TxDOT contract A00197433 bid tabulation
Resurface Roadway, US 281 (Bulverde Crossing to Bexar/Comal County Line). Let by Texas DOT on March 4, 2026, Comal, San Antonio District. 6 bids received; low bid $5,825,981 by Texas Materials Group, Inc., -37% against the engineer's estimate of $9,211,626.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 104
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $5,825,981 | Low | -37% |
| 2 | Lone Star Paving Company | $6,264,913 | +8.0% | -32% |
| 3 | Hunter Industries, LTD. | $6,384,795 | +10% | -31% |
| 4 | Clark Construction of Texas, Inc. | $6,418,431 | +10% | -30% |
| 5 | Allen Keller Company | $6,682,244 | +15% | -27% |
| 6 | Dean Word Company, LTD. | $7,144,012 | +23% | -22% |
Engineer's estimate: $9,211,626.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Lone Star Paving Company | 3. Hunter Industries, LTD. | 4. Clark Construction of Texas, Inc. | 5. Allen Keller Company | 6. Dean Word Company, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A) (134-7006) | LF | 4,998 | $5.00 | $1.50 | $10.00 | $1.30 | $2.59 | $2.44 | $2.50 |
| 2 | Compost manuf topsoil (4") (161-7002) | SY | 729 | $2.00 | $7.25 | $7.25 | $7.25 | $10.75 | $6.95 | $7.75 |
| 3 | Hydro mulch seed (permanent_rural_sandy) (164-7017) | SY | 729 | $0.65 | $7.50 | $1.75 | $1.75 | $2.85 | $1.68 | $1.75 |
| 4 | Vegetative watering (168-7001) | TGL | 12 | $7.50 | $50.00 | $50.00 | $16.35 | $30.00 | $74.86 | $74.25 |
| 5 | D-GR HMA type D PG64-22 (level-UP) (341-7046) | TON | 887 | $100.00 | $99.00 | $100.00 | $56.82 | $125.02 | $90.34 | $125.00 |
| 6 | SP mixes SP-C sac-A PG76-22 (344-7030) | TON | 34,869 | $130.00 | $98.00 | $95.25 | $95.56 | $96.91 | $99.92 | $100.00 |
| 7 | Flexible pavement structure repair(6") (351-7005) | SY | 15,730 | $50.00 | $33.60 | $40.00 | $35.81 | $39.51 | $35.70 | $40.25 |
| 8 | Planing asphalt concrete pavement(0" to 0.5") (354-7030) | SY | 148,019 | $1.42 | $0.25 | $0.31 | $0.35 | $1.02 | $0.75 | $1.25 |
| 9 | Planing asphalt concrete pavement(2") (354-7051) | SY | 303,222 | $1.90 | $1.35 | $1.65 | $1.24 | $1.46 | $0.80 | $1.75 |
| 10 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 510 | $200.00 | $85.00 | $85.00 | $85.00 | $43.00 | $81.46 | $117.00 |
| 11 | Concrete structure repair(deck rep (full depth)) (429-7005) | SF | 600 | $150.00 | $125.00 | $62.50 | $125.00 | $67.00 | $119.80 | $159.75 |
| 12 | Riprap (mow strip)(4 in) (432-7013) | CY | 72 | $615.00 | $675.00 | $518.00 | $750.00 | $690.00 | $551.08 | $551.25 |
| 13 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 1,170 | $40.00 | $33.00 | $33.00 | $33.00 | $33.00 | $31.63 | $48.00 |
| 14 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 630 | $45.00 | $15.00 | $15.00 | $15.00 | $15.00 | $14.38 | $37.25 |
| 15 | Clean and seal existing JTS (strip seal) (438-7014) | LF | 200 | $50.00 | $125.00 | $125.00 | $125.00 | $125.00 | $119.80 | $101.00 |
| 16 | Retrofit rail (type T631) (451-7020) | LF | 1,198 | $150.00 | $125.00 | $113.00 | $185.00 | $154.00 | $62.77 | $120.25 |
| 17 | Header type expansion joint (454-7009) | CF | 100 | $500.00 | $625.00 | $625.00 | $625.00 | $625.00 | $599.00 | $524.75 |
| 18 | Mobilization (500-7001) | LS | 1 | $833,450 | $120,000 | $315,000 | $473,131 | $120,000 | $635,000 | $450,000 |
| 19 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $10,000 | $3,000.00 | $3,275.76 | $3,999.27 | $1,700.00 | $2,531.03 | $13,939 |
| 20 | Portable changeable message sign (503-7002) | EACH | 4 | $9,000.00 | $400.00 | $1,000.00 | $541.25 | $100.00 | $8,212.75 | $10,225 |
| 21 | TMA (stationary) (505-7001) | DAY | 229 | $225.00 | $25.00 | $150.00 | $54.13 | $75.00 | $192.38 | $310.25 |
