TxDOT contract A00178600 bid tabulation

Resurface Roadway, IH 10 (South Hackberry St to IH 410). Let by Texas DOT on February 6, 2025, Bexar, San Antonio District. 6 bids received; low bid $7,922,686 by Dean Word Company, LTD., -17% against the engineer's estimate of $9,598,054.

Owner
Texas DOT
Letting
06 FEB 2025
Pay items
71
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Dean Word Company, LTD.$7,922,686Low-17%
2Lone Star Paving Company$8,221,539+4.0%-14%
3Texas Materials Group, Inc.$8,720,635+10%-9.0%
4Hunter Industries, LTD.$9,120,145+15%-5.0%
5Clark Construction of Texas, Inc.$9,851,626+24%+3.0%
6Austin Bridge & Road Services, LP$9,919,874+25%+3.0%
TxDOT contract A00178600: bids by rank

Engineer's estimate: $9,598,054.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Dean Word Company, LTD.2. Lone Star Paving Company3. Texas Materials Group, Inc.4. Hunter Industries, LTD.5. Clark Construction of Texas, Inc.6. Austin Bridge & Road Services, LP
1Removing concrete (mowstrip) (104-7003)SY253$35.02$14.00$23.55$28.00$23.10$22.00$9.83
2Removing concrete (riprap) (104-7006)SY1,112$35.02$19.10$28.16$28.00$23.10$22.00$10.04
3D-GR HMA type D PG76-22 (341-7056)TON14,632$95.00$94.00$102.50$104.00$107.80$127.82$125.00
4Tom-C PG76-22 sac-B (347-7002)TON10,179$100.00$108.00$133.00$155.00$135.30$172.87$125.00
5Flexible pavement structure repair(6") (351-7005)SY72,640$50.00$32.85$39.00$45.00$46.16$44.89$51.00
6Planing asphalt concrete pavement(0" to 0.5" micro) (354-7044)SY169,649$1.93$0.25$1.25$0.50$0.93$1.50$0.10
7Planing asphalt concrete pavement (2.5") (354-7082)SY169,649$1.93$2.60$3.00$2.50$2.42$2.75$3.00
8Riprap (concrete)(4 in) (432-7001)CY129$805.04$726.40$665.50$489.00$644.54$625.00$633.15
9Riprap (mow strip)(4 in) (432-7013)CY203$768.77$737.70$715.00$588.00$583.00$595.00$576.16
10Cleaning existing joints (438-7008)LF459$32.33$36.30$36.00$35.00$12.00$33.80$35.00
11Header type expansion joint (454-7009)CF52$522.09$825.40$453.00$442.00$350.00$768.67$442.00
12Joint sealant (454-7010)LF459$32.33$36.30$22.75$22.00$18.00$33.80$22.00
13Adjusting manholes (479-7001)EACH4$2,690.41$1,759.90$2,300.00$500.00$2,600.24$850.00$3,365.15
14Adjusting manholes (water valve box) (479-7007)EACH3$1,485.46$1,391.60$2,300.00$500.00$1,636.58$485.00$3,935.71
15Mobilization (500-7001)LS1$865,614$670,000$240,000$320,000$718,023$577,000$942,000
16Barricades, signs and traffic handling (502-7001)MO9$9,118.89$31,154$2,550.00$10,000$8,497.73$5,000.00$20,055
17TMA (stationary) (505-7001)DAY99$381.77$346.00$256.00$150.00$243.56$100.00$650.00
18TMA (mobile operation) (505-7003)DAY6$632.04$666.50$256.00$100.00$324.75$100.00$650.00
19Temporary sediment control fence (install) (506-7039)LF4,492$4.30$3.80$3.84$3.75$3.50$5.00$3.50
20Temporary sediment control fence (remove) (506-7041)LF4,492$0.88$0.40$1.02$0.50$0.35$0.50$0.35
21Biodegradable erosion control logs (install) (8") (506-7043)LF1,229$5.05$5.10$6.14$6.00$4.75$6.00$4.75
22Biodegradable erosion control logs (remove) (506-7046)LF1,229$2.70$0.90$1.02$0.50$0.85$0.50$0.85
23Metal W-beam guard fence (timber post) (540-7001)LF3,275$29.06$23.60$26.11$23.50$22.71$31.00$22.00
24Metal W-beam guard fence (steel post) (540-7002)LF100$29.06$30.10$92.14$80.00$28.91$38.00$28.00
25Downstream anchor terminal section (540-7015)EACH14$1,507.06$1,396.00$1,356.58$1,350.00$1,342.12$1,650.00$1,300.00
26Remove metal beam guard fence (542-7001)LF3,525$3.77$2.70$4.10$1.50$2.58$2.00$2.50
27Remove terminal anchor section (542-7002)EACH14$219.72$268.50$204.77$125.00$258.10$225.00$250.00
28Guardrail end treatment (install) (544-7001)EACH16$3,492.37$3,167.80$3,429.84$3,100.00$3,045.59$3,500.00$2,950.00
29Guardrail end treatment (remove) (544-7003)EACH7$361.20$268.50$255.96$175.00$258.10$250.00$250.00
30Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH110$766.10$644.30$665.49$655.00$603.45$750.00$600.00
31Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH175$904.62$751.70$767.87$840.00$704.03$800.00$700.00
32Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH23$1,017.77$891.30$844.66$1,075.00$834.77$850.00$830.00
33Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH19$1,017.77$936.40$895.85$975.00$877.01$900.00$872.00
34Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH5$1,195.06$1,020.10$972.64$1,185.00$955.46$1,050.00$950.00
35Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032)EACH3$1,195.06$1,047.00$1,023.83$1,240.00$980.61$950.00$975.00
36Install small roadside sign support and assembly TYS80(1)SA(U-2EXT) (644-7033)EACH3$1,195.06$1,131.80$1,075.02$1,225.00$1,060.06$950.00$1,054.00
37Install small roadside sign support and assembly TYS80(2)SA(P) (644-7048)EACH10$1,000.00$1,637.60$1,561.34$1,800.00$1,533.77$1,150.00$1,525.00
38Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049)EACH11$1,000.00$1,932.90$1,842.90$1,880.00$1,810.35$1,400.00$1,800.00
39In bridge MNT clearance sign assembly(type N) (644-7061)EACH35$1,000.00$2,169.10$2,559.58$2,020.00$3,520.13$950.00$2,500.00
40Remove SM RD SN sup&AM (644-7073)EACH394$115.67$91.30$84.47$90.00$85.49$85.00$85.00
41Install delineator assembly (D-DW)SZ 1(BRF)GF2 (658-7048)EACH7$25.87$30.10$30.72$28.00$28.16$35.00$28.00
42Install delineator assembly (D-DY)SZ 1(BRF)GF2 (658-7052)EACH63$25.87$30.10$30.71$28.00$28.16$35.00$28.00
43Remove delin & object marker assms (658-7078)EACH52$27.55$16.10$15.36$18.00$15.09$25.00$15.00
44Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH9,372$3.15$3.50$0.77$1.50$1.63$1.00$2.50
45Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF160$2.54$2.20$2.05$1.75$1.75$2.50$1.75
46Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF252$3.24$2.20$2.05$1.75$1.75$3.50$1.75
47Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF12,188$1.80$1.60$1.28$1.00$1.00$1.25$1.00
48Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF7,058$11.25$5.90$5.63$7.50$7.50$8.00$7.50
49Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH53$213.44$107.40$102.38$125.00$125.00$100.00$125.00
50Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH19$248.63$161.10$153.57$150.00$150.00$175.00$150.00
51Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH52$229.69$134.20$127.98$175.00$175.00$125.00$175.00
52Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081)EACH2$579.77$483.20$460.73$450.00$450.00$550.00$450.00
53Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087)EACH97$62.31$37.60$35.83$50.00$50.00$20.00$50.00
54Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH10$65.86$53.70$51.19$75.00$75.00$25.00$75.00
55Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF861$14.60$5.90$5.63$7.50$7.50$8.00$7.50
56Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132)EACH8$448.41$375.80$358.34$175.00$175.00$450.00$175.00
57Type I high perf PM (W)6"(broken)(100MIL) (666-7290)LF7,758$1.64$1.10$1.08$0.70$0.70$1.60$0.70
58Type I high perf PM (W)6"(solid)(100MIL) (666-7293)LF21,712$1.94$1.00$0.97$0.65$0.65$1.60$0.65
59Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF45,934$1.94$1.00$0.97$0.65$0.65$1.60$0.65
60Pavement sler 6" (666-7347)LF75,564$0.48$0.40$0.28$0.25$0.25$0.75$0.25
61Pavement sler 8" (666-7348)LF12,440$0.72$0.50$0.51$0.35$0.35$0.85$0.35
62Pavement sler 24" (666-7352)LF7,919$4.13$3.50$3.07$2.50$2.50$5.00$2.50
63Pavement sler (arrow) (666-7353)EACH53$92.63$63.30$58.87$45.00$45.00$50.00$45.00
64Pavement sler (word) (666-7354)EACH52$106.33$76.60$63.82$50.00$50.00$65.00$50.00
65Pavement sler (double arrow) (666-7356)EACH19$126.34$120.00$114.41$60.00$60.00$60.00$60.00
66Pavement sler (RR crossing) (666-7364)EACH2$200.00$214.80$204.77$150.00$150.00$125.00$150.00
67Pavement sler (yld tri) (666-7365)EACH107$23.38$26.80$25.60$15.00$15.00$15.00$15.00
68Reflectorized pavement marker type I-C (672-7002)EACH1,035$7.70$6.20$5.63$4.50$4.50$5.00$4.50
69Reflectorized pavement marker type II-A-A (672-7004)EACH432$7.57$6.20$5.63$4.50$4.50$5.00$4.50
70Underseal course (3006-7001)GAL48,458$5.72$4.26$3.85$4.00$4.07$4.60$3.75
71Bonding course (3007-7001)GAL33,929$5.72$4.26$3.85$3.50$3.25$3.70$3.75
TxDOT contract A00178600: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of February 6, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy