TxDOT contract A00209381 bid tabulation
Resurface Roadway, US 87 (Rosillo Creek to FM 1516). Let by Texas DOT on July 1, 2026, Bexar, San Antonio District. 8 bids received; low bid $2,314,232 by Texas Materials Group, Inc., -10.0% against the engineer's estimate of $2,571,223.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 66
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $2,314,232 | Low | -10% |
| 2 | Clark Construction of Texas, Inc. | $2,477,660 | +7.0% | -4.0% |
| 3 | Hunter Industries, LTD. | $2,658,674 | +15% | +3.0% |
| 4 | Bobcat Services, Inc. | $2,709,164 | +17% | +5.0% |
| 5 | Dean Word Company, LTD. | $2,725,640 | +18% | +6.0% |
| 6 | Allen Keller Company | $2,893,393 | +25% | +13% |
| 7 | H. L. Zumwalt Construction, Inc. | $2,942,152 | +27% | +14% |
| 8 | Lone Star Paving Company | $3,556,084 | +54% | +38% |
Engineer's estimate: $2,571,223.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Clark Construction of Texas, Inc. | 3. Hunter Industries, LTD. | 4. Bobcat Services, Inc. | 5. Dean Word Company, LTD. | 6. Allen Keller Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 590 | $10.50 | $12.00 | $8.00 | $8.80 | $8.50 | $8.25 | $6.26 |
| 2 | Removing concrete (curb) (104-7016) | LF | 100 | $15.00 | $19.00 | $22.00 | $6.60 | $14.00 | $18.00 | $14.41 |
| 3 | Removing concrete (miscellaneous) (104-7046) | SY | 74 | $40.00 | $26.00 | $25.00 | $13.20 | $35.00 | $17.25 | $13.16 |
| 4 | Subgr widen (OC) (112-7003) | SY | 116 | $30.00 | $66.00 | $105.34 | $13.20 | $12.00 | $4.00 | $96.60 |
| 5 | Backfill (type B) (134-7002) | STA | 1 | $215.00 | $400.00 | $579.34 | $115.50 | $960.00 | $416.50 | $2,059.03 |
| 6 | Blading (150-7002) | HR | 8 | $135.00 | $174.00 | $82.00 | $99.00 | $140.00 | $314.00 | $350.86 |
| 7 | D-GR HMA type D PG64-22 (level-UP) (341-7046) | TON | 973 | $120.00 | $109.25 | $116.99 | $94.05 | $122.60 | $138.00 | $112.40 |
| 8 | SP mixes SP-C sac-B PG76-22 (344-7031) | TON | 14,591 | $93.00 | $88.00 | $97.38 | $99.00 | $90.00 | $99.00 | $102.22 |
| 9 | SP mixes SP-C sac-B PG76-22 (exempt) (344-7039) | TON | 14 | $150.00 | $88.00 | $85.63 | $171.60 | $560.00 | $99.00 | $188.54 |
| 10 | Flexible pavement structure repair(5") (351-7004) | SY | 2,679 | $32.00 | $43.75 | $42.41 | $38.10 | $52.00 | $36.00 | $43.24 |
| 11 | Flexible pavement structure repair(6") (351-7005) | SY | 116 | $50.00 | $54.00 | $93.93 | $44.00 | $110.00 | $40.75 | $96.35 |
| 12 | Planing asphalt concrete pavement(0" to 0.5") (354-7030) | SY | 126,878 | $0.40 | $0.50 | $0.20 | $0.44 | $0.46 | $0.45 | $0.97 |
| 13 | Planing asphalt concrete pavement(2") (354-7051) | SY | 126,878 | $1.45 | $1.50 | $1.47 | $1.65 | $1.96 | $1.90 | $1.22 |
| 14 | Riprap (mow strip)(4 in) (432-7013) | CY | 49 | $615.00 | $745.00 | $685.00 | $662.76 | $620.00 | $705.00 | $596.29 |
| 15 | Cleaning and sealing existing joints (438-7001) | LF | 88 | $50.00 | $15.00 | $15.00 | $15.00 | $15.50 | $81.75 | $74.54 |
| 16 | Mobilization (500-7001) | LS | 1 | $229,293 | $57,700 | $32,000 | $187,605 | $250,000 | $175,000 | $275,000 |
| 17 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $7,000.00 | $3,150.00 | $1,840.25 | $5,719.94 | $2,300.00 | $9,282.50 | $3,415.60 |
