American Lighting and Signalization, LLC: TxDOT bid record
American Lighting and Signalization, LLC submitted 92 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 12 NOV 2026, and was the low bidder on 22 of them (24%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $31,354,027
- Latest bid
- 12 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 28 | 5 | 18% |
| 2021 | 32 | 9 | 28% |
| 2022 | 1 | 1 | 100% |
| 2024 | 7 | 1 | 14% |
| 2025 | 12 | 3 | 25% |
| 2026 | 12 | 3 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 28 | 5 | 18% |
| Fort Worth District | 12 | 8 | 67% |
| Atlanta District | 5 | 0 | 0% |
| Paris District | 5 | 1 | 20% |
| Odessa District | 5 | 0 | 0% |
| Waco District | 5 | 1 | 20% |
| Lubbock District | 5 | 2 | 40% |
| Austin District | 4 | 0 | 0% |
| Wichita Falls District | 4 | 1 | 25% |
| Amarillo District | 4 | 2 | 50% |
| Abilene District | 3 | 0 | 0% |
| Brownwood District | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 77 | 29 (38%) | $4,727.25 | $5,000.00 |
| TMA (stationary) | 505-7001 | DAY | 82 | 25 (30%) | $233.06 | $230.00 |
| Portable changeable message sign | 503-7001 | DAY | 40 | 24 (60%) | $77.09 | $100.00 |
| Electrical conductor (no.6) bare | 620-7009 | LF | 57 | 15 (26%) | $2.07 | $2.10 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 43 | 15 (35%) | $1.35 | $1.40 |
| Electrical conductor (no.8) bare | 620-7007 | LF | 30 | 12 (40%) | $1.69 | $1.92 |
| Electrical conductor (no.8) insulated | 620-7008 | LF | 48 | 11 (23%) | $2.20 | $2.00 |
| Biodegradable erosion control logs (install) (18") | 506-7045 | LF | 30 | 11 (37%) | $3.80 | $7.90 |
| Pavement surface preparation for marking (24") | 678-7008 | LF | 26 | 10 (38%) | $0.73 | $1.00 |
| Conduit (PVC) (schedule 40) (2") (bore) | 618-7031 | LF | 28 | 9 (32%) | $26.23 | $28.75 |
| Eliminating existing pavement marking & markers (24") | 677-6007 | LF | 19 | 9 (47%) | $3.45 | $3.50 |
| Electrical conductor (no.6) insulated | 620-7010 | LF | 57 | 8 (14%) | $2.69 | $2.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Highway Intelligent Traffic Solutions, Inc. | 37 | 15 of 37 |
| Durable Specialties, Inc. | 27 | 10 of 27 |
| WG Engineering & Construction, LLC | 19 | 7 of 19 |
| Mica Corporation | 17 | 6 of 17 |
| Yunex LLC | 16 | 6 of 16 |
| Select Maintenance, L.L.C. | 14 | 5 of 14 |
| Vaca Underground Utilities Inc | 12 | 10 of 12 |
| Siemens Mobility, Inc. | 11 | 4 of 11 |
| FNH Construction, LLC | 11 | 1 of 11 |
| Willis Electric Co., LP | 10 | 9 of 10 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | A00222829 | Dallas District | ILLUMINATION MAINTENANCE, IH0030 (Various Roadways in the to Dallas District) | 3 of 5 | $900,000 | +14% |
| 06 OCT 2026 | A00222422 | Dallas District | LARGE SIGN REPLACEMENT, US0080 (Various Roadways in the to Dallas District) | 3 of 4 | $4,100,000 | +10% |
| 09 SEP 2026 | A00219480 | Dallas District | ROW Traffic Materials, IH0030 (Dallas to County) | 1 of 1 | $220,100 | Low |
| 03 SEP 2026 | A00208481 | Dallas District | Install/Rehabilitate Its, US 75 (Wilson Creek to Exchange Parkway) | 5 of 7 | $3,075,000 | +8.0% |
| 03 SEP 2026 | A00198323 | Dallas District | Install Traffic Signal, Various (Various Locations to In the Dallas District) | 1 of 8 | $4,190,000 | Low, 1.0% under the second |
