TxDOT contract A00196834 bid tabulation
Install Traffic Signal, BU 67H (At Oxford Dr to .). Let by Texas DOT on March 4, 2025, Tom Green, San Angelo District. 5 bids received; low bid $454,794 by 3LW Civil LLC, +0.0% against the engineer's estimate of $454,765.
- Owner
- Texas DOT
- Letting
- 04 MAR 2025
- Pay items
- 76
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | 3LW Civil LLC | $454,794 | Low | 0.0% |
| 2 | Yunex LLC | $469,949 | +3.0% | +3.0% |
| 3 | E-Z Bel Construction, LLC | $559,879 | +23% | +23% |
| 4 | Willis Electric Co., LP | $584,417 | +29% | +29% |
| 5 | WG Engineering & Construction, LLC | $604,357 | +33% | +33% |
Engineer's estimate: $454,765.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. 3LW Civil LLC | 2. Yunex LLC | 3. E-Z Bel Construction, LLC | 4. Willis Electric Co., LP | 5. WG Engineering & Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 130 | $30.00 | $30.00 | $77.00 | $100.00 | $60.00 | $86.60 |
| 2 | Removing concrete (curb ramp) (104-7015) | SY | 11 | $50.00 | $35.00 | $110.00 | $100.00 | $180.00 | $123.80 |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 195 | $35.00 | $14.50 | $33.00 | $25.00 | $30.00 | $37.20 |
| 4 | Cut & restore asphalt paving (400-7008) | SY | 16 | $180.00 | $300.00 | $330.00 | $750.00 | $300.00 | $507.60 |
| 5 | Flowable backfill (401-7001) | CY | 10 | $515.00 | $550.00 | $1,318.55 | $600.00 | $300.00 | $1,484.50 |
| 6 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 22 | $475.00 | $500.00 | $398.00 | $450.00 | $400.00 | $605.00 |
| 7 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 26 | $500.00 | $550.00 | $477.00 | $500.00 | $500.00 | $961.20 |
| 8 | Riprap (concrete)(4 in) (432-7001) | CY | 18 | $1,000.00 | $750.00 | $825.00 | $1,500.00 | $1,850.00 | $371.20 |
| 9 | Mobilization (500-7001) | LS | 1 | $33,686 | $49,242 | $50,980 | $57,000 | $58,000 | $53,578 |
| 10 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $7,000.00 | $5,116.00 | $1,850.00 | $6,000.00 | $17,500 | $9,309.10 |
| 11 | Portable changeable message sign (503-7001) | DAY | 68 | $175.00 | $185.00 | $85.00 | $125.00 | $75.00 | $152.20 |
| 12 | TMA (stationary) (505-7001) | DAY | 6 | $300.00 | $350.00 | $235.00 | $700.00 | $225.00 | $371.20 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 2 | $350.00 | $0.10 | $851.52 | $0.01 | $225.00 | $371.20 |
| 14 | Sandbags for erosion control (506-7035) | EACH | 8 | $14.00 | $10.00 | $37.05 | $10.00 | $25.00 | $12.40 |
| 15 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 80 | $10.00 | $12.50 | $18.54 | $8.00 | $10.00 | $12.90 |
| 16 | Biodegradable erosion control logs (remove) (506-7046) | LF | 80 | $2.50 | $1.50 | $2.06 | $2.00 | $5.00 | $7.90 |
| 17 | Concrete curb (type II) (529-7002) | LF | 65 | $70.00 | $75.00 | $109.88 | $150.00 | $115.00 | $123.80 |
| 18 | Concrete curb & gutter (type II) (529-7009) | LF | 195 | $100.00 | $75.00 | $71.43 | $150.00 | $65.00 | $80.50 |
| 19 | Concrete sidewalks (4") (531-7001) | SY | 66 | $150.00 | $261.22 | $120.87 | $200.00 | $465.00 | $136.10 |
| 20 | Curb ramps (type 1) (531-7005) | EACH | 2 | $3,000.00 | $2,207.94 | $4,395.09 | $5,000.00 | $4,150.00 | $4,948.30 |
| 21 | Curb ramps (type 7) (531-7010) | EACH | 6 | $3,300.00 | $2,204.95 | $5,494.00 | $5,000.00 | $3,925.00 | $6,185.40 |
