Lone Star Paving Company: TxDOT bid record
Lone Star Paving Company submitted 283 bids on Texas DOT contracts in the data, from 06 FEB 2020 to 17 NOV 2026, and was the low bidder on 81 of them (29%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $276,909,375
- Latest bid
- 17 NOV 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 23 | 9 | 39% |
| 2021 | 48 | 5 | 10% |
| 2022 | 37 | 15 | 41% |
| 2023 | 31 | 12 | 39% |
| 2024 | 32 | 13 | 41% |
| 2025 | 57 | 16 | 28% |
| 2026 | 55 | 11 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Austin District | 129 | 61 | 47% |
| San Antonio District | 56 | 6 | 11% |
| Yoakum District | 40 | 1 | 3% |
| Waco District | 24 | 4 | 17% |
| Brownwood District | 14 | 2 | 14% |
| Bryan District | 8 | 3 | 38% |
| Corpus Christi District | 8 | 2 | 25% |
| Abilene District | 2 | 1 | 50% |
| San Angelo District | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Barricades, signs and traffic handling | 502-7001 | MO | 191 | 73 (38%) | $3,275.76 | $5,000.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 169 | 69 (41%) | $4.75 | $5.00 |
| Work zone pavement marking SHT terminal (tab)type W | 662-7112 | EACH | 166 | 64 (39%) | $1.05 | $1.45 |
| Reflectorized pavement marker type I-C | 672-7002 | EACH | 145 | 58 (40%) | $5.20 | $5.00 |
| Reflectorized pavement marking type I (W)8"(solid)(100MIL) | 666-7024 | LF | 112 | 58 (52%) | $1.00 | $1.10 |
| Portable changeable message sign | 503-7001 | DAY | 143 | 56 (39%) | $85.00 | $100.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 102 | 54 (53%) | $5.00 | $4.00 |
| Work zone pavement marking SHT terminal (tab)type Y-2 | 662-7114 | EACH | 125 | 51 (41%) | $1.05 | $1.41 |
| Reflectorized pavement marking type I (W)24"(solid)(100MIL) | 666-7036 | LF | 117 | 51 (44%) | $8.60 | $8.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 97 | 47 (48%) | $2.00 | $1.40 |
| TMA (mobile operation) | 505-7002 | HR | 87 | 47 (54%) | $56.00 | $78.00 |
| Bonding course | 3084-6001 | GAL | 71 | 45 (63%) | $3.75 | $4.11 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Texas Materials Group, Inc. | 242 | 116 of 242 |
| Hunter Industries, LTD. | 149 | 47 of 149 |
| Clark Construction of Texas, Inc. | 96 | 44 of 96 |
| Big Creek Construction, LTD. | 57 | 34 of 57 |
| Colorado Materials, LTD. | 56 | 27 of 56 |
| Brauntex Materials, Inc. | 44 | 35 of 44 |
| Allen Keller Company | 42 | 14 of 42 |
| Dean Word Company, LTD. | 37 | 13 of 37 |
| Knife River Corporation - South | 30 | 11 of 30 |
| Angel Brothers Holdings Corp. | 25 | 7 of 25 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 NOV 2026 | A00223456 | Waco District | HOT-MIX COLD-LAID, SL0121 (VARIOUS LOCATIONS to IN THE WACO DISTRICT) | 1 of 3 | $467,875 | Low, 6.0% under the second |
| 04 NOV 2026 | A00041166 | Brownwood District | Preventive Maintenance, PW (WITHIN LAKE BROWNWOOD STATE PARK to .) | 2 of 6 | $1,683,823 | +8.0% |
| 04 NOV 2026 | A00188206 | Austin District | Resurface Roadway, IH 35 (0.73 MI N of Posey Rd to 0.19 MI S of SH 123) | 5 of 6 | $3,801,261 | +36% |
| 04 NOV 2026 | A00224204 | Waco District | BASE FAILURE PAVEMENT REPAIR, SL0121 (VARIOUS LOCATIONS to WITHIN BELL COUNTY) | 3 of 3 | $1,876,700 | +28% |
