Silver Creek Construction, Inc.: TxDOT bid record
Silver Creek Construction, Inc. submitted 45 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 04 NOV 2026, and was the low bidder on 6 of them (13%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $21,803,655
- Latest bid
- 04 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 2 | 50% |
| 2021 | 10 | 2 | 20% |
| 2022 | 6 | 0 | 0% |
| 2023 | 5 | 1 | 20% |
| 2024 | 1 | 0 | 0% |
| 2025 | 14 | 0 | 0% |
| 2026 | 5 | 1 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 16 | 4 | 25% |
| Fort Worth District | 9 | 1 | 11% |
| Wichita Falls District | 4 | 0 | 0% |
| Lubbock District | 4 | 0 | 0% |
| Atlanta District | 3 | 1 | 33% |
| Paris District | 2 | 0 | 0% |
| Childress District | 2 | 0 | 0% |
| Amarillo District | 1 | 0 | 0% |
| Odessa District | 1 | 0 | 0% |
| Bryan District | 1 | 0 | 0% |
| Abilene District | 1 | 0 | 0% |
| Waco District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 26 | 13 (50%) | $1.00 | $1.40 |
| Biodegradable erosion control logs (install) (12") | 506-7044 | LF | 19 | 8 (42%) | $5.00 | $6.00 |
| Reflectorized pavement marking type I (W)8"(solid)(100MIL) | 666-7024 | LF | 9 | 6 (67%) | $0.87 | $1.10 |
| TMA (stationary) | 505-7001 | DAY | 44 | 5 (11%) | $235.00 | $230.00 |
| Pavement surface preparation for marking (8") | 678-7004 | LF | 9 | 5 (56%) | $0.18 | $0.20 |
| Pavement surface preparation for marking (24") | 678-7008 | LF | 8 | 5 (63%) | $0.78 | $1.00 |
| Reflectorized pavement marking type I (W)(arrow)(100MIL) | 666-7042 | EACH | 6 | 5 (83%) | $132.50 | $165.00 |
| Reflectorized pavement marking type I (W)(word)(100MIL) | 666-7066 | EACH | 6 | 5 (83%) | $162.50 | $193.00 |
| Riprap (mow strip)(4 in) | 432-7013 | CY | 13 | 4 (31%) | $457.18 | $643.00 |
| Remove metal beam guard fence | 542-7001 | LF | 10 | 4 (40%) | $2.00 | $3.00 |
| Pavement surface preparation for marking (word) | 678-7016 | EACH | 8 | 4 (50%) | $19.00 | $20.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 7 | 4 (57%) | $4.00 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| O. Trevino Construction, LLC | 24 | 18 of 24 |
| Gibson & Associates, Inc. | 13 | 7 of 13 |
| FNH Construction, LLC | 12 | 2 of 12 |
| SCR Civil Construction, LLC | 11 | 5 of 11 |
| Built Right Construction of Oklahoma, LLC | 10 | 4 of 10 |
| Grey Sky Construction LLC | 9 | 1 of 9 |
| Gratiot Construction, LTD. | 8 | 7 of 8 |
| Garret Shields Infrastructure | 8 | 4 of 8 |
| Roy Jorgensen Associates, Inc. | 7 | 4 of 7 |
| Ragle Construction, Inc. | 7 | 5 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 NOV 2026 | A00222905 | Fort Worth District | Widen Road - Add Lanes And Shoulders, SH 114 (At Alliance Blvd to .) | 5 of 7 | $649,060 | +35% |
| 03 SEP 2026 | A00220226 | Fort Worth District | Surfacing/Roadway Restoration, SH 360 (Arkansas Ln to SH 180) | 4 of 6 | $5,120,757 | +12% |
| 05 AUG 2026 | A00219255 | Fort Worth District | Hazard Elimination & Safety, US 81 (South of CR 4228 to Tarrant County Line) | 5 of 5 | $1,539,472 | +24% |
| 06 JAN 2026 | A00193318 | Fort Worth District | Transportation Non-Roadway, IH 35W (Luella Bridge to 0.2 mi S of Altamesa Bridge) | 8 of 9 | $5,712,079 | +48% |
| 06 JAN 2026 | A00215390 | Atlanta District | Surfacing/Roadway Restoration, US 59 (SH 155 to Marion C/L) | 1 of 5 | $7,736,641 | Low, 15% under the second |
| 03 DEC 2025 | A00207988 | Lubbock District | Rehabilitate Existing Roadway, Various (VARIOUS LOCATIONS IN to On IH 27 in Hale County) | 3 of 3 | $2,689,358 | +21% |
| 02 DEC 2025 | A00217303 | Dallas District | FULL DEPTH CONCRETE REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section) | 8 of 8 | $2,446,985 | +43% |
| 05 NOV 2025 | A00187771 | Dallas District | Resurface Roadway, SS 557 (US 80 to IH 20) | 6 of 8 | $10,062,413 | +22% |
| 09 OCT 2025 | A00209316 | Dallas District | Repair Roadway, US 75 (Grayson County Line to Valley Creek Trail) | 2 of 6 | $2,748,675 | +5.0% |
| 08 OCT 2025 | A00216261 | Dallas District | BRIDGE SCOUR REPAIR, US 175 (US 175 to At Prairie Creek) | 12 of 15 | $1,827,814 | +84% |
| 05 SEP 2025 | A00216376 | Waco District | Preventive Maintenance, Various (Various locations IH 35 @ Sun Valley Blv to Various locations IH 35 SL363) | 2 of 9 | $2,839,861 | +1.0% |
| 04 SEP 2025 | A00210172 | Lubbock District | Bridge Maintenance, SH 214 (0.9 miles south of US 60 to On SH 214) | 4 of 10 | $4,696,702 | +12% |
| 08 AUG 2025 | A00184262 | Lubbock District | Hazard Elimination & Safety, US 62 (Hockley County Line to 73rd St in Lubbock) | 6 of 7 | $3,547,892 | +31% |
| 08 AUG 2025 | A00184857 | Dallas District | Traffic Signal Improvements, SH 289 (E Broadway ST to FM 455 in Collin) | 5 of 7 | $2,832,176 | +23% |
| 02 JUL 2025 | A00195782 | Dallas District | Rehabilitate Existing Roadway, FM 544 (Heritage Parkway to SH 78) | 5 of 6 | $1,099,703 | +30% |
| 01 JUL 2025 | A00215430 | Wichita Falls District | FULL DEPTH CONCRETE REPAIR, US0082 (Various Counties to Wichita Falls District) | 3 of 3 | $2,416,200 | +13% |
| 01 JUL 2025 | A00205962 | Dallas District | Bridge Maintenance, US 67 (US 67 SB at Wheatland Road to .) | 4 of 6 | $6,511,605 | +32% |
| 05 MAR 2025 | A00207986 | Lubbock District | Rehabilitate Existing Roadway, Various (Various locations to On IH 27 in Lubbock County) | 2 of 5 | $2,590,965 | +18% |
| 06 FEB 2025 | A00209377 | Dallas District | Repair Roadway, FM 2499 (FM 1171 to Tarrant County Line) | 3 of 6 | $2,366,239 | +23% |
| 05 JUN 2024 | 06243018 | Fort Worth District | US 81 Highway improvement from FM 1655 to US 380F | 5 of 5 | $7,622,449 | +29% |
| 03 AUG 2023 | 08233239 | Wichita Falls District | US 81 Hazard elimination & safety from WAGONSELLER RD to 0.25 MI S OF SS 511 | 4 of 4 | $2,737,073 | +22% |
| 02 AUG 2023 | 08233022 | Fort Worth District | US 380 Hazard elimination & safety from .300 MI EAST OF SH 101 to BU 380F | 1 of 5 | $5,064,956 | Low, 20% under the second |
| 02 AUG 2023 | 08233026 | Fort Worth District | US 81 Construct rest area from AT 4.2 MI N. OF DECTAUR | 4 of 6 | $2,720,539 | +19% |
| 27 JUN 2023 | 06233442 | Fort Worth District | US 281 Hazard elimination & safety from US 380 to SH 199 | 3 of 5 | $1,580,992 | +21% |
| 07 MAR 2023 | 03233010 | Childress District | IH 40 Hazard elimination & safety from CR 18, EAST to OKLAHOMA STATE LINE | 3 of 6 | $3,923,430 | +5.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.