| 22 | TMA (mobile operation) (505-7003) | DAY | 46 | $200.00 | $75.00 | $150.00 | $135.31 | $75.00 | $764.72 | $134.00 |
| 23 | Temporary sediment control fence (install) (506-7039) | LF | 30 | $4.00 | $5.00 | $10.00 | $10.00 | $5.00 | $9.58 | $10.75 |
| 24 | Temporary sediment control fence (remove) (506-7041) | LF | 30 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $0.96 | $1.00 |
| 25 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 300 | $5.00 | $1.00 | $5.00 | $5.00 | $5.00 | $4.79 | $5.25 |
| 26 | Biodegradable erosion control logs (remove) (506-7046) | LF | 300 | $1.50 | $1.00 | $1.00 | $1.00 | $1.00 | $0.96 | $1.00 |
| 27 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 330 | $50.00 | $23.50 | $70.00 | $43.07 | $145.00 | $73.48 | $14.25 |
| 28 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 1,650 | $7.00 | $12.50 | $23.00 | $11.00 | $62.00 | $19.81 | $12.25 |
| 29 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 330 | $10.00 | $23.50 | $70.00 | $19.05 | $61.00 | $30.98 | $13.75 |
| 30 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 67,945 | $0.17 | $0.19 | $0.10 | $0.18 | $0.18 | $0.17 | $0.25 |
| 31 | Metal W-beam guard fence (timber post) (540-7001) | LF | 975 | $27.00 | $34.12 | $27.00 | $22.15 | $35.00 | $22.04 | $28.75 |
| 32 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 2 | $2,000.00 | $2,166.74 | $1,701.00 | $2,324.02 | $2,500.00 | $1,916.81 | $1,810.25 |
| 33 | Downstream anchor terminal section (540-7015) | EACH | 6 | $1,225.00 | $1,152.63 | $1,133.00 | $1,277.13 | $1,500.00 | $2,683.54 | $1,205.75 |
| 34 | Metal beam guard fence trans (31"-28") (540-7028) | EACH | 8 | $200.00 | $590.44 | $583.00 | $953.76 | $500.00 | $2,108.50 | $620.50 |
| 35 | Remove metal beam guard fence (542-7001) | LF | 850 | $2.80 | $6.00 | $3.50 | $2.30 | $9.00 | $3.83 | $3.75 |
| 36 | Remove terminal anchor section (542-7002) | EACH | 5 | $250.00 | $580.49 | $325.00 | $204.67 | $225.00 | $191.68 | $346.00 |
| 37 | Remove downstream anchor terminal (542-7003) | EACH | 3 | $250.00 | $208.89 | $325.00 | $204.67 | $225.00 | $479.21 | $346.00 |
| 38 | Guardrail end treatment (install) (544-7001) | EACH | 1 | $3,200.00 | $3,228.52 | $3,215.00 | $3,307.45 | $3,500.00 | $4,792.04 | $3,421.50 |
| 39 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 5 | $1,500.00 | $1,000.00 | $685.00 | $767.51 | $685.00 | $1,437.61 | $1,231.25 |
| 40 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $1,000.00 | $500.00 | $160.00 | $767.51 | $160.00 | $958.41 | $620.25 |
| 41 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 1 | $7,500.00 | $3,500.00 | $8,125.00 | $8,033.26 | $8,125.00 | $11,022 | $3,582.25 |
| 42 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 20 | $700.00 | $645.00 | $633.00 | $600.00 | $650.00 | $575.04 | $638.50 |
| 43 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 4 | $813.00 | $750.00 | $751.00 | $650.00 | $700.00 | $622.96 | $691.75 |
| 44 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 159 | $775.00 | $775.00 | $762.00 | $725.00 | $700.00 | $694.85 | $771.50 |
| 45 | Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005) | EACH | 1 | $800.00 | $895.00 | $888.00 | $775.00 | $900.00 | $742.77 | $824.75 |
| 46 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 32 | $1,000.00 | $915.00 | $905.00 | $907.00 | $950.00 | $869.28 | $965.25 |
| 47 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 1 | $790.00 | $675.00 | $688.00 | $600.00 | $650.00 | $575.05 | $638.50 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 13 | $890.00 | $810.00 | $798.00 | $725.00 | $750.00 | $694.85 | $771.50 |
| 49 | Install small roadside sign support and assembly type 10BWG(1)SB(U) (644-7015) | EACH | 2 | $850.00 | $955.00 | $960.00 | $907.00 | $700.00 | $869.27 | $965.25 |
| 50 | Install small roadside sign support and assembly type 10BWG(2)SA(P) (644-7017) | EACH | 1 | $1,200.00 | $1,880.00 | $1,905.00 | $1,460.00 | $1,500.00 | $1,399.28 | $1,553.75 |
| 51 | Install small roadside sign support and assembly type 10BWG(2)SA(P-exal) (644-7018) | EACH | 1 | $1,200.00 | $1,780.00 | $1,700.00 | $1,600.00 | $1,500.00 | $1,533.45 | $1,702.75 |
| 52 | Install small roadside sign support and assembly type 10BWG(2)SB(P) (644-7019) | EACH | 1 | $1,200.00 | $1,980.00 | $2,000.00 | $1,450.00 | $1,500.00 | $1,389.69 | $1,543.25 |
| 53 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 2 | $1,100.00 | $730.00 | $718.00 | $1,205.00 | $750.00 | $1,154.88 | $1,282.50 |
| 54 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,200.00 | $1,190.00 | $1,166.00 | $1,150.00 | $825.00 | $1,102.17 | $1,224.00 |
| 55 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 5 | $1,200.00 | $1,305.00 | $1,200.00 | $1,230.00 | $975.00 | $1,178.84 | $1,309.00 |
| 56 | Install small roadside sign support and assembly TYS80(2)SB(P-exal) (644-7051) | EACH | 2 | $2,300.00 | $2,750.00 | $2,605.00 | $2,000.00 | $1,500.00 | $1,916.81 | $212.75 |
| 57 | Remove SM RD SN sup&AM (644-7073) | EACH | 191 | $110.00 | $100.00 | $88.00 | $90.00 | $85.00 | $86.26 | $95.75 |
| 58 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001) | EACH | 96 | $40.00 | $24.32 | $26.00 | $27.00 | $35.00 | $25.88 | $28.75 |
| 59 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 77 | $100.00 | $55.04 | $45.00 | $110.00 | $190.00 | $105.42 | $117.00 |
| 60 | Install delineator assembly (D-SW)SZ 1(WFLX)SRF(BR) (658-7008) | EACH | 2 | $65.00 | $87.62 | $85.00 | $140.00 | $25.00 | $134.18 | $149.00 |
| 61 | Install delineator assembly (D-SY)SZ 1(yflx)GF2 (658-7021) | EACH | 51 | $35.00 | $24.90 | $22.50 | $27.00 | $30.00 | $25.88 | $28.75 |
| 62 | Install delineator assembly (D-SY)SZ 1(yflx)GND (658-7023) | EACH | 110 | $88.00 | $55.04 | $43.55 | $110.00 | $190.00 | $105.42 | $117.00 |
| 63 | Install delineator assembly (D-SY)SZ 1(yflx)SRF (658-7025) | EACH | 6 | $90.00 | $87.62 | $88.00 | $140.00 | $100.00 | $134.18 | $149.00 |
| 64 | Install delineator assembly (D-DY)SZ 1(yflx)GND (658-7050) | EACH | 25 | $120.00 | $56.95 | $42.00 | $110.00 | $190.00 | $105.42 | $117.00 |
| 65 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 12 | $80.00 | $63.33 | $58.55 | $75.00 | $85.00 | $71.88 | $79.75 |
| 66 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 2 | $100.00 | $63.43 | $60.00 | $110.00 | $190.00 | $105.42 | $117.00 |
| 67 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 7 | $90.00 | $66.57 | $62.00 | $110.00 | $190.00 | $105.43 | $117.00 |
| 68 | Remove delin & object marker assms (658-7078) | EACH | 178 | $25.00 | $11.40 | $10.50 | $10.00 | $10.00 | $9.58 | $10.75 |
| 69 | Inst delineator assembly (D-SW)SZ 1(WFLX)SRFLL(BI) (658-7113) | EACH | 25 | $20.00 | $78.08 | $64.00 | $155.00 | $125.00 | $148.55 | $165.00 |
| 70 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 121 | $30.00 | $17.86 | $31.55 | $18.00 | $65.00 | $17.25 | $19.25 |
| 71 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 125 | $30.00 | $17.85 | $32.00 | $18.00 | $65.00 | $17.25 | $19.25 |
| 72 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 14,843 | $0.30 | $0.24 | $0.19 | $0.40 | $0.19 | $0.38 | $0.50 |
| 73 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 58,684 | $0.30 | $0.24 | $0.19 | $0.29 | $0.19 | $0.27 | $0.30 |
| 74 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 57,068 | $0.30 | $0.24 | $0.19 | $0.29 | $0.19 | $0.27 | $0.30 |
| 75 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 10,241 | $1.00 | $1.00 | $1.00 | $1.06 | $1.00 | $3.20 | $3.00 |
| 76 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 1,063 | $1.00 | $1.25 | $1.00 | $1.45 | $1.00 | $1.39 | $1.50 |
| 77 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 1,212 | $1.75 | $1.35 | $1.50 | $1.50 | $1.50 | $1.44 | $1.50 |
| 78 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 16,041 | $0.95 | $0.85 | $1.00 | $0.80 | $1.00 | $0.77 | $0.85 |
| 79 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 964 | $7.00 | $6.15 | $6.75 | $6.75 | $6.75 | $6.47 | $7.25 |
| 80 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 3 | $650.00 | $1,100.00 | $1,000.00 | $780.00 | $1,000.00 | $747.56 | $830.00 |
| 81 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 2 | $1,000.00 | $1,500.00 | $1,000.00 | $800.00 | $1,000.00 | $766.72 | $851.50 |
| 82 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 185 | $50.00 | $30.00 | $35.00 | $50.00 | $35.00 | $47.92 | $53.25 |
| 83 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 357 | $8.00 | $6.50 | $6.75 | $6.75 | $6.75 | $6.47 | $7.25 |
| 84 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 2,502 | $0.65 | $1.65 | $1.25 | $1.20 | $1.25 | $1.15 | $1.25 |
| 85 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 2,502 | $0.65 | $1.65 | $1.25 | $1.20 | $1.25 | $1.15 | $1.25 |
| 86 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 14,717 | $0.55 | $0.59 | $0.52 | $0.60 | $0.52 | $0.58 | $0.75 |
| 87 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 58,687 | $0.55 | $0.53 | $0.52 | $0.53 | $0.52 | $0.51 | $0.55 |
| 88 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 57,066 | $0.51 | $0.53 | $0.52 | $0.53 | $0.52 | $0.51 | $0.55 |
| 89 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 160 | $20.00 | $13.00 | $30.00 | $10.00 | $30.00 | $9.58 | $10.75 |
| 90 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 134 | $9.50 | $20.00 | $20.00 | $11.00 | $20.00 | $10.54 | $11.75 |
| 91 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 37 | $200.00 | $185.00 | $250.00 | $186.00 | $250.00 | $178.26 | $198.00 |
| 92 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 24 | $300.00 | $275.00 | $350.00 | $200.00 | $350.00 | $191.68 | $212.75 |
| 93 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 6 | $400.00 | $350.00 | $550.00 | $342.00 | $550.00 | $327.77 | $364.00 |
| 94 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 61 | $190.00 | $239.00 | $300.00 | $230.00 | $300.00 | $220.43 | $244.75 |
| 95 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,854 | $4.00 | $3.60 | $4.50 | $3.75 | $4.50 | $3.60 | $4.00 |
| 96 | Eliminating existing PM & markers (6") (677-7002) | LF | 1,220 | $0.20 | $1.50 | $0.95 | $0.30 | $0.95 | $0.29 | $0.25 |
| 97 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,220 | $0.07 | $0.25 | $0.10 | $0.50 | $0.10 | $0.48 | $0.50 |
| 98 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 6 | $1.00 | $0.25 | $1.00 | $1.00 | $1.00 | $0.96 | $1.00 |
| 99 | Spot tree trimming / brush removal (752-7002) | LF | 23,768 | $20.00 | $4.50 | $1.00 | $4.82 | $2.15 | $4.30 | $2.25 |
| 100 | Replace rail element (W-beam) (770-7001) | LF | 150 | $20.00 | $40.00 | $16.80 | $27.01 | $45.00 | $33.54 | $18.00 |
| 101 | Replace SGT object marker (770-7021) | EACH | 11 | $20.00 | $40.00 | $50.00 | $51.17 | $65.00 | $47.92 | $53.25 |
| 102 | Repair (T101) (776-7006) | LF | 150 | $700.00 | $115.00 | $75.00 | $71.63 | $45.00 | $47.92 | $79.75 |
| 103 | Repair (steel post W/ base plate)(T101) (776-7007) | EACH | 15 | $110.00 | $500.00 | $125.00 | $767.51 | $500.00 | $191.68 | $133.00 |
| 104 | Underseal course (3006-7001) | GAL | 63,604 | $3.50 | $0.01 | $3.00 | $3.43 | $4.50 | $4.80 | $4.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.