TxDOT contract A00212930 bid tabulation
Install Traffic Signal, SL 12 (South of John West to Tillman Street). Let by Texas DOT on May 2, 2025, Dallas, Dallas District. 5 bids received; low bid $3,099,433 by Select Maintenance, L.L.C., -12% against the engineer's estimate of $3,518,014.
- Owner
- Texas DOT
- Letting
- 02 MAY 2025
- Pay items
- 102
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Select Maintenance, L.L.C. | $3,099,433 | Low | -12% |
| 2 | WG Engineering & Construction, LLC | $3,394,629 | +10% | -4.0% |
| 3 | Grey Sky Construction LLC | $3,773,319 | +22% | +7.0% |
| 4 | Durable Specialties, Inc. | $3,848,286 | +24% | +9.0% |
| 5 | American Lighting and Signalization, LLC | $4,193,636 | +35% | +19% |
Engineer's estimate: $3,518,014.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Select Maintenance, L.L.C. | 2. WG Engineering & Construction, LLC | 3. Grey Sky Construction LLC | 4. Durable Specialties, Inc. | 5. American Lighting and Signalization, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (medians) (104-7008) | SY | 311 | $57.00 | $45.00 | $101.60 | $50.00 | $110.00 | $406.44 |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 329 | $35.00 | $39.00 | $82.60 | $50.00 | $90.00 | $203.22 |
| 3 | Removing concrete (curb) (104-7016) | LF | 39 | $20.00 | $22.00 | $76.20 | $50.00 | $80.00 | $101.61 |
| 4 | Excavation (roadway) (110-7001) | CY | 75 | $90.00 | $200.00 | $254.00 | $100.00 | $110.00 | $152.41 |
| 5 | SP mixes SP-B sac-B PG64-22 (344-7002) | TON | 28 | $300.00 | $400.00 | $983.90 | $200.00 | $70.00 | $812.87 |
| 6 | SP mixes SP-C PG64-22 (344-7009) | TON | 132 | $230.00 | $400.00 | $857.00 | $250.00 | $80.00 | $812.87 |
| 7 | Tack coat (344-7077) | GAL | 49 | $4.00 | $20.00 | $9.30 | $10.00 | $55.00 | $304.82 |
| 8 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 44 | $615.00 | $360.00 | $495.00 | $450.00 | $915.00 | $602.50 |
| 9 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 91 | $650.00 | $475.00 | $780.00 | $550.00 | $1,020.00 | $844.36 |
| 10 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 264 | $900.00 | $560.00 | $1,100.00 | $650.00 | $1,290.00 | $1,067.07 |
| 11 | Riprap (concrete)(4 in) (432-7001) | CY | 2 | $775.00 | $2,500.00 | $2,539.10 | $650.00 | $2,650.00 | $1,422.53 |
| 12 | Riprap (concrete)(6 in) (432-7003) | CY | 8 | $800.00 | $2,500.00 | $2,539.10 | $850.00 | $2,800.00 | $1,625.73 |
| 13 | Mobilization (500-7001) | LS | 1 | $319,836 | $310,000 | $325,940 | $300,000 | $375,000 | $220,793 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $25,000 | $29,500 | $14,007 | $8,500.00 | $15,000 | $3,809.65 |
| 15 | Portable changeable message sign (503-7001) | DAY | 50 | $150.00 | $75.00 | $127.00 | $150.00 | $80.00 | $175.00 |
| 16 | TMA (stationary) (505-7001) | DAY | 205 | $315.00 | $140.00 | $300.00 | $250.00 | $750.00 | $675.07 |
| 17 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 250 | $14.00 | $6.00 | $9.00 | $18.00 | $2.00 | $25.05 |
| 18 | Biodegradable erosion control logs (remove) (506-7046) | LF | 250 | $7.00 | $1.00 | $4.00 | $9.00 | $1.00 | $10.11 |
| 19 | Concrete curb (type II) (529-7002) | LF | 604 | $40.00 | $26.00 | $101.60 | $60.00 | $110.00 | $121.93 |
| 20 | Concrete curb (mono) (type II) (529-7007) | LF | 179 | $8.00 | $26.00 | $50.80 | $15.00 | $55.00 | $203.22 |
| 21 | Concrete curb & gutter (type I) (529-7008) | LF | 36 | $75.00 | $70.00 | $127.00 | $65.00 | $135.00 | $875.00 |
| 22 | Concrete sidewalks (4") (531-7001) | SY | 269 | $75.00 | $105.00 | $190.50 | $65.00 | $200.00 | $304.82 |
| 23 | Curb ramps (type 1) (531-7005) | EACH | 2 | $3,125.00 | $2,500.00 | $6,220.80 | $3,850.00 | $6,500.00 | $8,128.76 |
| 24 | Curb ramps (type 2) (531-7006) | EACH | 3 | $3,800.00 | $2,500.00 | $6,347.70 | $3,850.00 | $6,800.00 | $8,128.76 |
| 25 | Curb ramps (type 5) (531-7008) | EACH | 10 | $5,000.00 | $2,800.00 | $7,363.30 | $3,850.00 | $7,900.00 | $8,128.76 |
| 26 | Curb ramps (type 7) (531-7010) | EACH | 12 | $3,250.00 | $3,000.00 | $6,347.70 | $3,850.00 | $6,800.00 | $8,128.76 |
| 27 | Curb ramps (type 10) (531-7011) | EACH | 1 | $3,250.00 | $3,200.00 | $6,220.80 | $3,850.00 | $6,500.00 | $10,161 |
| 28 | Curb ramps (type 21) (531-7013) | EACH | 2 | $3,500.00 | $4,000.00 | $7,617.20 | $3,850.00 | $8,100.00 | $10,161 |
| 29 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 496 | $29.00 | $21.00 | $22.80 | $30.00 | $37.00 | $35.00 |
| 30 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 932 | $36.00 | $21.00 | $26.00 | $40.00 | $41.00 | $45.00 |
| 31 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 1,968 | $60.00 | $45.00 | $34.00 | $70.00 | $74.00 | $58.00 |
| 32 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 581 | $69.00 | $22.00 | $30.00 | $60.00 | $43.00 | $51.51 |
| 33 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 1,968 | $70.00 | $45.00 | $40.00 | $80.00 | $77.00 | $92.51 |
| 34 | Electrical conductor (no.12) insulated (620-7004) | LF | 1,840 | $2.75 | $1.50 | $2.00 | $3.00 | $3.00 | $2.92 |
| 35 | Electrical conductor (no.8) insulated (620-7008) | LF | 4,095 | $3.00 | $2.00 | $3.00 | $3.00 | $4.00 | $9.85 |
| 36 | Electrical conductor (no.6) bare (620-7009) | LF | 5,914 | $3.25 | $2.20 | $3.00 | $3.00 | $5.00 | $9.58 |
| 37 | Electrical conductor (no.6) insulated (620-7010) | LF | 508 | $3.50 | $2.50 | $4.00 | $3.00 | $5.00 | $9.58 |
| 38 | Electrical conductor (no.4) insulated (620-7012) | LF | 328 | $5.00 | $3.20 | $5.00 | $3.00 | $6.00 | $10.25 |
| 39 | ITS GND box (poly) type 1 (243624)W/aprn (623-7014) | EACH | 5 | $4,000.00 | $3,000.00 | $4,359.60 | $3,000.00 | $6,000.00 | $6,600.00 |
| 40 | Ground box type D (162922) (624-7007) | EACH | 10 | $1,700.00 | $2,000.00 | $1,767.20 | $1,150.00 | $1,900.00 | $1,800.00 |
| 41 | Ground box type D (162922)W/apron (624-7008) | EACH | 23 | $2,000.00 | $3,000.00 | $2,188.70 | $1,150.00 | $2,815.00 | $3,000.00 |
| 42 | Elc SRV type D 120/240 100(NS)SS(E)PS(U) (628-7246) | EACH | 5 | $12,000 | $30,000 | $9,121.60 | $12,500 | $12,250 | $11,194 |
| 43 | Aluminum signs (type A) (636-7001) | SF | 338 | $36.00 | $60.00 | $35.00 | $40.00 | $90.00 | $75.00 |
| 44 | Remove SM RD SN sup&AM (644-7073) | EACH | 8 | $450.00 | $60.00 | $167.60 | $250.00 | $250.00 | $540.00 |
| 45 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,225 | $3.75 | $1.50 | $3.90 | $6.00 | $2.00 | $5.08 |
| 46 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 2,599 | $16.00 | $6.50 | $19.10 | $20.00 | $10.00 | $16.26 |
| 47 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 13 | $185.00 | $200.00 | $1,951.30 | $250.00 | $225.00 | $406.44 |
| 48 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 2 | $350.00 | $350.00 | $457.10 | $550.00 | $415.00 | $609.66 |
