOT |
| A00214887 | HOT-MIX COLD-LAID, US0281 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 5 | Brauntex Materials, Inc. | $2,556,200 | $2,604,600 | +2.0% | -4.0% | TxDOT |
| A00194530 | Bridge Replacement, FM 2610 (FM 2610 to At Menard Creek.) | Lufkin District | 7 | THK Construction LLC | $2,472,737 | $2,486,932 | +1.0% | -1.0% | TxDOT |
| A00199639 | Seal Coat, FM 713 (FM 20 to FM 86) | Austin District | 6 | Lone Star Paving Company | $2,233,729 | $2,266,960 | +1.0% | -21% | TxDOT |
| A00214255 | CRASH CUSHION ATTENUATOR REPAIR, IH0010 (Various Locations in West Harris County to Various Locations in West Harris County) | Houston District | 4 | Rhino Equity, LLC | $1,831,124 | $2,149,600 | +17% | -19% | TxDOT |
| A00043203 | Bridge Replacement, N TRINITY RD (TRINITY ROAD AT COOPER CREEK to IN CITY OF DENTON) | Dallas District | 8 | Skyline Bridge LLC | $1,636,169 | $1,651,972 | +1.0% | -3.0% | TxDOT |
| A00216684 | MILL AND INLAY, IH0020 (VARIOUS to VARIOUS) | Odessa District | 4 | RK Hall, LLC | $1,532,796 | $1,634,481 | +7.0% | -14% | TxDOT |
| A00134791 | Bridge Replacement, COUNTY ROAD 177 (CR 177 at BOGGY CREEK to STR# AA01-32-001) | Yoakum District | 10 | Texas Steel Industrial Placing, LLC | $1,508,380 | $1,566,338 | +4.0% | -3.0% | TxDOT |
| A00215070 | REHABILITATION OF EXISTING ROADWAY, IH0037 (West Frontage RD PR 2024 to CR 1726) | Corpus Christi District | 10 | Hunter Industries, LTD. | $1,459,019 | $1,663,170 | +14% | -23% | TxDOT |
| A00190970 | Bridge Replacement, COUNTY ROAD 18 (CR 18 Drainage Ditch to 0.55MI E of FM 892) | Corpus Christi District | 9 | Presidio Contracting, LLC | $1,410,757 | $1,459,426 | +3.0% | -16% | TxDOT |
| A00197007 | Install/Upgrade Roadway Lighting, SH 249 (BS 249-B to SL 8) | Houston District | 9 | Deco Contractors, Inc. | $1,387,236 | $1,520,643 | +10% | -29% | TxDOT |
| A00065038 | Reconstruct Existing Roadway, FM 113 (OLD MILLSAP ROAD to NORTH OF OLD MILLSAP ROAD) | Fort Worth District | 4 | Jay Mills Contracting, Incorporated | $1,351,259 | $1,409,314 | +4.0% | -2.0% | TxDOT |
| A00213955 | METAL BEAM GUARD FENCE REPAIR, SH0031 (VARIOUS LOCATIONS to ACROSS McLennan, Hill, Limestone & Falls) | Waco District | 6 | Rhino Equity, LLC | $1,102,227 | $1,129,749 | +2.0% | -35% | TxDOT |
| A00193105 | Hazard Elimination & Safety, SS 54 (0.1 Miles West of Bass Pro Drive to 0.1 Miles East of Bass Pro Drive) | Pharr District | 3 | The Levy Company, Inc. | $1,036,985 | $1,165,767 | +12% | +8.0% | TxDOT |
| A00189017 | Rehabilitate Existing Roadway, FM 3486 (FM 986 to SH 34) | Dallas District | 6 | Foutsco Paving Company, LLC | $1,036,225 | $1,051,734 | +1.0% | -21% | TxDOT |
| A00216188 | CLEANING AND SWEEPING HIGHWAYS, FM1764 (VARIOUS HWYS IN GALVESTON COUNTY to VARIOUS HWYS IN GALVESTON COUNTY) | Houston District | 3 | Sweeping Corporation of America, LLC | $997,155 | $1,099,450 | +10% | -18% | TxDOT |
| A00206363 | Construct Pedestrian Infrastructure, Various (Carpenter Street from SH 164 to Bowie to Bowie St from Carpenter to Lumpkin) | Waco District | 6 | Ti-Zack Concrete, LLC | $995,058 | $1,096,957 | +10% | -7.0% | TxDOT |
| A00214314 | TRAFFIC CONTROL SERVICES, SH0146 (VARIOUS HWYS IN GALVESTON COUNTY to VARIOUS HWYS IN GALVESTON COUNTY) | Houston District | 3 | Professional Traffic Control LLC | $981,940 | $1,153,725 | +17% | -4.0% | TxDOT |
| A00212293 | METAL BEAM GUARD FENCE REPAIR, IH0010 (Various locations in West Harris County to Various locations in West Harris County) | Houston District | 4 | Rhino Equity, LLC | $793,130 | $887,430 | +12% | -39% | TxDOT |
| A00192921 | Hazard Elimination & Safety, US 83 (0.3 Miles East of Vanderpool Rd. to Tabasco Rd.) | Pharr District | 9 | Scout 5 Construction LLC | $734,476 | $751,633 | +2.0% | -21% | TxDOT |
| A00193463 | Hazard Elimination & Safety, FM 2854 (Lone Star Elementary to McCaleb Road) | Houston District | 8 | Third Coast Services LLC | $636,099 | $642,270 | +1.0% | -5.0% | TxDOT |
| A00212532 | Hazard Elimination & Safety, IH 35 (Medina/Atascosa CL to Atascosa/Bexar CL) | San Antonio District | 7 | TRP Infrastructure Services, LLC | $582,834 | $617,499 | +6.0% | -83% | TxDOT |
| A00151488 | BRIDGE PREVENTATIVE MAINTENANCE, BU0077X (VARIOUS ROADWAYS to Cameron and Willacy County) | Pharr District | 5 | Rhino Equity, LLC | $487,387 | $585,214 | +20% | -18% | TxDOT |
| A00193473 | Hazard Elimination & Safety, FM 775 (3.2 Mi. West of US 87 to 3.5 Mi. West of US 87) | San Antonio District | 6 | The Levy Company, Inc. | $376,948 | $425,852 | +13% | -30% | TxDOT |
| A00214550 | Bridge Maintenance, US 90 (BEGIN PECOS RIVER BRIDGE to END PECOS RIVER BRIDGE) | Laredo District | 3 | Taylor Bridge LLC | $138,550 | $139,490 | +1.0% | -44% | TxDOT |
| A00212789 | Hazard Elimination & Safety, FM 500 (CR205 to CR211) | Brownwood District | 12 | Twelve Stars Construction Company LLC | $94,590 | $124,414 | +32% | -56% | TxDOT |
| A00211512 | Landscape Development, Various (VARIOUS LOCATION ON SH 31 to AND FM 315) | Tyler District | 5 | Scout 5 Construction LLC | $53,625 | $55,874 | +4.0% | -14% | TxDOT |
| A00212790 | Hazard Elimination & Safety, SH 36 (0.4 MI W. OF FM 587 to CR 274) | Brownwood District | 10 | Twelve Stars Construction Company LLC | $41,785 | $59,307 | +42% | -61% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.