TxDOT contract A00197417 bid tabulation

Resurface Roadway, SL 368 (IH 410 to New Braunfels Ave). Let by Texas DOT on April 7, 2026, Bexar, San Antonio District. 6 bids received; low bid $3,947,711 by Clark Construction of Texas, Inc., -18% against the engineer's estimate of $4,814,214.

Owner
Texas DOT
Letting
07 APR 2026
Pay items
92
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Clark Construction of Texas, Inc.$3,947,711Low-18%
2Texas Materials Group, Inc.$4,889,951+24%+2.0%
3Lone Star Paving Company$4,957,515+26%+3.0%
4Allen Keller Company$5,210,370+32%+8.0%
5Hunter Industries, LTD.$5,350,448+36%+11%
6Dean Word Company, LTD.$5,691,168+44%+18%
TxDOT contract A00197417: bids by rank

Engineer's estimate: $4,814,214.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Clark Construction of Texas, Inc.2. Texas Materials Group, Inc.3. Lone Star Paving Company4. Allen Keller Company5. Hunter Industries, LTD.6. Dean Word Company, LTD.
1Furn & place topsoil (4") (160-7002)SY3,403$4.00$7.50$5.40$4.00$5.34$4.40$6.10
2Block sodding (162-7002)SY3,403$6.00$7.50$6.95$7.32$6.87$6.70$8.10
3Vegetative watering (168-7001)TGL58$150.00$75.00$55.00$117.06$139.17$23.10$66.70
4D-GR HMA type D PG76-22 (level-UP) (341-7059)TON1,290$92.00$69.76$127.00$199.00$113.71$84.68$100.00
5SP mixes SP-C sac-B HPG (344-7082)TON13,866$92.00$117.87$137.00$139.00$124.74$129.80$161.70
6Flexible pavement structure repair(4") (351-7003)SY38,047$33.00$25.55$27.00$26.00$29.64$32.54$32.30
7Flexible pavement structure repair(6") (351-7005)SY14,256$39.00$39.50$41.15$40.50$44.98$48.65$47.00
8Flexible pavement structure repair(16") (351-7015)SY437$165.00$73.19$116.00$130.50$128.80$134.92$145.50
9Planing asphalt concrete pavement(0" to 0.5" micro) (354-7044)SY120,572$0.50$0.20$0.90$0.50$0.94$0.55$0.50
10Planing asphalt concrete pavement(2") (354-7051)SY120,572$2.00$1.25$2.33$2.00$1.47$2.20$2.00
11Clean existing culverts (480-7001)EACH4$3,650.00$2,500.00$3,100.00$2,666.16$2,798.43$3,200.00$3,244.80
12Mobilization (500-7001)LS1$301,294$34,311$146,000$185,000$495,000$396,904$200,000
13Barricades, signs and traffic handling (502-7001)MO13$15,000$1,623.00$6,700.00$1,645.00$3,159.94$4,041.57$10,000
14Portable changeable message sign (503-7002)EACH2$7,600.00$100.00$1,000.00$7,500.00$11,489$2,706.25$14,698
15TMA (stationary) (505-7001)DAY196$180.00$50.00$25.00$250.00$142.06$81.19$248.10
16TMA (mobile operation) (505-7002)HR56$85.00$25.00$50.00$100.00$73.56$119.08$82.90
17Rock filter dams (install) (type 4) (506-7004)LF369$64.00$36.50$54.00$51.96$52.91$46.35$60.60
18Rock filter dams (remove) (506-7011)LF369$12.00$3.00$7.00$19.95$6.91$10.30$8.10
19Construction exits (install) (type 1) (506-7020)SY112$22.00$0.01$22.40$43.88$22.13$25.75$25.30
20Construction exits (remove) (506-7024)SY112$5.00$0.01$6.80$15.13$6.72$10.30$7.60
21Temporary sediment control fence (install) (506-7039)LF3,914$3.50$6.50$3.50$6.36$3.46$3.14$4.00
22Temporary sediment control fence (remove) (506-7041)LF3,914$1.00$1.00$0.25$1.59$0.25$1.03$0.50
23Biodegradable erosion control logs (install) (12") (506-7044)LF1,499$7.50$3.25$7.45$9.45$7.36$4.89$8.60
24Biodegradable erosion control logs (remove) (506-7046)LF1,499$1.00$0.50$1.00$1.59$0.99$2.06$1.00
25Metal W-beam guard fence (timber post) (540-7001)LF412.50$27.00$27.50$25.55$27.60$29.79$26.65$30.30