| 49 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 8 | $275.00 | $250.00 | $380.90 | $500.00 | $230.00 | $406.44 |
| 50 | Pavement sler 6" (666-7347) | LF | 1,664 | $0.65 | $0.20 | $1.30 | $3.00 | $0.25 | $0.10 |
| 51 | Pavement sler 8" (666-7348) | LF | 341 | $2.00 | $0.20 | $2.60 | $6.00 | $0.25 | $0.12 |
| 52 | Pavement sler 24" (666-7352) | LF | 2,557 | $4.25 | $0.60 | $2.60 | $20.00 | $3.00 | $0.24 |
| 53 | Pavement sler (arrow) (666-7353) | EACH | 13 | $150.00 | $25.00 | $95.30 | $250.00 | $20.00 | $40.64 |
| 54 | Pavement sler (word) (666-7354) | EACH | 8 | $150.00 | $25.00 | $120.70 | $250.00 | $25.00 | $40.64 |
| 55 | Pavement sler (double arrow) (666-7356) | EACH | 2 | $60.00 | $35.00 | $152.40 | $500.00 | $40.00 | $60.96 |
| 56 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 1,703 | $1.00 | $1.20 | $3.90 | $3.00 | $1.50 | $4.06 |
| 57 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 2,186 | $1.00 | $0.85 | $3.90 | $3.00 | $1.50 | $4.06 |
| 58 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 4,129 | $1.00 | $0.85 | $3.90 | $3.00 | $1.00 | $4.06 |
| 59 | Reflectorized pavement marker type I-C (672-7002) | EACH | 16 | $4.00 | $5.00 | $7.70 | $6.00 | $5.00 | $12.19 |
| 60 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 49 | $4.25 | $5.00 | $7.70 | $6.00 | $5.00 | $12.19 |
| 61 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 155 | $6.50 | $5.00 | $7.70 | $6.00 | $5.00 | $16.26 |
| 62 | Eliminating existing PM & markers (4") (677-7001) | LF | 717 | $0.70 | $0.60 | $3.90 | $2.00 | $1.00 | $3.05 |
| 63 | Eliminating existing PM & markers (8") (677-7004) | LF | 6 | $1.50 | $1.00 | $5.10 | $6.00 | $2.00 | $6.10 |
| 64 | Eliminating existing PM & markers (12") (677-7006) | LF | 275 | $2.00 | $2.00 | $6.40 | $20.00 | $2.50 | $10.16 |
| 65 | Eliminating existing PM & markers (24") (677-7008) | LF | 312 | $6.00 | $4.00 | $12.70 | $20.00 | $5.00 | $20.32 |
| 66 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 1 | $135.00 | $65.00 | $146.00 | $250.00 | $60.00 | $304.82 |
| 67 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 1 | $200.00 | $100.00 | $241.30 | $500.00 | $110.00 | $406.44 |
| 68 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,858 | $0.20 | $0.07 | $1.30 | $3.00 | $0.10 | $1.02 |
| 69 | Pavement surface preparation for marking (8") (678-7004) | LF | 387 | $0.50 | $0.10 | $1.30 | $6.00 | $0.15 | $1.52 |
| 70 | Pavement surface preparation for marking (24") (678-7008) | LF | 2,629 | $2.00 | $0.30 | $3.90 | $20.00 | $1.00 | $2.02 |
| 71 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 9 | $50.00 | $10.00 | $95.30 | $250.00 | $14.00 | $91.45 |
| 72 | Pavement surface preparation for marking (word) (678-7016) | EACH | 8 | $65.00 | $10.00 | $348.20 | $250.00 | $20.00 | $101.61 |
| 73 | Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005) | EACH | 5 | $50,000 | $75,000 | $65,000 | $35,000 | $35,000 | $25,801 |
| 74 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 79 | $360.00 | $270.00 | $421.50 | $350.00 | $750.00 | $761.61 |
| 75 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 18 | $363.00 | $270.00 | $421.50 | $350.00 | $750.00 | $761.61 |
| 76 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 79 | $360.00 | $270.00 | $421.50 | $350.00 | $750.00 | $761.61 |