| 18 | Portable changeable message sign (503-7001) | DAY | 174 | $110.00 | $25.00 | $58.00 | $100.00 | $78.00 | $10.00 | $88.27 |
| 19 | Portable changeable message sign (503-7002) | EACH | 2 | $8,750.00 | $1,500.00 | $1,158.68 | $2,500.00 | $7,050.00 | $8,100.75 | $7,679.90 |
| 20 | TMA (stationary) (505-7001) | DAY | 105 | $205.00 | $25.00 | $90.00 | $125.00 | $360.00 | $268.50 | $268.58 |
| 21 | TMA (mobile operation) (505-7003) | DAY | 10 | $350.00 | $25.00 | $226.00 | $500.00 | $360.00 | $383.75 | $766.36 |
| 22 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,500 | $7.50 | $4.30 | $4.50 | $3.52 | $3.41 | $3.75 | $3.33 |
| 23 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,500 | $0.75 | $0.75 | $0.75 | $1.00 | $0.97 | $1.00 | $0.94 |
| 24 | Metal W-beam guard fence (timber post) (540-7001) | LF | 550 | $25.00 | $24.75 | $40.00 | $26.04 | $25.16 | $28.00 | $24.60 |
| 25 | Downstream anchor terminal section (540-7015) | EACH | 2 | $1,380.00 | $1,350.00 | $800.00 | $1,420.21 | $1,372.32 | $1,521.50 | $1,341.65 |
| 26 | Remove metal beam guard fence (542-7001) | LF | 450 | $3.00 | $1.50 | $4.00 | $1.58 | $1.52 | $1.75 | $1.49 |
| 27 | Remove terminal anchor section (542-7002) | EACH | 2 | $255.00 | $125.00 | $500.00 | $131.50 | $127.07 | $140.75 | $124.22 |
| 28 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,220.00 | $3,485.00 | $3,200.00 | $3,666.24 | $3,542.62 | $3,927.50 | $3,463.43 |
| 29 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $245.00 | $150.00 | $250.00 | $157.80 | $152.48 | $169.00 | $149.07 |
| 30 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 59 | $665.00 | $650.00 | $625.00 | $650.00 | $731.90 | $732.50 | $715.55 |
| 31 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 43 | $760.00 | $700.00 | $675.00 | $700.00 | $797.98 | $789.00 | $780.14 |
| 32 | Install small roadside sign support and assembly type 10BWG(2)SA(P) (644-7017) | EACH | 2 | $1,500.00 | $1,350.00 | $800.00 | $1,350.00 | $1,895.84 | $1,521.50 | $1,853.46 |
| 33 | Install small roadside sign support and assembly TYS80(1)SA(U-2EXT) (644-7033) | EACH | 3 | $1,380.00 | $975.00 | $850.00 | $975.00 | $1,153.77 | $1,098.75 | $1,127.98 |
| 34 | Remove SM RD SN sup&AM (644-7073) | EACH | 108 | $105.00 | $75.00 | $75.00 | $75.00 | $47.27 | $84.50 | $46.21 |
| 35 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001) | EACH | 13 | $30.00 | $37.75 | $50.00 | $15.00 | $38.37 | $17.00 | $37.52 |
| 36 | Install delineator assembly (D-SY)SZ 1(yflx)GF2 (658-7021) | EACH | 13 | $30.00 | $37.75 | $100.00 | $15.00 | $38.37 | $17.00 | $37.52 |
| 37 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 69 | $32.00 | $12.00 | $42.00 | $12.00 | $32.53 | $13.50 | $31.80 |
| 38 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 40 | $25.00 | $11.00 | $50.00 | $11.00 | $32.53 | $12.50 | $31.80 |
| 39 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 23,615 | $0.25 | $0.26 | $0.25 | $0.26 | $0.27 | $0.25 | $0.27 |
| 40 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 7,107 | $0.35 | $0.55 | $0.35 | $0.55 | $0.42 | $0.50 | $0.41 |
| 41 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 2,102 | $3.75 | $2.00 | $3.50 | $2.00 | $2.34 | $2.25 | $2.29 |
| 42 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 22,940 | $0.30 | $0.26 | $0.25 | $0.26 | $0.20 | $0.25 | $0.20 |
| 43 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 9,986 | $0.85 | $1.50 | $0.53 | $1.72 | $1.02 | $2.00 | $3.28 |
| 44 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 3,294 | $0.55 | $1.50 | $0.53 | $1.72 | $1.02 | $2.00 | $3.32 |
| 45 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 149 | $1.15 | $1.00 | $1.50 | $1.00 | $1.63 | $1.25 | $1.59 |
| 46 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 7,107 | $0.95 | $0.84 | $1.25 | $0.84 | $0.91 | $1.00 | $0.90 |
| 47 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 2,102 | $6.75 | $6.40 | $5.90 | $6.40 | $6.71 | $7.25 | $6.56 |
| 48 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 54 | $150.00 | $160.00 | $125.00 | $160.00 | $147.40 | $180.25 | $144.10 |
| 49 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 1 | $245.00 | $180.00 | $175.00 | $180.00 | $180.00 | $202.75 | $178.88 |
| 50 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 49 | $165.00 | $160.00 | $150.00 | $160.00 | $180.00 | $180.25 | $178.88 |
| 51 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 111 | $30.00 | $35.00 | $25.00 | $35.00 | $55.91 | $39.25 | $54.66 |
| 52 | Pavement sler 6" (666-7347) | LF | 70,412 | $0.20 | $0.20 | $0.20 | $0.20 | $0.19 | $0.25 | $0.19 |
| 53 | Pavement sler 8" (666-7348) | LF | 7,107 | $0.40 | $0.21 | $0.35 | $0.21 | $0.37 | $0.25 | $0.36 |
| 54 | Pavement sler 24" (666-7352) | LF | 2,102 | $3.10 | $0.50 | $3.50 | $0.50 | $2.34 | $0.50 | $2.29 |
| 55 | Pavement sler (arrow) (666-7353) | EACH | 54 | $69.25 | $20.00 | $75.00 | $20.00 | $81.32 | $22.75 | $79.50 |
| 56 | Pavement sler (word) (666-7354) | EACH | 49 | $75.50 | $20.00 | $85.00 | $20.00 | $93.52 | $22.75 | $91.43 |
| 57 | Pavement sler (double arrow) (666-7356) | EACH | 1 | $35.00 | $30.00 | $85.00 | $30.00 | $81.32 | $33.75 | $79.51 |
| 58 | Pavement sler (yld tri) (666-7365) | EACH | 111 | $12.00 | $9.00 | $18.00 | $9.00 | $31.50 | $10.25 | $30.81 |
| 59 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 23,615 | $0.60 | $0.53 | $0.60 | $0.53 | $0.65 | $0.50 | $0.64 |
| 60 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 23,708 | $0.60 | $0.53 | $0.60 | $0.53 | $0.58 | $0.50 | $0.57 |
| 61 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 22,940 | $0.55 | $0.54 | $0.60 | $0.54 | $0.58 | $0.50 | $0.57 |
| 62 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 58 | $4.25 | $4.00 | $5.00 | $4.00 | $4.03 | $4.50 | $3.98 |
| 63 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 654 | $4.05 | $3.90 | $5.00 | $3.90 | $4.03 | $4.50 | $3.98 |
| 64 | Underseal course (3006-7001) | GAL | 25,376 | $1.15 | $3.60 | $5.60 | $4.62 | $3.47 | $1.00 | $4.36 |
| 65 | Bonding course (3007-7001) | GAL | 3,241 | $3.75 | $0.01 | $4.55 | $3.30 | $3.47 | $3.70 | $4.37 |
| 66 | Asphalt plug expansion joint (4028-7002) | CF | 123 | $450.00 | $400.00 | $400.00 | $400.00 | $406.61 | $666.75 | $248.45 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.