TxDOT contract A00196395 bid tabulation

Resurface Roadway, US 77 (Traffic Circle to FM 3148). Let by Texas DOT on May 6, 2026, McLennan, Waco District. 4 bids received; low bid $5,957,588 by Big Creek Construction, LTD., -37% against the engineer's estimate of $9,476,549.

Owner
Texas DOT
Letting
06 MAY 2026
Pay items
67
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Big Creek Construction, LTD.$5,957,588Low-37%
2Texas Materials Group, Inc.$6,777,497+14%-28%
3Knife River Corporation - South$7,289,805+22%-23%
4Lone Star Paving Company$8,080,110+36%-15%
TxDOT contract A00196395: bids by rank

Engineer's estimate: $9,476,549.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Big Creek Construction, LTD.2. Texas Materials Group, Inc.3. Knife River Corporation - South4. Lone Star Paving Company
1Excavation (roadway) (110-7001)CY116$30.00$50.00$68.08$45.00$22.00
2Embankment (final)(OC)(type B) (132-7003)CY87$30.00$50.00$90.35$35.00$24.00
3Broadcast seed (permanent_urban_clay) (164-7004)SY3,000$3.00$0.74$0.77$1.00$1.00
4Broadcast seed (temporary_warm_cool) (164-7007)SY3,000$1.00$0.70$0.78$0.75$1.00
5Vegetative watering (168-7001)TGL49$32.00$30.00$50.00$25.00$77.00
6SP mixes SP-C sac-B PG70-22 (344-7021)TON21,504$140.00$90.00$101.60$112.00$135.00
7Tom-C PG76-22 sac-A (347-7001)TON10,752$150.00$120.00$148.50$164.00$165.00
8Tack coat (347-7011)GAL18,699$3.00$1.00$3.30$2.99$4.00
9Flexible pavement structure repair(11") (351-7010)SY882$85.00$100.00$99.00$141.00$140.00
10Planing asphalt concrete pavement(3") (354-7052)SY191,565$3.00$2.60$3.20$2.49$2.35
11Concrete structure repair (standard) (429-7009)SF413$185.00$75.00$60.00$65.00$60.00
12Riprap (mow strip)(4 in) (432-7013)CY125$700.00$680.00$723.00$620.00$850.00
13Cleaning and sealing existing joints (CL7) (438-7007)LF1,178$55.00$60.00$61.00$50.00$61.00
14Polyester polymer concrete overlay (439-7025)CY251$4,000.00$4,000.00$3,763.00$3,450.00$3,400.00
15Adjusting manholes (479-7001)EACH31$1,500.00$2,200.00$2,250.00$2,100.00$2,500.00
16Adjusting manholes (water valve box) (479-7007)EACH22$650.00$900.00$1,715.00$1,400.00$1,500.00
17Diamond grinding slab (483-7017)SY459$100.00$35.00$70.00$42.00$275.00
18Micromilling concrete slab (1/2 in) (483-7020)SY2,290$60.00$25.00$8.20$11.50$22.00
19Mobilization (500-7001)LS1$865,000$90,000$202,000$330,000$405,000
20Barricades, signs and traffic handling (502-7001)MO5$5,000.00$4,000.00$1,500.00$20,000$23,000
21Portable changeable message sign (503-7002)EACH4$15,000$7,500.00$5,400.00$5,000.00$10,000
22TMA (stationary) (505-7001)DAY109$250.00$350.00$85.19$500.00$275.00
23TMA (mobile operation) (505-7003)DAY5$250.00$700.00$585.00$850.00$275.00
24Rock filter dams (install) (type 3) (506-7003)LF500$70.00$75.00$90.00$25.00$17.00
25Rock filter dams (remove) (506-7011)LF500$20.00$10.00$20.00$8.00$17.00
26Temporary sediment control fence (install) (506-7039)LF2,000$6.00$4.50$3.82$4.00$4.00
27Temporary sediment control fence (remove) (506-7041)LF2,000$1.50$1.00$1.25$1.25$1.50
28Driveways (ACP) (530-7010)SY6,998$150.00$36.00$45.00$62.00$65.00
29Metal W-beam guard fence (steel post) (540-7002)LF1,037.50$38.00$42.00$32.50$32.50$31.00
30Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,800.00$2,500.00$2,700.00$2,900.00$2,100.00
31Downstream anchor terminal section (540-7015)EACH5$1,800.00$1,500.00$1,200.00$1,200.00$1,300.00