| 22 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 105 | $30.00 | $16.00 | $33.50 | $30.00 | $9.00 | $21.20 |
| 23 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 75 | $35.00 | $22.00 | $47.50 | $40.00 | $22.00 | $25.40 |
| 24 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 235 | $40.00 | $25.00 | $31.45 | $50.00 | $30.00 | $67.90 |
| 25 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 250 | $50.00 | $45.00 | $41.65 | $80.00 | $65.00 | $37.70 |
| 26 | Electrical conductor (no.8) bare (620-7007) | LF | 665 | $2.25 | $3.26 | $2.85 | $3.00 | $1.25 | $2.10 |
| 27 | Electrical conductor (no.8) insulated (620-7008) | LF | 70 | $2.00 | $3.77 | $3.10 | $3.00 | $1.50 | $2.20 |
| 28 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 445 | $3.50 | $4.51 | $4.00 | $3.00 | $3.00 | $3.30 |
| 29 | Ground box type D (162922) (624-7007) | EACH | 5 | $1,800.00 | $1,000.00 | $835.00 | $1,800.00 | $1,900.00 | $1,790.30 |
| 30 | Ground box type D (162922)W/apron (624-7008) | EACH | 3 | $2,100.00 | $1,400.00 | $2,206.00 | $2,100.00 | $2,250.00 | $2,201.50 |
| 31 | Remove electrical services (628-7002) | EACH | 1 | $900.00 | $1,500.00 | $412.00 | $800.00 | $450.00 | $786.10 |
| 32 | Elc SRV type D 120/240 060(NS)AL(E)PS(U) (628-7120) | EACH | 1 | $7,000.00 | $10,000 | $4,530.00 | $11,000 | $8,500.00 | $8,070.60 |
| 33 | Aluminum signs (type A) (636-7001) | SF | 61.25 | $60.00 | $100.00 | $38.16 | $77.00 | $30.00 | $40.80 |
| 34 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 119 | $3.60 | $4.80 | $6.60 | $3.00 | $4.50 | $7.50 |
| 35 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 376 | $12.00 | $26.40 | $14.29 | $12.00 | $24.25 | $16.10 |
| 36 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 2 | $350.00 | $498.00 | $330.00 | $450.00 | $455.00 | $371.20 |
| 37 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 2 | $350.00 | $570.00 | $440.00 | $495.00 | $525.00 | $494.90 |
| 38 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 16 | $50.00 | $246.00 | $83.00 | $55.00 | $225.00 | $92.80 |
| 39 | Pavement sler 24" (666-7352) | LF | 376 | $2.00 | $6.00 | $6.60 | $2.00 | $5.50 | $7.50 |
| 40 | Pavement sler (yld tri) (666-7365) | EACH | 16 | $16.50 | $42.00 | $33.00 | $5.00 | $38.50 | $37.20 |
| 41 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 90 | $2.00 | $4.20 | $6.60 | $2.00 | $3.85 | $7.50 |
| 42 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 358 | $5.00 | $1.20 | $6.60 | $2.00 | $1.10 | $7.50 |
| 43 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 356 | $5.00 | $4.20 | $6.60 | $2.00 | $3.85 | $7.50 |
| 44 | Reflectorized pavement marker type I-C (672-7002) | EACH | 10 | $10.00 | $14.20 | $11.00 | $15.00 | $13.25 | $12.40 |
| 45 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 20 | $15.00 | $14.20 | $11.00 | $15.00 | $13.25 | $12.40 |
| 46 | Eliminating existing PM & markers (6") (677-7002) | LF | 24 | $4.00 | $1.20 | $22.00 | $5.00 | $1.10 | $24.80 |
| 47 | Eliminating existing PM & markers (8") (677-7004) | LF | 6 | $5.00 | $1.38 | $22.00 | $5.00 | $1.25 | $810.80 |
| 48 | Eliminating existing PM & markers (24") (677-7008) | LF | 756 | $6.00 | $4.20 | $27.50 | $4.00 | $3.85 | $31.00 |
| 49 | Pavement surface preparation for marking (6") (678-7002) | LF | 804 | $0.75 | $0.12 | $3.30 | $0.10 | $0.11 | $3.80 |
