Silver Creek Construction, Inc.: TxDOT bid record

Silver Creek Construction, Inc. submitted 45 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 04 NOV 2026, and was the low bidder on 6 of them (13%). When it was not low, its total sat a median +22% above the low bid.

Owner
Texas DOT
Low bid volume
$21,803,655
Latest bid
04 NOV 2026
Data through
19 NOV 2026
45Bids
6Low bids
13Win rate, percent
+22%Median gap to the low bid when not low, 39 bids

By year

YearBidsLow bidsWin rate
20204250%
202110220%
2022600%
20235120%
2024100%
20251400%
20265120%
Silver Creek Construction, Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Dallas District16425%
Fort Worth District9111%
Wichita Falls District400%
Lubbock District400%
Atlanta District3133%
Paris District200%
Childress District200%
Amarillo District100%
Odessa District100%
Bryan District100%
Abilene District100%
Waco District100%
Silver Creek Construction, Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Biodegradable erosion control logs (remove)506-7046LF2613 (50%)$1.00$1.40
Biodegradable erosion control logs (install) (12")506-7044LF198 (42%)$5.00$6.00
Reflectorized pavement marking type I (W)8"(solid)(100MIL)666-7024LF96 (67%)$0.87$1.10
TMA (stationary)505-7001DAY445 (11%)$235.00$230.00
Pavement surface preparation for marking (8")678-7004LF95 (56%)$0.18$0.20
Pavement surface preparation for marking (24")678-7008LF85 (63%)$0.78$1.00
Reflectorized pavement marking type I (W)(arrow)(100MIL)666-7042EACH65 (83%)$132.50$165.00
Reflectorized pavement marking type I (W)(word)(100MIL)666-7066EACH65 (83%)$162.50$193.00
Riprap (mow strip)(4 in)432-7013CY134 (31%)$457.18$643.00
Remove metal beam guard fence542-7001LF104 (40%)$2.00$3.00
Pavement surface preparation for marking (word)678-7016EACH84 (50%)$19.00$20.00
Reflectorized pavement marker type II-A-A672-7004EACH74 (57%)$4.00$5.00
Silver Creek Construction, Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Silver Creek Construction, Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 NOV 2026A00222905Fort Worth DistrictWiden Road - Add Lanes And Shoulders, SH 114 (At Alliance Blvd to .)5 of 7$649,060+35%
03 SEP 2026A00220226Fort Worth DistrictSurfacing/Roadway Restoration, SH 360 (Arkansas Ln to SH 180)4 of 6$5,120,757+12%
05 AUG 2026A00219255Fort Worth DistrictHazard Elimination & Safety, US 81 (South of CR 4228 to Tarrant County Line)5 of 5$1,539,472+24%
06 JAN 2026A00193318Fort Worth DistrictTransportation Non-Roadway, IH 35W (Luella Bridge to 0.2 mi S of Altamesa Bridge)8 of 9$5,712,079+48%
06 JAN 2026A00215390Atlanta DistrictSurfacing/Roadway Restoration, US 59 (SH 155 to Marion C/L)1 of 5$7,736,641Low, 15% under the second
03 DEC 2025A00207988Lubbock DistrictRehabilitate Existing Roadway, Various (VARIOUS LOCATIONS IN to On IH 27 in Hale County)3 of 3$2,689,358+21%
02 DEC 2025A00217303Dallas DistrictFULL DEPTH CONCRETE REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section)8 of 8$2,446,985+43%
05 NOV 2025A00187771Dallas DistrictResurface Roadway, SS 557 (US 80 to IH 20)6 of 8$10,062,413+22%
09 OCT 2025A00209316Dallas DistrictRepair Roadway, US 75 (Grayson County Line to Valley Creek Trail)2 of 6$2,748,675+5.0%
08 OCT 2025A00216261Dallas DistrictBRIDGE SCOUR REPAIR, US 175 (US 175 to At Prairie Creek)12 of 15$1,827,814+84%
05 SEP 2025A00216376Waco DistrictPreventive Maintenance, Various (Various locations IH 35 @ Sun Valley Blv to Various locations IH 35 SL363)2 of 9$2,839,861+1.0%
04 SEP 2025A00210172Lubbock DistrictBridge Maintenance, SH 214 (0.9 miles south of US 60 to On SH 214)4 of 10$4,696,702+12%
08 AUG 2025A00184262Lubbock DistrictHazard Elimination & Safety, US 62 (Hockley County Line to 73rd St in Lubbock)6 of 7$3,547,892+31%
08 AUG 2025A00184857Dallas DistrictTraffic Signal Improvements, SH 289 (E Broadway ST to FM 455 in Collin)5 of 7$2,832,176+23%
02 JUL 2025A00195782Dallas DistrictRehabilitate Existing Roadway, FM 544 (Heritage Parkway to SH 78)5 of 6$1,099,703+30%
01 JUL 2025A00215430Wichita Falls DistrictFULL DEPTH CONCRETE REPAIR, US0082 (Various Counties to Wichita Falls District)3 of 3$2,416,200+13%
01 JUL 2025A00205962Dallas DistrictBridge Maintenance, US 67 (US 67 SB at Wheatland Road to .)4 of 6$6,511,605+32%
05 MAR 2025A00207986Lubbock DistrictRehabilitate Existing Roadway, Various (Various locations to On IH 27 in Lubbock County)2 of 5$2,590,965+18%
06 FEB 2025A00209377Dallas DistrictRepair Roadway, FM 2499 (FM 1171 to Tarrant County Line)3 of 6$2,366,239+23%
05 JUN 202406243018Fort Worth DistrictUS 81 Highway improvement from FM 1655 to US 380F5 of 5$7,622,449+29%
03 AUG 202308233239Wichita Falls DistrictUS 81 Hazard elimination & safety from WAGONSELLER RD to 0.25 MI S OF SS 5114 of 4$2,737,073+22%
02 AUG 202308233022Fort Worth DistrictUS 380 Hazard elimination & safety from .300 MI EAST OF SH 101 to BU 380F1 of 5$5,064,956Low, 20% under the second
02 AUG 202308233026Fort Worth DistrictUS 81 Construct rest area from AT 4.2 MI N. OF DECTAUR4 of 6$2,720,539+19%
27 JUN 202306233442Fort Worth DistrictUS 281 Hazard elimination & safety from US 380 to SH 1993 of 5$1,580,992+21%
07 MAR 202303233010Childress DistrictIH 40 Hazard elimination & safety from CR 18, EAST to OKLAHOMA STATE LINE3 of 6$3,923,430+5.0%
Silver Creek Construction, Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.