26Downstream anchor terminal section (540-7015)EACH3$1,200.00$1,200.00$1,280.00$2,037.43$1,205.34$1,623.00$1,842.90
27Remove metal beam guard fence (542-7001)LF375$2.85$4.00$6.00$2.28$2.97$4.00$4.60
28Remove terminal anchor section (542-7002)EACH6$250.00$300.00$548.00$262.68$217.36$285.00$323.80
29Guardrail end treatment (install) (544-7001)EACH5$3,200.00$3,500.00$3,580.00$3,638.96$3,507.34$3,592.00$4,078.90
30Guardrail end treatment (remove) (544-7003)EACH2$330.00$250.00$405.00$277.53$326.04$315.00$357.70
31Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH67$720.00$720.00$615.00$615.00$657.01$615.00$698.20
32Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH10$805.00$750.00$845.00$845.00$854.61$845.00$959.40
33Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH5$950.00$885.00$950.00$950.00$958.34$950.00$1,079.10
34Relocate SM RD SN sup&AM(sign only) (644-7072)EACH1$600.00$400.00$500.00$200.00$217.36$225.00$851.80
35Remove SM RD SN sup&AM (644-7073)EACH82$113.00$120.00$107.00$107.00$108.68$107.00$121.80
36Install delineator assembly (D-SW)SZ 1(WFLX)GND(BI) (658-7004)EACH43$95.00$85.00$95.00$95.00$47.42$95.00$108.10
37Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH18$40.00$65.00$24.40$30.00$29.64$30.00$33.90
38Install object marker assembly (OM-2Z)(WFLX)GND (658-7058)EACH1$98.00$65.00$95.00$95.00$58.29$95.00$108.10
39Install OM SM RD sign (1-OM-PW)Y (658-7317)EACH68$50.00$65.00$15.00$15.00$34.58$15.00$17.20
40Install OM SM RD sign (1-OM-PW)R (658-7318)EACH13$50.00$65.00$15.00$15.00$34.58$15.00$17.20
41Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF6,746$0.25$0.35$0.37$0.37$0.36$0.37$0.50
42Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF14,547$0.25$0.35$0.22$0.22$0.22$0.22$0.30
43Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF3,141$0.60$0.40$0.54$0.54$0.54$0.54$0.60
44Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF1,102$5.00$5.00$3.40$3.40$3.36$3.40$4.00
45Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH28$150.00$100.00$130.00$130.00$128.44$130.00$147.50
46Work zone pavement marking non-removing (W)(uturn arrow) (662-7027)EACH1$150.00$110.00$215.00$215.00$212.42$215.00$244.00
47Work zone pavement marking non-removing(W)(word) (662-7030)EACH16$150.00$125.00$130.00$130.00$128.44$130.00$147.50
48Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF710$0.30$0.35$0.37$0.37$0.36$0.37$0.50
49Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF4,996$0.30$0.35$0.22$0.22$0.22$0.22$0.30
50Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH932$1.50$0.52$1.00$1.00$3.23$1.63$1.50
51Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH6,696$1.50$0.52$1.00$1.00$3.27$1.63$1.50
52Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF47$1.20$2.50$1.60$1.60$1.58$1.60$2.00
53Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF9,052$0.95$0.95$0.90$0.90$0.89$0.90$1.00
54Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF112$3.25$2.50$3.75$3.75$3.70$3.75$4.00
55Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF4,556$8.00$5.00$7.25$7.25$7.17$7.25$8.10
56Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH91$150.00$125.00$130.00$130.00$128.44$130.00$147.50
57Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051)EACH2$230.00$135.00$200.00$200.00$197.60$200.00$227.30
58Reflectorized pavement marking type I(W)(lane drop arrow)(100MIL) (666-7060)EACH3$470.00$225.00$250.00$250.00$247.00$250.00$283.90
59Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH65$190.00$135.00$160.00$160.00$158.08$160.00$181.90
60Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH18$53.00$25.00$57.00$57.00$56.32$57.00$64.70
61Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF128$8.00$5.00$7.25$7.25$7.17$7.25$8.10
62Pavement sler 6" (666-7347)LF46,573$0.25$0.20$0.22$0.22$0.22$0.22$0.30
63Pavement sler 8" (666-7348)LF9,052$0.40$0.35$0.50$0.50$0.49$0.50$0.50
64Pavement sler 12" (666-7350)LF112$1.05$2.00$1.80$1.80$1.78$1.80$2.00
65Pavement sler 24" (666-7352)LF4,684$2.50$4.00$2.60$2.60$2.56$2.60$3.00
66Pavement sler (arrow) (666-7353)EACH91$45.00$50.00$83.00$82.50$81.51$82.50$93.50
67Pavement sler (word) (666-7354)EACH65$45.00$65.00$95.00$95.00$93.86$95.00$108.10
68Pavement sler (uturn arrow) (666-7358)EACH2$55.00$60.00$115.00$115.00$113.62$115.00$130.90
69Pavement sler (LN reduct arrow) (666-7359)EACH3$145.00$125.00$140.00$140.00$138.32$140.00$159.10
70Pavement sler (yld tri) (666-7365)EACH18$20.00$15.00$32.00$32.00$31.62$32.00$36.40
71Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF7,969$0.56$0.85$0.70$0.70$0.69$0.70$1.00
72Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF30,399$0.56$0.85$0.65$0.65$0.65$0.65$0.70
73Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF1,506$0.56$0.85$0.70$0.70$0.69$0.70$1.00
74Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF6,652$0.56$0.85$0.65$0.65$0.65$0.65$0.70
75Reflectorized pavement marker type I-C (672-7002)EACH530$3.75$5.00$4.00$4.00$3.95$4.00$4.60
76Reflectorized pavement marker type II-A-A (672-7004)EACH1,502$3.75$5.00$4.00$4.00$3.95$4.00$4.60
77Reflectorized pavement marker type II-C-R (672-7006)EACH625$3.75$5.00$4.00$4.00$3.95$4.00$4.60
78Eliminating existing PM & markers (6") (677-7002)LF53$2.00$1.00$1.00$1.00$0.99$1.00$1.00
79Pavement surface preparation for marking (6") (678-7002)LF46,573$0.25$0.01$0.02$0.02$0.02$0.02$0.02
80Pavement surface preparation for marking (8") (678-7004)LF9,052$0.20$0.02$0.05$0.05$0.05$0.05$0.10
81Pavement surface preparation for marking (12") (678-7006)LF112$0.50$0.03$0.25$0.25$0.25$0.25$0.50
82Pavement surface preparation for marking (24") (678-7008)LF4,684$1.50$0.06$0.50$0.50$0.49$0.50$0.50
83Pavement surface preparation for marking (arrow) (678-7009)EACH97$25.00$1.00$11.50$11.50$11.36$11.50$13.10
84Pavement surface preparation for marking (uturn arr) (678-7012)EACH2$25.00$1.00$16.50$16.50$16.31$16.50$18.70
85Pavement surface preparation for marking (word) (678-7016)EACH65$45.00$1.00$13.50$13.50$13.33$13.50$15.20
86Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH18$10.50$1.00$5.50$5.50$5.43$5.50$6.10
87Pavement surface preparation for marking (RPM) (678-7033)EACH2,657$1.25$1.00$0.70$0.70$0.69$0.70$1.00
88Removal of signal head assembly (690-7024)EACH6$150.00$275.00$200.00$1,400.00$1,383.18$293.39$1,589.80
89Install of signal head assembly (690-7026)EACH6$600.00$350.00$1,685.00$1,400.00$1,383.18$2,471.77$1,589.80
90Litter removal (734-7002)CYC20$2,500.00$100.00$250.00$500.00$873.18$2,357.43$875.50
91Debris removing-CNTR med/MN LNS/ramps (735-7002)CYC20$3,700.00$1.00$250.00$500.00$873.18$2,357.43$302.60
92Underseal course (3006-7001)GAL28,414$4.00$0.01$3.70$3.75$5.43$4.62$4.80
TxDOT contract A00197417: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.