| 05 AUG 2026 | A00210758 | San Angelo District | Install Traffic Signal, AVE N (At Ben Flicklin Rd to -) | 3 of 3 | $800,000 | +36% |
| 02 JUL 2026 | A00220099 | Dallas District | TRAFFIC SIGNAL MAINTENANCE, IH0030 (Various Roadways in the to Dallas District) | 1 of 4 | $1,600,000 | Low, 2.0% under the second |
| 03 JUN 2026 | A00206422 | Dallas District | Install Traffic Signal, Various (Various Locations to in the Town of Addison) | 5 of 5 | $560,000 | +58% |
| 03 JUN 2026 | A00213348 | Tyler District | Install Illumination, Various (VARIOUS LOCATIONS IN to TYLER DISTRICT) | 10 of 11 | $795,000 | +41% |
| 02 JUN 2026 | A00193278 | Dallas District | Traffic Signal Improvements, IH 30 (at Cockrell Hill to in the City of Dallas) | 4 of 9 | $2,075,000 | +34% |
| 07 APR 2026 | A00193312 | Dallas District | Traffic Signal Improvements, SH 289 (SL 12 to McCallum) | 4 of 9 | $2,750,000 | +9.0% |
| 05 MAR 2026 | A00193765 | Dallas District | Traffic Signal Improvements, SH 352 (at Galloway Ave to in the City of Mesquite) | 3 of 8 | $2,200,000 | +38% |
| 17 DEC 2025 | A00217753 | Fort Worth District | TRAFFIC SIGNAL MAINTENANCE, IH0020 (VARIOUS LOCATIONS WITHIN to Tarrant County) | 1 of 1 | $999,000 | Low |
| 17 DEC 2025 | A00218552 | Fort Worth District | TRAFFIC SIGNAL MAINTENANCE, IH0020 (VARIOUS LOCATIONS WITHIN to FORT WORTH DISTRICT) | 1 of 2 | $361,500 | Low, 31% under the second |
| 17 DEC 2025 | A00218276 | Fort Worth District | TRAFFIC SIGNAL MAINTENANCE, IH0020 (VARIOUS LOCATIONS WITHIN to FORT WORTH DISTRICT) | 2 of 2 | $527,750 | +11% |
| 10 DEC 2025 | A00217794 | Dallas District | ROW Traffic Materials, IH0035E (Dallas to DIstrict) | 2 of 2 | $499,998 | +11% |
| 20 NOV 2025 | A00217878 | Paris District | ILLUMINATION MAINTENANCE, US0082 (Various locations in to Paris District) | 2 of 3 | $551,715 | +13% |
| 06 NOV 2025 | A00193385 | Dallas District | Traffic Signal Improvements, SH 342 (at SL 12 (Ledbetter) to in the City of Dallas) | 3 of 8 | $3,780,000 | +45% |
| 09 OCT 2025 | A00193451 | Dallas District | Install Traffic Signal, US 380 (at THOMAS J EGAN RD to in the City of Denton) | 5 of 6 | $3,674,955 | +18% |
| 04 SEP 2025 | A00211575 | Dallas District | Traffic Signal Improvements, Various (Various Locations to Districtwide) | 1 of 4 | $4,816,126 | Low, 3.0% under the second |
| 08 AUG 2025 | A00184857 | Dallas District | Traffic Signal Improvements, SH 289 (E Broadway ST to FM 455 in Collin) | 6 of 7 | $3,451,072 | +50% |
| 04 JUN 2025 | A00184778 | Dallas District | Traffic Signal Improvements, SL 12 (At Peavy to In the City of Dallas) | 4 of 6 | $4,715,321 | +12% |
| 02 MAY 2025 | A00212930 | Dallas District | Install Traffic Signal, SL 12 (South of John West to Tillman Street) | 5 of 5 | $4,193,636 | +35% |
| 01 MAY 2025 | A00193674 | Dallas District | Traffic Signal Improvements, SH 180 (Bagdad Road to MacArthur Boulevard) | 2 of 4 | $2,556,737 | +8.0% |
| 06 JUN 2024 | 06243222 | Dallas District | US 75 Traffic signal improvements from VARIOUS LOCATIONS to IN THE CITY OF DALLAS/RICHARDSON | 2 of 4 | $8,301,064 | +1.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.