TxDOT letting results, February 6, 2025
42 contracts let by Texas DOT on February 6, 2025, $234,591,981 in low bids, a median of 6 bidders per contract. On the 42 with an engineer's estimate, the low bid came in under it 36 times; median low bid -17% against the estimate.
- Owner
- Texas DOT
- Contracts
- 42
- Low bids, total
- $234,591,981
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| A00058906 | Rehabilitate Existing Roadway, SH 171 (US 377 to SH 174) | Fort Worth District | 3 | Jay Mills Contracting, Incorporated | $26,976,280 | $28,257,724 | +5.0% | -17% | TxDOT |
| A00121423 | Preventive Maintenance, IH 10 (Pecos County line to 15.9 miles E of Pecos County line) | San Angelo District | 6 | Kiewit Infrastructure South Co. | $24,564,337 | $25,755,743 | +5.0% | -27% | TxDOT |
| A00129937 | Resurface Roadway, FM 78 (IH 410 to SL 1604) | San Antonio District | 4 | Texas Materials Group, Inc. | $21,789,871 | $21,816,388 | 0.0% | -36% | TxDOT |
| A00033961 | Rehabilitate Existing Roadway, FM 140 (US 57 to IH 35) | San Antonio District | 6 | Hunter Industries, LTD. | $14,824,127 | $15,800,788 | +7.0% | -29% | TxDOT |
| A00067526 | Resurface Roadway, IH 35 (0.010 MI S OF SANCHEZ (SBML) to 0.28 MILES SOUTH OF SHILOH DRIVE) | Laredo District | 4 | Anderson Columbia Co., Inc. | $10,599,420 | $11,203,169 | +6.0% | -6.0% | TxDOT |
| A00130689 | Surfacing/Roadway Restoration, FM 1484 (FM 2432 to SH 105) | Houston District | 6 | Durwood Greene Construction Co. | $8,353,736 | $8,800,196 | +5.0% | -34% | TxDOT |
| A00139289 | Surfacing/Roadway Restoration, SH 288 (SH 36 to Dow Drainage Canal) | Houston District | 3 | Durwood Greene Construction Co. | $8,297,801 | $8,492,076 | +2.0% | +15% | TxDOT |
| A00209061 | Rehabilitate Existing Roadway, BS 31H (BS 19 to SL 7) | Tyler District | 4 | Big Creek Construction, LTD. | $8,087,241 | $8,677,775 | +7.0% | -6.0% | TxDOT |
| A00184154 | Resurface Roadway, US 79 (US 59 to Sabine River) | Atlanta District | 4 | Madden Contracting Company, LLC. | $8,013,112 | $9,156,270 | +14% | -18% | TxDOT |
| A00178600 | Resurface Roadway, IH 10 (South Hackberry St to IH 410) | San Antonio District | 6 | Dean Word Company, LTD. | $7,922,686 | $8,221,539 | +4.0% | -17% | TxDOT |
| A00141080 | Hazard Elimination & Safety, Various (VARIOUS LOCATIONS IN to THE LUBBOCK DISTRICT) | Lubbock District | 7 | L&L Company | $7,105,938 | $7,158,385 | +1.0% | -17% | TxDOT |
| A00184596 | Widen Road - Add Shoulders, SH 71 (0.75 MI W of CR 401 to 0.75 MI E of CR 401) | Austin District | 8 | Hunter Industries, LTD. | $7,072,728 | $7,134,114 | +1.0% | +3.0% | TxDOT |
| A00138685 | Bridge Replacement, SH 25 (SH 25 to At Middle Fork Little Wichita River) | Wichita Falls District | 7 | Altus Construction LLC | $6,506,472 | $6,619,747 | +2.0% | -5.0% | TxDOT |
| A00209375 | Rehabilitate Existing Roadway, FM 455 (East of Marion Rd to US 377) | Dallas District | 8 | Jagoe-Public Company | $5,118,708 | $5,551,685 | +8.0% | -19% | TxDOT |
| A00184778 | Traffic Signal Improvements, SL 12 (At Peavy to In the City of Dallas) | Dallas District | 1 | WG Engineering & Construction, LLC | $5,047,479 | +18% | TxDOT | ||
| A00134101 | Reconstruct Existing Roadway, FM 1829 (US 84 to FM 107) | Waco District | 6 | Big Creek Construction, LTD. | $4,787,272 | $5,167,110 | +8.0% | -14% | TxDOT |
| A00133629 | Highway Improvement, SH 6 (FM 2534, South to One Block North of SH 222) | Childress District | 5 | Zack Burkett Co. | $4,478,136 | $4,492,178 | 0.0% | -22% | TxDOT |
| A00203365 | BUNDLED BID, IH0045 (IH 610 to Montgomery County Line) | Houston District | 4 | Roy Jorgensen Associates, Inc. | $4,149,300 | $4,354,105 | +5.0% | -35% | TxDOT |
| A00207984 | Landscape Development, IH 69 (Fort Bend County Line to Clay Street) | Houston District | 4 | Yellowstone Landscape - Central, Inc. | $3,952,210 | $4,624,991 | +17% | -11% | TxDOT |
| A00064316 | Resurface Roadway, SH 183 (TRAFFIC CIRCLE to MALL CIRCLE) | Fort Worth District | 6 | Foutsco Paving Company, LLC | $3,831,815 | $3,924,556 | +2.0% | -4.0% | TxDOT |
