TxDOT contract A00210172 bid tabulation

Bridge Maintenance, SH 214 (0.9 miles south of US 60 to On SH 214). Let by Texas DOT on September 4, 2025, Parmer, Lubbock District. 10 bids received; low bid $4,197,908 by Pathfield Investments LLC, -3.1% against the engineer's estimate of $4,332,214.

Owner
Texas DOT
Letting
04 SEP 2025
Pay items
43
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Pathfield Investments LLC$4,197,908Low-3.0%
2Scott Tucker Construction Company, LLC$4,477,679+7.0%+3.0%
3Ti-Zack Concrete, LLC$4,532,210+8.0%+5.0%
4Silver Creek Construction, Inc.$4,696,702+12%+8.0%
5Gibson & Associates, Inc.$4,909,904+17%+13%
6Ragle Construction, Inc.$4,937,629+18%+14%
7Gilvin-Terrill, LTD.$4,950,089+18%+14%
8Structural Integrity Group LLC$5,184,757+24%+20%
9Built Right Construction of Oklahoma, LLC$6,992,930+67%+61%
10Icos Management, LLC$7,351,760+75%+70%
TxDOT contract A00210172: bids by rank

Engineer's estimate: $4,332,214.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Pathfield Investments LLC2. Scott Tucker Construction Company, LLC3. Ti-Zack Concrete, LLC4. Silver Creek Construction, Inc.5. Gibson & Associates, Inc.6. Ragle Construction, Inc.
1Removing concrete (riprap) (104-7006)SY36$48.00$100.00$66.00$61.60$30.00$140.00$75.00
2Removing concrete (curb) (104-7016)LF3,540$19.00$10.00$4.00$5.60$6.00$9.00$6.00
3Removing concrete (flume) (104-7041)SY40$48.00$90.00$88.00$84.00$30.00$140.00$65.00
4Planing asphalt concrete pavement(3") (354-7052)SY6,640$7.00$5.70$6.00$12.32$8.00$4.61$3.50
5Cem stabil BKFL (400-7010)CY16$285.00$340.00$252.00$728.00$400.00$500.00$175.00
6Class C concrete (crashwall) (420-7050)CY77.60$950.00$1,200.00$1,019.00$728.00$1,175.00$1,540.00$1,400.00
7Class C concrete (rail foundation) (420-7052)CY514$700.00$550.00$490.00$616.00$500.00$649.00$520.00
8Class C concrete (vehicle defl wall) (420-7062)CY63.60$1,710.00$500.00$1,427.00$1,344.00$1,175.00$1,540.00$1,400.00
9Epoxy waterproof finish (type X) (427-7005)SF10,360$10.00$18.00$7.00$19.04$16.00$10.45$7.50
10Concrete structure repair(deck rep(part depth)) (429-7003)SF1,500$143.00$180.00$60.00$140.00$100.00$20.00$30.00
11Concrete structure repair(deck rep (full depth)) (429-7005)SF500$166.00$170.00$160.00$240.80$275.00$50.00$80.00
12Concrete structure repair (vertical & overhead) (429-7007)SF500$190.00$225.00$181.00$164.64$185.00$290.00$150.00
13Riprap (concrete)(5 in) (432-7002)CY30$950.00$540.00$1,092.00$582.40$450.00$990.00$590.00
14Riprap (concrete)(flume) (432-7012)CY10$760.00$760.00$1,943.00$728.00$450.00$1,067.00$755.00
15Polyester polymer concrete overlay (439-7025)CY554$2,850.00$2,300.00$3,456.00$2,912.00$3,437.00$3,200.00$4,300.00
16Rail (type SSTR) (450-7024)LF2,308$110.00$80.00$95.00$140.00$92.00$114.40$65.00
17Retrofit rail (type SSTR) (451-7024)LF2,446$190.00$260.00$185.00$173.60$148.00$187.00$105.00
18Armor joint (sealed) (454-7003)LF882$209.00$165.00$218.00$156.80$375.00$625.00$245.00
19Mobilization (500-7001)LS1$394,000$390,000$447,771$450,000$465,000$562,000$490,000
20Barricades, signs and traffic handling (502-7001)MO10$5,700.00$11,000$5,973.00$1,680.00$8,500.00$10,000$49,000
21Portable changeable message sign (503-7001)DAY540$86.00$120.00$87.00$1.12$35.00$50.00$65.00
22TMA (stationary) (505-7001)DAY306$143.00$210.00$289.00$168.00$150.00$250.00$10.00
23TMA (mobile operation) (505-7003)DAY10$475.00$250.00$494.00$392.00$450.00$250.00$570.00
24Sandbags for erosion control (506-7035)EACH350$12.00$17.00$9.00$11.20$12.00$19.80$12.00
25Biodegradable erosion control logs (install) (12") (506-7044)LF100$7.00$8.00$4.00$16.80$19.00$20.90$7.00
26Biodegradable erosion control logs (remove) (506-7046)LF100$3.00$3.00$1.00$5.60$5.00$5.50$1.00
27Metal W-beam guard fence (steel post) (540-7002)LF100$33.00$40.00$41.00$246.40$45.00$38.50$45.00
28Metal thrie-beam guard fence (steel post) (540-7020)EACH4$2,185.00$600.00$3,509.00$9,520.00$2,600.00$2,420.00$3,200.00
29Remove metal beam guard fence (542-7001)LF3,540$2.60$5.00$2.00$7.84$20.00$3.30$5.00
30Remove terminal anchor section (542-7002)EACH4$285.00$190.00$365.00$2,240.00$300.00$220.00$350.00
31Guardrail end treatment (install) (544-7001)EACH4$2,850.00$3,500.00$3,205.00$8,960.00$3,300.00$3,602.50$3,750.00
32Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014)EACH50$29.00$10.00$38.00$28.00$165.00$49.50$35.00
33Work zone pavement marking removing (W)6"(BKN W/marker) (662-7080)LF1,100$3.00$1.00$5.00$7.28$6.50$4.13$3.75
34Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF2,490$1.00$1.00$2.00$3.36$3.00$1.10$1.00
35Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF2,490$1.00$1.00$2.00$3.36$3.00$1.10$1.00
36Prefabricated PM type C (W)(6")(solid) (668-7080)LF2,490$3.00$7.00$5.00$5.60$5.00$4.73$4.30
37Prefabricated PM type C (Y)(6")(solid) (668-7123)LF2,490$3.00$7.00$5.00$5.60$5.00$4.73$4.30
38Reflectorized pavement marker type II-A-A (672-7004)EACH80$5.00$5.00$11.00$22.40$20.00$6.60$6.00
39Pavement surface preparation for marking (6") (678-7002)LF4,980$1.00$1.00$1.00$2.24$2.00$0.55$0.50
40Full - width mowing (730-7019)CYC1$2,850.00$6,000.00$4,561.00$5,600.00$5,000.00$1,500.00$750.00
41Litter removal (734-7002)CYC1$1,900.00$3,000.00$2,976.00$2,240.00$2,500.00$750.00$750.00
42Concrete beam repair (CFRP) (788-7002)EACH3$6,650.00$11,000$14,701$19,040$2,500.00$5,000.00$5,000.00
43Concrete beam rep(strand splice & CFRP) (788-7003)EACH1$14,250$20,000$37,418$24,640$10,000$9,000.00$20,000
TxDOT contract A00210172: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of September 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy