Allen Keller Company: TxDOT bid record

Allen Keller Company submitted 96 bids on Texas DOT contracts in the data, from 07 FEB 2020 to 06 AUG 2026, and was the low bidder on 26 of them (27%). When it was not low, its total sat a median +19% above the low bid.

Owner
Texas DOT
Low bid volume
$169,256,124
Latest bid
06 AUG 2026
Data through
19 NOV 2026
96Bids
26Low bids
27Win rate, percent
+19%Median gap to the low bid when not low, 70 bids

By year

YearBidsLow bidsWin rate
20208225%
20219556%
202211327%
202320735%
202413431%
202520315%
202615213%
Allen Keller Company, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Austin District431126%
San Angelo District20945%
San Antonio District1800%
Brownwood District14643%
Laredo District100%
Allen Keller Company, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reflectorized pavement marker type I-C672-7002EACH5916 (27%)$4.75$5.00
TMA (stationary)505-7001DAY7513 (17%)$230.00$230.00
Reflectorized pavement marker type II-A-A672-7004EACH7513 (17%)$4.45$5.00
Temporary sediment control fence (remove)506-7041LF4713 (28%)$0.99$1.00
Biodegradable erosion control logs (remove)506-7046LF4112 (29%)$1.15$1.40
Work zone pavement marking non-removing (W)6"(solid)662-7008LF2211 (50%)$0.29$0.39
Reflectorized pavement marking type I (W)(arrow)(100MIL)666-7042EACH3810 (26%)$171.06$165.00
Flexible pavement structure repair(6")351-7005SY2910 (34%)$44.25$60.00
Work zone pavement marking non-removing (Y)6"(solid)662-7038LF2510 (40%)$0.30$0.40
Flexible pavement structure repair(4")351-7003SY1610 (63%)$30.00$42.00
Excavation (roadway)110-7001CY289 (32%)$19.02$20.00
Remove metal beam guard fence542-7001LF269 (35%)$2.41$3.00
Allen Keller Company, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Hunter Industries, LTD.5731 of 57
Texas Materials Group, Inc.5027 of 50
Lone Star Paving Company4228 of 42
Clark Construction of Texas, Inc.3319 of 33
CK Newberry, LLC246 of 24
Dean Word Company, LTD.2310 of 23
Big Creek Construction, LTD.2313 of 23
Acme Bridge Company, Inc.2014 of 20
Angel Brothers Holdings Corp.83 of 8
Bobcat Services, Inc.76 of 7
Allen Keller Company, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
06 AUG 2026A00140254San Angelo DistrictConstruct Rest Area, IH 10 (IH 10 Approx 3 miles Pecos County Line to .)3 of 6$17,441,115+27%
05 AUG 2026A00223027Brownwood DistrictACP OVERLAY, SH0006 (FROM FM 1853 to UPRR IN CISCO)9 of 9$4,003,881+34%
01 JUL 2026A00209381San Antonio DistrictResurface Roadway, US 87 (Rosillo Creek to FM 1516)6 of 8$2,893,393+25%
02 JUN 2026A00215276Brownwood DistrictWiden Road - Add Shoulders, US 183 (MILLS COUNTY LINE to CITY OF LOMETA)6 of 9$5,206,902+15%
06 MAY 2026A00014772Austin DistrictHighway Improvement, SH 29 (RM 1174 SOUTH to WILLIAMSON COUNTY LINE)4 of 8$12,420,418+14%
07 APR 2026A00197417San Antonio DistrictResurface Roadway, SL 368 (IH 410 to New Braunfels Ave)4 of 6$5,210,370+32%
05 MAR 2026A00135150San Antonio DistrictResurface Roadway, SH 211 (FM 1957 to US 90)7 of 8$3,658,576+46%
05 MAR 2026A00209819Austin DistrictPreventive Maintenance, FM 110 (IH 35 to SH 123)4 of 7$1,813,065+15%
04 MAR 2026A00197433San Antonio DistrictResurface Roadway, US 281 (Bulverde Crossing to Bexar/Comal County Line)5 of 6$6,682,244+15%
04 MAR 2026A00197378Austin DistrictPreventive Maintenance, FM 2001 (SH 21 to 0.37 MI N of Satterwhite Rd)4 of 7$1,981,997+11%
04 MAR 2026A00189338San Antonio DistrictResurface Roadway, SH 173 (SH 132 to CR 7711)5 of 11$1,843,752+21%
05 FEB 2026A00188227San Antonio DistrictResurface Roadway, SH 123 (Hays/Guadalupe County Line to FM 758)7 of 7$5,564,516+29%
05 FEB 2026A00218660Brownwood DistrictMILL AND INLAY, US0377 (VARIOUS to VARIOUS)1 of 6$1,025,505Low, 8.0% under the second
04 FEB 2026A00209818Austin DistrictPreventive Maintenance, SL 275 (Braker Lane to Morrow St.)1 of 5$2,185,903Low, 3.0% under the second
04 FEB 2026A00209803Austin DistrictPreventive Maintenance, SH 29 (0.7 MI E of PR 4 to 0.46 MI W of RM 3509)2 of 6$2,975,898+3.0%
03 DEC 2025A00197215Austin DistrictResurface Roadway, SH 95 (US 290 to 0.1 MI S. of FM 2336)3 of 6$2,300,715+12%
09 OCT 2025A00197263Austin DistrictResurface Roadway, US 281 (PR 4 to RM 1855)3 of 6$1,818,773+18%
05 SEP 2025A00209805Austin DistrictSeal Coat, RM 1623 (0.34 MI N of RM 1888 to 0.13 MI W of Trainer Wuest Rd.)7 of 8$703,331+39%
05 SEP 2025A00193132Brownwood DistrictRehabilitate Existing Roadway, SH 16 (Mills County Line to .4 Miles S. of CR 140)1 of 4$11,074,629Low, 7.0% under the second
05 SEP 2025A00197415San Antonio DistrictResurface Roadway, FM 1582 (SH 85 to 0.7 Mi. South of Kothman Rd)7 of 8$3,436,630+40%
08 AUG 2025A00214716Austin DistrictACP OVERLAY, SH0130 (VARIOUS LOCATIONS IN to WILLIAMSON AND TRAVIS COUNTIES)1 of 5$13,801,280Low, 9.0% under the second
08 AUG 2025A00184550Austin DistrictWiden Road - Add Shoulders, SH 29 (0.382 MI W of Algerita Hill Rd to Lehne Rd)1 of 8$10,701,288Low, 5.0% under the second
07 AUG 2025A00214718Austin DistrictACP OVERLAY, SH0130 (VARIOUS LOCATIONS IN to TRAVIS COUNTY)2 of 4$12,180,421+1.0%
02 JUL 2025A00178488Austin DistrictSurfacing/Roadway Restoration, US 87 (Barons Creek to Old Mason Road)4 of 7$9,354,353+2.0%
02 JUL 2025A00134449San Angelo DistrictBridge Replacement, COUNTY ROAD 302 (At South Concho river to .)7 of 8$1,837,417+32%
Allen Keller Company: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy