TxDOT contract A00217913 bid tabulation
Repair Roadway, Various (Various Locations on US 90 to In Guadalupe and Medina Counties). Let by Texas DOT on May 6, 2026, Bexar, San Antonio District. 5 bids received; low bid $4,426,974 by Clark Construction of Texas, Inc., -28% against the engineer's estimate of $6,145,410.
- Owner
- Texas DOT
- Letting
- 06 MAY 2026
- Pay items
- 29
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Clark Construction of Texas, Inc. | $4,426,974 | Low | -28% |
| 2 | Texas Materials Group, Inc. | $4,498,593 | +2.0% | -27% |
| 3 | Hunter Industries, LTD. | $4,540,397 | +3.0% | -26% |
| 4 | H. L. Zumwalt Construction, Inc. | $6,141,372 | +39% | 0.0% |
| 5 | Lone Star Paving Company | $6,147,288 | +39% | 0.0% |
Engineer's estimate: $6,145,410.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Clark Construction of Texas, Inc. | 2. Texas Materials Group, Inc. | 3. Hunter Industries, LTD. | 4. H. L. Zumwalt Construction, Inc. | 5. Lone Star Paving Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type B) (134-7002) | STA | 1,604 | $182.82 | $53.00 | $100.00 | $82.50 | $275.00 | $200.00 |
| 2 | Blading (150-7001) | STA | 1,604 | $28.35 | $38.00 | $25.00 | $82.50 | $115.00 | $100.00 |
| 3 | Fog seal (SS-1H or CSS-1H) (315-7006) | GAL | 217,731 | $8.05 | $2.12 | $0.73 | $1.83 | $4.75 | $4.50 |
| 4 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 15,458 | $96.87 | $122.41 | $115.00 | $103.59 | $99.00 | $130.00 |
| 5 | Flexible pavement structure repair(3") (351-7002) | SY | 33,275 | $23.43 | $24.25 | $23.50 | $21.04 | $20.00 | $27.00 |
| 6 | Flexible pavement structure repair(4") (351-7003) | SY | 6,054 | $28.50 | $40.08 | $32.50 | $33.21 | $21.00 | $49.00 |
| 7 | Planing asphalt concrete pavement(0" to 0.5") (354-7030) | SY | 1,088,651 | $0.71 | $0.51 | $0.65 | $0.61 | $0.85 | $0.75 |
| 8 | Mobilization (500-7001) | LS | 1 | $561,026 | $51,000 | $335,000 | $292,035 | $900,000 | $250,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $2,819.51 | $2,706.25 | $6,265.00 | $7,430.87 | $4,500.00 | $3,350.00 |
| 10 | Portable changeable message sign (503-7001) | DAY | 110 | $78.13 | $11.95 | $35.00 | $128.39 | $250.00 | $110.00 |
| 11 | Portable changeable message sign (503-7002) | EACH | 2 | $1,167.01 | $4,779.75 | $3,500.00 | $13,922 | $8,000.00 | $110.00 |
| 12 | TMA (stationary) (505-7001) | DAY | 100 | $152.00 | $89.62 | $25.00 | $170.50 | $200.00 | $310.00 |
| 13 | TMA (mobile operation) (505-7003) | DAY | 10 | $270.47 | $89.62 | $1,000.00 | $909.35 | $800.00 | $310.00 |
| 14 | One-way traffic control (flagger cont) (510-7001) | HR | 450 | $27.09 | $43.02 | $58.00 | $93.50 | $40.00 | $160.00 |
| 15 | One-way traffic control (pilot car) (510-7002) | HR | 450 | $100.00 | $72.89 | $140.00 | $93.50 | $100.00 | $200.00 |
| 16 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 38,203 | $0.21 | $0.18 | $0.20 | $0.21 | $0.25 | $0.20 |
| 17 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 318,332 | $0.19 | $0.18 | $0.19 | $0.20 | $0.20 | $0.20 |
| 18 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 24,057 | $0.40 | $0.25 | $0.35 | $0.37 | $0.28 | $0.25 |
| 19 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 764 | $2.00 | $5.00 | $4.50 | $4.73 | $4.00 | $3.80 |
| 20 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 27 | $40.00 | $75.00 | $90.00 | $94.50 | $110.00 | $100.00 |
| 21 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 1 | $45.00 | $85.00 | $200.00 | $210.01 | $160.00 | $150.00 |
| 22 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 6,970 | $0.34 | $0.18 | $0.20 | $0.21 | $0.25 | $0.20 |
| 23 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 227,450 | $0.27 | $0.18 | $0.19 | $0.20 | $0.20 | $0.20 |
| 24 | Work zone pavement marking non-removing (Y)24"(solid) (662-7042) | LF | 1,081 | $2.50 | $5.00 | $3.00 | $3.15 | $4.00 | $3.80 |
| 25 | Work zone pavement marking non-removing (Y)(med nose) (662-7044) | EACH | 4 | $45.00 | $225.00 | $150.00 | $157.51 | $250.00 | $225.00 |
| 26 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 2,970 | $4.00 | $8.00 | $5.50 | $5.78 | $3.75 | $3.50 |
| 27 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 2,047 | $3.52 | $8.00 | $4.50 | $4.73 | $3.75 | $3.50 |
| 28 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 19,985 | $0.10 | $0.54 | $1.06 | $1.72 | $0.50 | $1.00 |
| 29 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 17,518 | $0.10 | $0.54 | $1.06 | $1.72 | $0.50 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.