32Remove metal beam guard fence (542-7001)LF937.50$8.00$3.00$2.50$2.50$2.00
33Remove terminal anchor section (542-7002)EACH1$600.00$220.00$150.00$150.00$200.00
34Remove downstream anchor terminal (542-7003)EACH4$600.00$220.00$150.00$150.00$200.00
35RM metal beam guard fence trans (thrie-beam) (542-7004)EACH4$400.00$250.00$200.00$200.00$200.00
36Guardrail end treatment (install) (544-7001)EACH9$4,000.00$3,400.00$2,950.00$2,950.00$3,100.00
37Guardrail end treatment (remove) (544-7003)EACH9$500.00$300.00$250.00$250.00$200.00
38Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH20$20.00$30.00$20.00$20.00$32.00
39Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH27$45.00$50.00$45.00$45.00$42.00
40Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF12,280$0.30$0.30$0.25$0.20$0.20
41Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF27,891$0.30$0.25$0.20$0.20$0.20
42Work zone pavement marking non-removing (W)8"(DOT) (662-7010)LF471$0.70$0.45$0.40$0.30$0.30
43Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF2,552$0.70$0.45$0.40$0.30$0.30
44Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF2,121$5.00$4.00$2.00$1.75$1.75
45Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH12$125.00$70.00$50.00$50.00$50.00
46Work zone pavement marking non-removing (W)(uturn arrow) (662-7027)EACH2$125.00$75.00$55.00$100.00$100.00
47Work zone pavement marking non-removing(W)(word) (662-7030)EACH14$225.00$80.00$60.00$50.00$50.00
48Work zone pavement marking non-removing(W)36"(yld tri) (662-7032)EACH5$30.00$20.00$15.00$11.00$11.00
49Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF9,550$0.30$0.30$0.25$0.20$0.20
50Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF43,205$0.30$0.25$0.20$0.20$0.20
51Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH6,960$4.00$1.00$0.95$0.50$1.25
52Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH16,036$4.00$1.00$0.95$0.50$1.25
53Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF471$1.75$1.20$1.00$1.50$15.00
54Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF2,552$1.75$1.10$0.93$0.70$0.70
55Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF2,121$12.00$7.00$6.00$9.65$9.65
56Type I high perf PM (W)6"(broken)(100MIL) (666-7290)LF13,220$1.50$0.60$0.53$0.55$0.55
57Type I high perf PM (W)6"(solid)(100MIL) (666-7293)LF27,891$1.50$0.60$0.50$0.53$0.53
58Type I high perf PM (Y)6"(broken)(100MIL) (666-7302)LF9,550$1.50$0.60$0.53$0.54$0.54
59Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF43,205$1.50$0.60$0.50$0.54$0.54
60Prefabricated PM type C (W)(arrow) (668-7091)EACH12$600.00$250.00$225.00$215.00$215.00
61Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH2$500.00$350.00$275.00$425.00$425.00
62Prefabricated PM type C (W)(word) (668-7103)EACH14$600.00$200.00$155.00$320.00$320.00
63Prefabricated PM type C (W)(18")(yld tri) (668-7110)EACH5$100.00$100.00$75.00$40.00$40.00
64Prefabricated PM type C (multi)(shield) (668-7135)EACH1$3,000.00$1,219.00$1,025.00$2,225.00$2,225.00
65Reflectorized pavement marker type I-C (672-7002)EACH602$6.00$5.00$3.75$5.50$5.50
66Reflectorized pavement marker type II-A-A (672-7004)EACH643$6.00$5.00$3.75$5.50$5.50
67Bonding course (3007-7001)GAL22,438$5.00$1.00$4.00$4.15$4.00
TxDOT contract A00196395: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy