Willis Electric Co., LP: TxDOT bid record
Willis Electric Co., LP submitted 34 bids on Texas DOT contracts in the data, from 09 JAN 2020 to 02 SEP 2026, and was the low bidder on 21 of them (62%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $18,494,384
- Latest bid
- 02 SEP 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 7 | 5 | 71% |
| 2021 | 5 | 3 | 60% |
| 2022 | 4 | 1 | 25% |
| 2023 | 3 | 2 | 67% |
| 2024 | 2 | 2 | 100% |
| 2025 | 8 | 4 | 50% |
| 2026 | 5 | 4 | 80% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Odessa District | 14 | 8 | 57% |
| Abilene District | 12 | 10 | 83% |
| Lubbock District | 3 | 1 | 33% |
| Amarillo District | 2 | 1 | 50% |
| San Angelo District | 2 | 0 | 0% |
| Yoakum | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 31 | 18 (58%) | $2,600.00 | $5,000.00 |
| Electrical conductor (no.8) insulated | 620-7008 | LF | 21 | 17 (81%) | $1.60 | $2.00 |
| Electrical conductor (no.6) bare | 620-7009 | LF | 21 | 16 (76%) | $2.00 | $2.10 |
| TMA (stationary) | 505-7001 | DAY | 30 | 13 (43%) | $200.00 | $230.00 |
| Conduit (PVC) (schedule 40) (2") | 618-7030 | LF | 13 | 12 (92%) | $8.00 | $15.00 |
| Vehicle signal section (12")LED(yel) | 682-7003 | EACH | 23 | 11 (48%) | $350.00 | $300.00 |
| Vehicle signal section (12")LED(red) | 682-7005 | EACH | 21 | 11 (52%) | $350.00 | $300.00 |
| Electrical conductor (no.6) insulated | 620-7010 | LF | 16 | 11 (69%) | $2.00 | $2.50 |
| Conduit (PVC) (schedule 80) (2") | 618-7054 | LF | 14 | 11 (79%) | $15.00 | $15.34 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 17 | 10 (59%) | $1.00 | $1.40 |
| Vehicle signal section (12")LED(green arrow) | 682-7002 | EACH | 17 | 8 (47%) | $350.00 | $300.00 |
| Vehicle signal section (12")LED(green) | 682-7001 | EACH | 17 | 8 (47%) | $350.00 | $300.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Vaca Underground Utilities Inc | 13 | 6 of 13 |
| American Lighting and Signalization, LLC | 10 | 1 of 10 |
| WG Engineering & Construction, LLC | 9 | 1 of 9 |
| Highway Intelligent Traffic Solutions, Inc. | 6 | 1 of 6 |
| Grey Sky Construction LLC | 6 | 1 of 6 |
| 3LW Civil LLC | 5 | 3 of 5 |
| FNH Construction, LLC | 4 | 0 of 4 |
| Yunex LLC | 4 | 1 of 4 |
| Apollo Constructors, Inc. | 3 | 2 of 3 |
| E-Z Bel Construction, LLC | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 SEP 2026 | A00206625 | Abilene District | Hazard Elimination & Safety, SH 36 (at to Maple Street) | 1 of 5 | $280,354 | Low, 3.0% under the second |
| 02 JUL 2026 | A00187816 | Odessa District | Traffic Signal Improvements, Various (US 385 and FM 1882 to .) | 3 of 3 | $1,149,537 | +67% |
| 01 JUL 2026 | A00206626 | Abilene District | Hazard Elimination & Safety, US 84 (SH 208 to FM 1673) | 1 of 6 | $814,950 | Low, 15% under the second |
| 02 JUN 2026 | A00213529 | Abilene District | Signal Improvements,Leds & Gps Clocks, S 14TH ST (South Clack Street to S. Treadaway Blvd) | 1 of 1 | $332,527 | Low |
| 07 JAN 2026 | A00200975 | Odessa District | Hazard Elimination & Safety, CR 42 (CR 1232 to .) | 1 of 3 | $414,647 | Low, 2.0% under the second |
| 02 JUL 2025 | A00193344 | Abilene District | Install Illumination, FM 3438 (IH 20 NORTH FRONTAGE ROAD to NEAR 5 POINTS PARKWAY) | 1 of 4 | $797,375 | Low, 2.0% under the second |
| 01 JUL 2025 | A00193627 | Odessa District | Hazard Elimination & Safety, GRANDVIEW S (Murphy St to BI 20) | 2 of 3 | $2,323,256 | +22% |
| 01 JUL 2025 | A00184068 | Abilene District | Traffic Signal Improvements, S 14TH ST (Sayles Boulevard to .) | 1 of 4 | $643,372 | Low, 19% under the second |
| 01 MAY 2025 | A00196725 | Odessa District | Intersection Improvement, FM 307 (At County Road 1120 to .) | 1 of 3 | $520,378 | Low, 4.0% under the second |
| 04 APR 2025 | A00196729 | Odessa District | Intersection Improvement, SL 464 (At 26th St to .) | 1 of 3 | $185,434 | Low, 49% under the second |
| 04 MAR 2025 | A00196834 | San Angelo District | Install Traffic Signal, BU 67H (At Oxford Dr to .) | 4 of 5 | $584,417 | +29% |
| 07 FEB 2025 | A00178157 | Odessa District | Traffic Signal Improvements, Various (Districtwide to .) | 3 of 3 | $1,479,119 | +30% |
| 06 FEB 2025 | A00193244 | San Angelo District | Rehabilitate Traffic Signal, SH 208 (SH 208 (Armstrong st) to At 19th st) | 3 of 3 | $888,598 | +85% |
| 03 MAY 2024 | 05243230 | Odessa District | VA Traffic signal improvements from DISTRICTWIDE | 1 of 3 | $2,462,826 | Low, 3.0% under the second |
| 02 FEB 2024 | 02243237 | Odessa District | BS 349C Install traffic signal from AT OCCIDENTAL PKWY | 1 of 2 | $353,315 | Low, 43% under the second |
| 02 AUG 2023 | 08233063 | Abilene District | CS Install/replace signs from FORREST AVE to KIRKWOOD ST | 4 of 5 | $232,635 | +16% |
| 01 JUN 2023 | 06233013 | Odessa District | VA Hazard elimination & safety from US 67/FM 1776 to SH 349 | 1 of 3 | $3,569,918 | Low, 2.0% under the second |
| 05 MAY 2023 | 05233239 | Lubbock District | US 70 Hazard elimination & safety from 0.2 MI WEST OF FM 1760 to 0.2 MI EAST OF FM 1760 | 1 of 2 | $1,843,790 | Low, 7.0% under the second |
| 01 DEC 2022 | 12223016 | Lubbock District | VA Traffic signal improvements from VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT | 2 of 2 | $2,815,704 | +3.0% |
| 02 NOV 2022 | 11224001 | Abilene District | IH0020 Illumination maintenance from VARIOUS LOCATIONS IN THE to ABILENE DISTRICT | 1 of 3 | $1,743,650 | Low, 2.0% under the second |
| 30 JUN 2022 | 06223631 | Odessa District | BI 20-B Install flashing beacon from AT CR 117 | 3 of 3 | $1,199,080 | +16% |
| 06 JAN 2022 | 01223029 | Abilene District | FM 700 Install traffic signal from INTERSECTION to 11TH STREEET | 2 of 2 | $590,412 | +8.0% |
| 05 AUG 2021 | 08213262 | Abilene District | US 277 Install flashing beacon from AT SOUTH BU 277F to INTERSECTION | 1 of 1 | $348,082 | Low |
| 02 JUL 2021 | 07213248 | Lubbock District | US 84 Install illumination from FM 3020 INTERSECTION to US 84 INTERSECTION | 2 of 7 | $580,108 | +8.0% |
| 03 JUN 2021 | 06213035 | Abilene District | BU 83-D Flashing beacons from NORTH OF HILL ST to SOUTH OF HILL ST | 1 of 2 | $193,985 | Low, 2.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.