| 04 NOV 2026 | A00140672 | Abilene District | Preventive Maintenance, US 277 (SOUTH Y IN HASKELL SOUTHBOUND to JONES COUNTY) | 1 of 9 | $6,732,215 | Low, 16% under the second |
| 03 NOV 2026 | A00224202 | Waco District | BASE FAILURE PAVEMENT REPAIR, FM3476 (VARIOUS LOCATIONS to WITHIN MCLENNAN COUNTY) | 4 of 4 | $3,542,100 | +63% |
| 03 NOV 2026 | A00224203 | Waco District | BASE FAILURE PAVEMENT REPAIR, US0084 (VARIOUS LOCATIONS to ACROSS CORYELL, HAMILTON, & BOSQUE) | 4 of 4 | $2,005,650 | +75% |
| 22 SEP 2026 | A00218608 | Yoakum District | HOT-MIX COLD-LAID, US0183 (DeWitt County to .) | 3 of 3 | $597,000 | +17% |
| 02 SEP 2026 | A00219443 | Austin District | HOT-MIX COLD-LAID, US0281 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | 2 of 4 | $3,005,750 | +7.0% |
| 02 SEP 2026 | A00219444 | Austin District | HOT-MIX COLD-LAID, SH0021 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT) | 2 of 4 | $2,290,500 | +3.0% |
| 02 SEP 2026 | A00197294 | Austin District | Preventive Maintenance, FM 1331 (0.53 MI W of FM 619 to Milam C/L) | 1 of 4 | $2,174,856 | Low, 11% under the second |
| 05 AUG 2026 | A00197422 | San Antonio District | Resurface Roadway, US 57 (Zavala/Frio County Line to FM 140) | 4 of 6 | $8,989,700 | +21% |
| 15 JUL 2026 | A00223039 | Brownwood District | HOT MIX, US0190 (SAN SABA to SAN SABA) | 2 of 4 | $218,000 | +22% |
| 14 JUL 2026 | A00222517 | Bryan District | HOT MIX, SH0036 (Various to Various) | 1 of 3 | $372,300 | Low, 7.0% under the second |
| 01 JUL 2026 | A00220051 | Waco District | HOT MIX, SH0036 (Various locations to Across Coryell and Hamilton Counties) | 3 of 4 | $1,381,000 | +6.0% |
| 01 JUL 2026 | A00220053 | Waco District | HOT MIX, US0084 (Various locations to Across Coryell and Hamilton Counties) | 2 of 4 | $1,247,925 | +4.0% |
| 01 JUL 2026 | A00209381 | San Antonio District | Resurface Roadway, US 87 (Rosillo Creek to FM 1516) | 8 of 8 | $3,556,084 | +54% |
| 01 JUL 2026 | A00072146 | Corpus Christi District | Surfacing/Roadway Restoration, US 59 (330 ft. E of Fort St to SH 239) | 4 of 7 | $2,473,962 | +16% |
| 10 JUN 2026 | A00221779 | Bryan District | HOT MIX, SH0006 (Various to Various) | 3 of 5 | $384,125 | +16% |
| 13 MAY 2026 | A00219000 | Austin District | ASPHALT PAVEMENT REPAIR, RM0150 (Various Locations In to The Austin District) | 1 of 3 | $890,314 | Low, 27% under the second |
| 07 MAY 2026 | A00217203 | Bryan District | MILL AND INLAY, SH0006 (Hearne to Calvert) | 1 of 5 | $2,266,508 | Low, 1.0% under the second |
| 07 MAY 2026 | A00214229 | San Antonio District | Surfacing/Roadway Restoration, SS 536 (Ashley Rd. to IH 410) | 5 of 7 | $1,459,001 | +32% |
| 06 MAY 2026 | A00196395 | Waco District | Resurface Roadway, US 77 (Traffic Circle to FM 3148) | 4 of 4 | $8,080,110 | +36% |
| 06 MAY 2026 | A00217913 | San Antonio District | Repair Roadway, Various (Various Locations on US 90 to In Guadalupe and Medina Counties) | 5 of 5 | $6,147,288 | +39% |
| 07 APR 2026 | A00216740 | Austin District | Preventive Maintenance, FM 619 (FM 1331 to US 79) | 1 of 4 | $1,567,487 | Low, 3.0% under the second |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.