TxDOT contract A00184857 bid tabulation
Traffic Signal Improvements, SH 289 (E Broadway ST to FM 455 in Collin). Let by Texas DOT on August 8, 2025, Collin, Dallas District. 7 bids received; low bid $2,298,355 by O. Trevino Construction, LLC, -17% against the engineer's estimate of $2,759,900.
- Owner
- Texas DOT
- Letting
- 08 AUG 2025
- Pay items
- 77
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | O. Trevino Construction, LLC | $2,298,355 | Low | -17% |
| 2 | Ed Bell Construction Company | $2,594,888 | +13% | -6.0% |
| 3 | Ragle Construction, Inc. | $2,727,402 | +19% | -1.0% |
| 4 | Grey Sky Construction LLC | $2,774,084 | +21% | +1.0% |
| 5 | Silver Creek Construction, Inc. | $2,832,176 | +23% | +3.0% |
| 6 | American Lighting and Signalization, LLC | $3,451,072 | +50% | +25% |
| 7 | Built Right Construction of Oklahoma, LLC | $4,642,864 | +102% | +68% |
Engineer's estimate: $2,759,900.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. O. Trevino Construction, LLC | 2. Ed Bell Construction Company | 3. Ragle Construction, Inc. | 4. Grey Sky Construction LLC | 5. Silver Creek Construction, Inc. | 6. American Lighting and Signalization, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 44.30 | $750.00 | $870.00 | $3,150.00 | $7,300.00 | $5,000.00 | $1,200.00 | $1,207.15 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 528 | $70.00 | $52.00 | $25.00 | $25.00 | $20.00 | $60.00 | $59.30 |
| 3 | Removing concrete (curb) (104-7016) | LF | 4,745 | $20.00 | $3.50 | $0.75 | $1.10 | $20.00 | $20.00 | $25.41 |
| 4 | Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001) | SY | 528 | $20.00 | $60.00 | $18.00 | $7.30 | $20.00 | $48.00 | $14.12 |
| 5 | Excavation (roadway) (110-7001) | CY | 3,317 | $40.00 | $26.00 | $25.00 | $38.60 | $20.00 | $40.00 | $60.71 |
| 6 | Compost manuf topsoil (4") (161-7002) | SY | 2,066 | $2.00 | $6.25 | $8.00 | $2.50 | $6.00 | $10.00 | $4.92 |
| 7 | Block sodding (162-7002) | SY | 2,066 | $5.00 | $5.75 | $6.00 | $15.00 | $6.00 | $6.00 | $5.86 |
| 8 | Vegetative watering (168-7001) | TGL | 309 | $10.00 | $44.00 | $1.05 | $32.00 | $10.00 | $55.00 | $3.49 |
| 9 | Lime (com or QK)(slurry) (260-7005) | TON | 113 | $400.00 | $330.50 | $325.00 | $317.00 | $400.00 | $500.00 | $494.15 |
| 10 | Lime TRT (existing material)(8") (260-7007) | SY | 2,224 | $15.00 | $23.00 | $21.00 | $30.00 | $12.00 | $37.00 | $22.59 |
| 11 | SP mixes SP-B PG64-22 (344-7001) | TON | 1,607 | $145.00 | $150.00 | $150.00 | $132.00 | $145.00 | $175.00 | $218.83 |
| 12 | Tack coat (344-7077) | GAL | 798 | $5.00 | $7.50 | $0.01 | $7.60 | $5.00 | $2.00 | $2.12 |
| 13 | Concrete pavement (CRCP) (8") (360-7002) | SY | 6,632 | $110.00 | $90.00 | $100.00 | $85.00 | $85.00 | $115.00 | $190.60 |
| 14 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 152 | $325.00 | $275.00 | $279.46 | $300.00 | $350.00 | $300.00 | $466.34 |
| 15 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 88 | $800.00 | $512.00 | $521.00 | $725.00 | $650.00 | $550.00 | $899.21 |
| 16 | Mobilization (500-7001) | LS | 1 | $250,900 | $200,000 | $260,000 | $273,000 | $250,000 | $283,000 | $263,020 |
| 17 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $20,000 | $13,500 | $27,000 | $45,000 | $8,500.00 | $12,500 | $2,228.85 |
| 18 | Portable changeable message sign (503-7002) | EACH | 2 | $20,000 | $8,000.00 | $7,500.00 | $7,650.00 | $20,000 | $12,500 | $282.42 |
| 19 | TMA (stationary) (505-7001) | DAY | 94 | $250.00 | $170.00 | $900.00 | $346.00 | $250.00 | $200.00 | $342.99 |
| 20 | TMA (mobile operation) (505-7002) | HR | 94 | $130.00 | $60.50 | $100.00 | $67.50 | $55.00 | $70.00 | $342.99 |
| 21 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 809 | $4.00 | $4.00 | $10.00 | $5.75 | $12.00 | $6.00 | $9.26 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 809 | $0.75 | $1.00 | $5.00 | $1.25 | $6.00 | $2.00 | $3.81 |
| 23 | Concrete curb (mono) (type II) (529-7007) | LF | 4,236 | $30.00 | $6.00 | $6.00 | $9.20 | $14.00 | $11.00 | $11.29 |
| 24 | Concrete median (536-7002) | SY | 684 | $180.00 | $84.00 | $100.00 | $59.00 | $125.00 | $100.00 | $127.07 |
| 25 | Concrete median (mono nose) (536-7006) | SY | 41 | $225.00 | $350.00 | $200.00 | $127.50 | $150.00 | $200.00 | $204.72 |
| 26 | Relocate RD IL asm (trans-base) (610-7004) | EACH | 19 | $2,000.00 | $4,430.00 | $3,323.05 | $2,800.00 | $3,500.00 | $3,500.00 | $4,531.54 |
| 27 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 3,650 | $20.00 | $19.00 | $18.90 | $17.00 | $20.00 | $20.00 | $25.55 |
| 28 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 680 | $50.00 | $28.00 | $28.44 | $32.00 | $50.00 | $30.00 | $32.47 |
| 29 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 90 | $20.00 | $20.50 | $20.77 | $19.00 | $30.00 | $22.00 | $32.05 |
| 30 | Conduit (prepare) (618-7090) | LF | 620 | $10.00 | $18.00 | $18.27 | $3.00 | $10.00 | $20.00 | $4.66 |
| 31 | Electrical conductor (no.12) insulated (620-7004) | LF | 240 | $3.00 | $2.50 | $2.45 | $1.85 | $3.00 | $2.50 | $3.22 |
| 32 | Electrical conductor (no.8) insulated (620-7008) | LF | 130 | $3.00 | $3.20 | $3.25 | $2.25 | $3.00 | $3.50 | $3.90 |
| 33 | Electrical conductor (no.6) bare (620-7009) | LF | 4,480 | $5.00 | $3.15 | $3.20 | $2.65 | $3.00 | $3.50 | $3.90 |
| 34 | Electrical conductor (no.6) insulated (620-7010) | LF | 8,780 | $4.00 | $3.80 | $3.87 | $2.75 | $3.00 | $4.00 | $4.24 |
| 35 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 430 | $5.00 | $4.50 | $4.52 | $3.25 | $3.00 | $4.75 | $6.96 |
| 36 | Remove ground box (624-7013) | EACH | 1 | $2,000.00 | $170.00 | $168.34 | $650.00 | $150.00 | $175.00 | $861.63 |
| 37 | Aluminum signs (type A) (636-7001) | SF | 28.50 | $50.00 | $39.00 | $39.11 | $35.00 | $40.00 | $42.00 | $80.46 |
| 38 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $800.00 | $900.00 | $1,000.00 | $850.00 | $1,100.00 | $1,600.00 | $1,787.68 |
| 39 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 6,444 | $2.50 | $0.95 | $0.95 | $0.90 | $4.00 | $1.05 | $1.27 |
| 40 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 1,991 | $4.50 | $3.25 | $3.18 | $3.00 | $6.00 | $2.25 | $4.24 |
| 41 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 358 | $1.00 | $6.77 | $6.89 | $6.50 | $20.00 | $7.75 | $9.18 |
| 42 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 12 | $130.00 | $198.00 | $201.40 | $190.00 | $250.00 | $165.00 | $268.26 |
| 43 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 12 | $150.00 | $248.00 | $243.80 | $230.00 | $250.00 | $220.00 | $324.73 |
| 44 | Pavement sler 6" (666-7347) | LF | 4,746 | $1.50 | $0.25 | $0.21 | $0.20 | $1.00 | $0.25 | $0.28 |
| 45 | Pavement sler 8" (666-7348) | LF | 6,444 | $1.00 | $0.25 | $0.21 | $0.20 | $4.00 | $0.33 | $0.28 |
| 46 | Pavement sler 12" (666-7350) | LF | 1,991 | $3.00 | $0.50 | $0.42 | $0.40 | $6.00 | $1.00 | $0.56 |
| 47 | Pavement sler 24" (666-7352) | LF | 358 | $16.00 | $0.55 | $0.53 | $0.50 | $20.00 | $2.00 | $0.71 |
| 48 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 4,746 | $1.00 | $0.63 | $0.64 | $0.60 | $1.00 | $0.83 | $0.85 |
| 49 | Eliminating existing PM & markers (6") (677-7002) | LF | 4,746 | $1.00 | $0.55 | $0.53 | $0.50 | $1.00 | $0.60 | $0.71 |
| 50 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,413 | $1.00 | $0.68 | $0.69 | $0.65 | $6.00 | $0.80 | $0.92 |
| 51 | Eliminating existing PM & markers (24") (677-7008) | LF | 270 | $3.00 | $4.00 | $3.71 | $3.50 | $20.00 | $4.25 | $4.94 |
| 52 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 10 | $65.00 | $60.00 | $58.30 | $55.00 | $250.00 | $100.00 | $77.65 |
| 53 | Eliminating existing PM & markers (word) (677-7015) | EACH | 10 | $60.00 | $60.00 | $58.30 | $55.00 | $250.00 | $110.00 | $77.65 |
| 54 | Pavement surface preparation for marking (6") (678-7002) | LF | 4,746 | $0.50 | $0.05 | $0.05 | $0.05 | $1.00 | $0.20 | $0.07 |
| 55 | Pavement surface preparation for marking (8") (678-7004) | LF | 6,444 | $0.10 | $0.10 | $0.07 | $0.07 | $4.00 | $0.40 | $0.10 |
| 56 | Pavement surface preparation for marking (12") (678-7006) | LF | 1,991 | $0.20 | $0.15 | $0.11 | $0.10 | $6.00 | $0.75 | $0.14 |
| 57 | Pavement surface preparation for marking (24") (678-7008) | LF | 358 | $1.00 | $0.25 | $0.21 | $0.20 | $20.00 | $1.50 | $0.28 |
| 58 | Install highway traffic signal (upgrade) (680-7011) | EACH | 2 | $6,500.00 | $50,000 | $50,250 | $45,000 | $50,000 | $50,000 | $36,472 |
| 59 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 8 | $600.00 | $335.00 | $338.00 | $450.00 | $350.00 | $350.00 | $433.55 |
| 60 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 6 | $370.00 | $335.00 | $343.77 | $450.00 | $350.00 | $350.00 | $433.55 |
| 61 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 8 | $360.00 | $335.00 | $338.00 | $450.00 | $350.00 | $350.00 | $433.55 |
| 62 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 12 | $370.00 | $335.00 | $343.77 | $450.00 | $350.00 | $350.00 | $433.55 |
| 63 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $360.00 | $335.00 | $338.00 | $450.00 | $350.00 | $350.00 | $433.55 |
| 64 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 12 | $375.00 | $335.00 | $343.77 | $450.00 | $350.00 | $350.00 | $433.55 |
| 65 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 8 | $350.00 | $181.00 | $184.97 | $225.00 | $200.00 | $200.00 | $310.98 |
| 66 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 6 | $620.00 | $269.00 | $272.95 | $375.00 | $250.00 | $300.00 | $331.41 |
| 67 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 400 | $3.50 | $3.50 | $3.47 | $2.50 | $3.00 | $3.50 | $6.96 |
| 68 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 480 | $3.00 | $4.00 | $3.96 | $3.00 | $3.00 | $4.00 | $6.96 |
| 69 | Traffic signal CBL (type A)(14 AWG)(12 conductor) (684-7038) | LF | 385 | $5.00 | $6.50 | $6.39 | $5.50 | $3.00 | $6.50 | $8.32 |
| 70 | Traffic signal CBL (type A)(14 AWG)(16 conductor) (684-7042) | LF | 340 | $15.00 | $8.00 | $7.71 | $6.00 | $3.00 | $8.00 | $9.00 |
| 71 | Ins traffic signal PL AM(S)1 arm(60')lum (686-7063) | EACH | 2 | $44,000 | $46,000 | $46,722 | $36,500 | $55,000 | $50,000 | $43,574 |
| 72 | Ins traffic signal PL AM(S)1 arm(65')ilsn (686-7066) | EACH | 1 | $44,000 | $44,500 | $45,051 | $42,500 | $60,000 | $46,000 | $44,936 |
| 73 | Ins traffic signal PL AM(S)1 arm(65')lum&ilsn (686-7068) | EACH | 1 | $46,000 | $48,000 | $48,682 | $44,500 | $65,000 | $50,000 | $48,000 |
| 74 | Remove traffic signal PL (686-7313) | EACH | 4 | $3,500.00 | $4,300.00 | $2,545.41 | $2,200.00 | $3,500.00 | $2,800.00 | $2,881.14 |
| 75 | Removal of signal head assembly (690-7024) | EACH | 13 | $400.00 | $240.00 | $241.64 | $150.00 | $250.00 | $250.00 | $678.01 |
| 76 | Relocate RVDS (6008-7007) | EACH | 7 | $1,800.00 | $740.00 | $747.94 | $1,800.00 | $5,000.00 | $800.00 | $1,189.43 |
| 77 | Ground box (prepare) (6013-7006) | EACH | 7 | $1,250.00 | $1,000.00 | $1,009.94 | $650.00 | $500.00 | $1,000.00 | $789.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 8, 2025. Compiled by Mirage Metrics.