| A00178244 | Highway Improvement, Various (Various locations to Various locations) | Atlanta District | 7 | Stripe-A-Zone, LLC | $3,631,143 | $3,771,508 | +4.0% | -2.0% | TxDOT |
| A00205724 | Bridge Maintenance, IH 45 (IH 45 at Galveston Causeway to .) | Houston District | 5 | Icos Management, LLC | $3,566,080 | $4,411,937 | +24% | +19% | TxDOT |
| A00194183 | Bridge Replacement, AVE H (At Cottonwood Creek to STR# B005-20-002) | Yoakum District | 9 | Scout 5 Construction LLC | $3,170,844 | $3,496,934 | +10% | -16% | TxDOT |
| A00196360 | Preventive Maintenance, Various (Various Locations to Preventative Maintenance FY 25) | Dallas District | 4 | Stripe-A-Zone, LLC | $2,930,055 | $3,562,971 | +22% | -37% | TxDOT |
| A00176113 | Preventive Maintenance, Various (DISTRICTWIDE to .) | Brownwood District | 6 | Stripe-A-Zone, LLC | $2,883,374 | $3,131,035 | +9.0% | -29% | TxDOT |
| A00206281 | Construct Pedestrian Infrastructure, US 90 (FM 481 to Wood St.) | San Antonio District | 10 | Relmco, Inc. | $2,879,646 | $2,988,997 | +4.0% | -11% | TxDOT |
| A00141129 | Surfacing/Roadway Restoration, IH 45 (FM 1960 to Montgomery C/L) | Houston District | 5 | TRP Infrastructure Services, LLC | $2,797,767 | $3,076,339 | +10% | -3.0% | TxDOT |
| A00199805 | Highway Improvement, SH 115 (Sycamore St to CR 133) | Odessa District | 3 of 7 | Jones Bros. Dirt & Paving Contractors, Inc. | $2,658,948 | -7.0% | TxDOT | ||
| A00196776 | Hazard Elimination & Safety, US 59 (0.30 Mi N of Victoria C/L to 0.40 Mi N of Lavaca River) | Yoakum District | 3 | Bear Creek Contracting, LLC | $2,550,268 | $2,615,706 | +3.0% | -7.0% | TxDOT |
| A00212579 | TRAFFIC SIGNAL MAINTENANCE, IH0610 (VARIOUS HWYS IN HOUSTON DISTRICT to VARIOUS HWYS IN HOUSTON DISTRICT) | Houston District | 3 | Lindsey Electric, L.P. | $1,987,328 | $3,481,856 | +75% | -26% | TxDOT |
| A00209377 | Repair Roadway, FM 2499 (FM 1171 to Tarrant County Line) | Dallas District | 6 | Roy Jorgensen Associates, Inc. | $1,920,305 | $2,287,200 | +19% | -22% | TxDOT |
| A00130307 | Surfacing/Roadway Restoration, FM 1960 (FM 2100 to Liberty C/L) | Houston District | 7 | Cornerstone Paving and Construction, L.L.C. | $1,835,597 | $1,943,960 | +6.0% | -28% | TxDOT |
| A00184682 | Hazard Elimination & Safety, FM 624 (1500 FT W OF CR 308 to 1500 FT E OF CR 308) | Corpus Christi District | 6 | Hunter Industries, LTD. | $1,711,943 | $1,984,982 | +16% | -23% | TxDOT |
| A00210094 | ASPHALT, IH0035 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | Austin District | 1 | Ergon Asphalt & Emulsions, Inc. | $1,708,860 | -8.0% | TxDOT | ||
| A00209969 | Hazard Elimination & Safety, Various (DISTRICT WIDE to VARIOUS LOCATIONS) | Tyler District | 5 | Striping Technology, L.P. | $1,665,532 | $1,683,043 | +1.0% | -37% | TxDOT |
| A00206078 | BRIDGE PREVENTATIVE MAINTENANCE, IH0040 (VARIOUS LOCATIONS ~ SEE PLAN SHEETS to VARIOUS LOCATIONS ~ SEE PLAN SHEETS) | Amarillo District | 7 | Built Right Construction of Oklahoma, LLC | $1,595,496 | $1,958,958 | +23% | -20% | TxDOT |
| A00213103 | METAL BEAM GUARD FENCE REPAIR, US0377 (DISTRICT-WIDE to DISTRICT-WIDE) | Brownwood District | 7 | Ross Sa Enterprise LLC | $1,320,359 | $1,344,870 | +2.0% | -33% | TxDOT |
| A00184763 | Intersection Improvement, US 79 (0.2 miles east of FM 2549 to 0.2 miles west of FM 2549) | Bryan District | 7 | Cornerstone Paving and Construction, L.L.C. | $897,290 | $905,552 | +1.0% | +1.0% | TxDOT |
| A00193244 | Rehabilitate Traffic Signal, SH 208 (SH 208 (Armstrong st) to At 19th st) | San Angelo District | 3 | E-Z Bel Construction, LLC | $480,048 | $657,678 | +37% | +11% | TxDOT |
| A00188200 | Install/Replace Signs, Various (VARIOUS LOCATIONS IN BLANCO AND to HAYS COUNTIES.) | Austin District | 7 | The Levy Company, Inc. | $338,134 | $418,991 | +24% | -40% | TxDOT |
| A00203670 | Bridge Maintenance, US 290 (EB at Cottonwood & Big Dry Creeks to .) | Austin District | 13 | BK Field Operations LLC | $304,980 | $306,528 | +1.0% | -27% | TxDOT |
| A00203671 | Bridge Maintenance, SH 29 (AT SAN GABRIEL RIVER to .) | Austin District | 10 | BK Field Operations LLC | $279,317 | $442,714 | +58% | -29% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.