| 77 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 28 | $363.00 | $270.00 | $421.50 | $350.00 | $750.00 | $761.61 |
| 78 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 79 | $360.00 | $270.00 | $421.50 | $350.00 | $750.00 | $761.61 |
| 79 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 24 | $363.00 | $270.00 | $421.50 | $350.00 | $750.00 | $761.61 |
| 80 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 44 | $1,500.00 | $1,000.00 | $421.50 | $4,500.00 | $1,400.00 | $1,011.06 |
| 81 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 78 | $325.00 | $220.00 | $198.10 | $300.00 | $285.00 | $243.33 |
| 82 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 14 | $500.00 | $220.00 | $279.30 | $300.00 | $300.00 | $344.94 |
| 83 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 3,150 | $3.50 | $3.30 | $3.00 | $3.00 | $4.00 | $6.52 |
| 84 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 977 | $3.50 | $3.30 | $4.00 | $3.00 | $4.00 | $12.86 |
| 85 | Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036) | LF | 1,095 | $4.00 | $4.50 | $5.00 | $3.00 | $7.00 | $13.06 |
| 86 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 3,495 | $7.00 | $6.00 | $9.00 | $3.00 | $9.00 | $15.88 |
| 87 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 4,655 | $4.00 | $3.00 | $3.00 | $3.00 | $3.00 | $15.88 |
| 88 | Removing RDSD FLSH BCN AM (solar PWRD) (685-7006) | EACH | 2 | $6,300.00 | $1,000.00 | $1,340.70 | $2,500.00 | $2,000.00 | $12,153 |
| 89 | Ins traffic signal PL AM(S)1 arm(24')lum (686-7027) | EACH | 1 | $14,000 | $20,000 | $15,000 | $16,500 | $17,800 | $19,260 |
| 90 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 3 | $26,000 | $22,000 | $16,000 | $18,500 | $18,600 | $21,902 |
| 91 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 6 | $30,000 | $23,000 | $17,200 | $21,000 | $20,100 | $22,308 |
| 92 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 2 | $40,000 | $27,000 | $21,000 | $23,000 | $22,200 | $31,453 |
| 93 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 6 | $55,000 | $40,000 | $37,000 | $62,000 | $41,900 | $52,259 |
| 94 | Ins traffic signal PL AM(S)1 arm(60')lum (686-7063) | EACH | 1 | $60,000 | $41,000 | $38,200 | $63,000 | $42,900 | $55,000 |
| 95 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 3 | $40,000 | $42,000 | $38,000 | $64,000 | $43,900 | $58,000 |
| 96 | Ins traffic signal PL AM(S)2 arm(60-40')lum (686-7247) | EACH | 1 | $75,000 | $52,000 | $45,000 | $70,000 | $52,500 | $66,000 |
| 97 | Pedestrian pole assembly (687-7001) | EACH | 9 | $5,500.00 | $2,000.00 | $3,610.60 | $3,500.00 | $7,000.00 | $2,359.59 |
| 98 | Pedestrian detect push button (APS) (688-7001) | EACH | 44 | $1,700.00 | $1,200.00 | $1,302.60 | $1,850.00 | $1,250.00 | $1,234.41 |
| 99 | Pedestrian detector controller unit (688-7003) | EACH | 5 | $5,750.00 | $6,500.00 | $5,327.00 | $6,500.00 | $5,500.00 | $12,615 |
| 100 | Spot tree trimming / brush removal (752-7002) | LF | 20 | $100.00 | $250.00 | $255.00 | $500.00 | $50.00 | $952.88 |
| 101 | RVDS (presence det)(install only) (6008-7004) | EACH | 24 | $2,000.00 | $850.00 | $1,900.00 | $10,000 | $3,050.00 | $1,627.18 |
| 102 | RVDS (pres and adv)(install only) (6008-7006) | EACH | 10 | $2,000.00 | $850.00 | $1,900.00 | $15,000 | $3,050.00 | $1,627.18 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.