| 50 | Pavement surface preparation for marking (8") (678-7004) | LF | 119 | $1.00 | $0.18 | $4.40 | $0.15 | $0.15 | $5.00 |
| 51 | Pavement surface preparation for marking (24") (678-7008) | LF | 376 | $1.75 | $0.60 | $6.05 | $0.50 | $0.55 | $6.90 |
| 52 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $35.00 | $1.20 | $121.00 | $25.00 | $1.10 | $136.10 |
| 53 | Pavement surface preparation for marking (word) (678-7016) | EACH | 2 | $50.00 | $1.20 | $149.00 | $25.00 | $1.10 | $167.10 |
| 54 | Pavement surface preparation for marking (18")(yld tri) (678-7022) | EACH | 16 | $20.00 | $1.20 | $31.00 | $3.00 | $1.10 | $34.10 |
| 55 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 30 | $5.50 | $1.20 | $4.00 | $3.00 | $1.10 | $3.80 |
| 56 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $62,530 | $65,000 | $61,014 | $65,000 | $85,000 | $84,169 |
| 57 | Removing traffic signals (680-7004) | EACH | 1 | $8,000.00 | $7,500.00 | $11,925 | $12,000 | $20,000 | $8,733.70 |
| 58 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 8 | $395.00 | $300.00 | $371.00 | $300.00 | $350.00 | $383.80 |
| 59 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 4 | $395.00 | $300.00 | $371.00 | $300.00 | $350.00 | $383.80 |
| 60 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 8 | $395.00 | $300.00 | $371.00 | $300.00 | $350.00 | $383.80 |
| 61 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $395.00 | $300.00 | $371.00 | $300.00 | $350.00 | $383.80 |
| 62 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $395.00 | $300.00 | $371.00 | $300.00 | $350.00 | $383.80 |
| 63 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 2 | $395.00 | $300.00 | $371.00 | $300.00 | $350.00 | $383.80 |
| 64 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $900.00 | $700.00 | $666.00 | $700.00 | $800.00 | $164.30 |
| 65 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 6 | $230.00 | $250.00 | $128.00 | $200.00 | $200.00 | $200.00 |
| 66 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 4 | $275.00 | $350.00 | $191.00 | $300.00 | $275.00 | $269.20 |
| 67 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 265 | $3.00 | $4.41 | $3.78 | $4.00 | $3.00 | $5.60 |
| 68 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,445 | $4.00 | $4.96 | $4.34 | $4.00 | $4.00 | $4.50 |
| 69 | Traffic signal CBL (type A)(12 AWG)(20 conductor) (684-7025) | LF | 600 | $7.75 | $9.13 | $7.70 | $12.00 | $12.50 | $12.70 |
| 70 | Ins traffic signal PL AM (S)1 arm(24') (686-7025) | EACH | 1 | $11,000 | $10,500 | $8,966.00 | $14,000 | $10,500 | $13,754 |
| 71 | Ins traffic signal PL AM(S)1 arm(24')lum (686-7027) | EACH | 1 | $17,000 | $13,000 | $11,910 | $17,000 | $14,500 | $15,609 |
| 72 | Ins traffic signal PL AM(S)1 arm(40') (686-7041) | EACH | 1 | $15,000 | $13,750 | $11,549 | $18,000 | $15,500 | $17,123 |
| 73 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 1 | $17,000 | $15,500 | $14,328 | $19,000 | $18,500 | $19,226 |
| 74 | Pedestrian pole assembly (687-7001) | EACH | 5 | $2,250.00 | $3,000.00 | $1,447.00 | $3,100.00 | $3,000.00 | $3,818.10 |
| 75 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $900.00 | $1,050.00 | $730.00 | $1,000.00 | $850.00 | $1,179.70 |
| 76 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $4,000.00 | $5,000.00 | $2,939.00 | $4,000.00 | $5,000.00 | $4,989.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.