| 1 | D-GR HMA type D PG76-22 (level-UP) (341-7059) | TON | 28,099 | $150.00 | $126.00 | $92.60 | $109.30 | $170.00 |
| 2 | Tom-C PG76-22 sac-A (347-7001) | TON | 29,782 | $180.00 | $151.00 | $133.14 | $134.60 | $192.00 |
| 3 | Flexible pavement structure repair(6") (351-7005) | SY | 10,678 | $51.25 | $53.00 | $37.89 | $49.94 | $60.00 |
| 4 | Flexible pavement structure repair(24") (351-7023) | SY | 7,549 | $300.00 | $115.00 | $145.68 | $196.21 | $220.00 |
| 5 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 2,066 | $2.75 | $6.55 | $13.45 | $3.52 | $5.00 |
| 6 | Plane & text asphalt concrete pavement(2") (354-7019) | SY | 470,251 | $2.75 | $1.90 | $0.74 | $2.19 | $1.80 |
| 7 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 1,465 | $76.25 | $78.00 | $55.20 | $85.09 | $54.00 |
| 8 | Mobilization (500-7001) | LS | 1 | $1,276,248 | $357,000 | $1,156,000 | $800,994 | $315,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 20 | $5,173.75 | $4,500.00 | $15,415 | $3,907.40 | $35,000 |
| 10 | Portable changeable message sign (503-7001) | DAY | 600 | $125.00 | $10.00 | $99.00 | $43.30 | $110.00 |
| 11 | TMA (stationary) (505-7001) | DAY | 264 | $245.00 | $137.50 | $502.51 | $135.31 | $288.00 |
| 12 | TMA (mobile operation) (505-7003) | DAY | 264 | $358.25 | $100.00 | $774.64 | $162.38 | $288.00 |
| 13 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 18,000 | $4.25 | $1.03 | $3.45 | $3.77 | $5.00 |
| 14 | Biodegradable erosion control logs (remove) (506-7046) | LF | 18,000 | $2.25 | $0.25 | $0.78 | $0.86 | $2.00 |
| 15 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 4,000 | $64.36 | $35.00 | $96.74 | $40.58 | $77.00 |
| 16 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 80 | $75.55 | $75.00 | $120.72 | $73.30 | $81.00 |
| 17 | Portable concrete traffic barrier (stockpile)(low prof)(type 1) (512-7045) | LF | 4,000 | $10.00 | $15.00 | $10.16 | $16.18 | $22.00 |
| 18 | Portable concrete traffic barrier (stockpile)(low prof)(type 2) (512-7046) | LF | 80 | $10.00 | $27.00 | $25.41 | $42.36 | $21.00 |
| 19 | Install delineator assembly (D-DY)SZ 1(yflx)SRF (658-7051) | EACH | 25 | $100.00 | $77.25 | $71.08 | $92.21 | $275.00 |
| 20 | Remove delin & object marker assms (658-7078) | EACH | 25 | $150.00 | $26.00 | $23.92 | $31.04 | $150.00 |
| 21 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 16,299 | $1.50 | $0.25 | $0.23 | $0.25 | $0.25 |
| 22 | Work zone pavement marking non-removing (W)6"(DOT) (662-7006) | LF | 157 | $1.00 | $0.52 | $0.48 | $0.52 | $0.52 |
| 23 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 126,993 | $1.00 | $0.25 | $0.23 | $0.25 | $0.25 |
| 24 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 17,835 | $1.00 | $0.34 | $0.31 | $0.34 | $0.34 |
| 25 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 6,267 | $2.50 | $1.60 | $1.48 | $1.60 | $1.60 |
| 26 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 3,152 | $6.75 | $2.50 | $2.30 | $2.50 | $2.50 |
| 27 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 81 | $113.75 | $45.00 | $41.41 | $45.00 | $45.00 |
| 28 | Work zone pavement marking non-removing (W)(double arrow) (662-7019) | EACH | 10 | $156.50 | $61.00 | $56.12 | $61.00 | $61.00 |
| 29 | Work zone pavement marking non-removing (W)(uturn arrow) (662-7027) | EACH | 3 | $241.00 | $61.00 | $56.13 | $61.00 | $61.00 |
| 30 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 82 | $133.25 | $45.00 | $41.41 | $45.00 | $45.00 |
| 31 | Work zone pavement marking non-removing(W)36"(yld tri) (662-7032) | EACH | 129 | $27.50 | $16.00 | $14.73 | $16.00 | $16.00 |
| 32 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 128,541 | $1.00 | $0.25 | $0.23 | $0.25 | $0.25 |
| 33 | Work zone pavement marking non-removing (Y)12"(solid) (662-7040) | LF | 2,773 | $1.50 | $0.25 | $0.23 | $0.25 | $0.25 |
| 34 | Work zone pavement marking non-removing (Y)24"(solid) (662-7042) | LF | 172 | $4.25 | $2.50 | $2.30 | $2.50 | $2.50 |
| 35 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 12,603 | $1.50 | $1.50 | $1.09 | $1.63 | $1.17 |
| 36 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 6,777 | $1.75 | $1.50 | $2.91 | $1.63 | $1.17 |
| 37 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 157 | $2.00 | $1.06 | $0.97 | $1.06 | $1.06 |
| 38 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 17,835 | $2.25 | $0.61 | $0.56 | $0.61 | $0.61 |
| 39 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 6,267 | $10.00 | $3.40 | $3.13 | $3.40 | $3.40 |
| 40 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 3,152 | $14.75 | $6.10 | $5.61 | $6.10 | $6.10 |
| 41 | Reflectorized pavement marking type I (W)(arrow)(090MIL) (666-7041) | EACH | 81 | $371.75 | $124.00 | $114.10 | $124.00 | $124.00 |
| 42 | Reflectorized pavement marking type I(W)(double arrow)(090MIL) (666-7044) | EACH | 6 | $265.00 | $160.00 | $147.22 | $160.00 | $160.00 |
| 43 | Reflectorized pavement marking type I(W)(uturn arrow)(090MIL) (666-7050) | EACH | 3 | $350.00 | $250.00 | $230.03 | $250.00 | $250.00 |
| 44 | Reflectorized pavement marking type I (W)(word)(090MIL) (666-7065) | EACH | 82 | $426.00 | $160.00 | $147.22 | $160.00 | $160.00 |
| 45 | Ref pavement marking type I(W)36"(yld tri)(090MIL) (666-7089) | EACH | 129 | $57.75 | $43.00 | $39.57 | $43.00 | $43.00 |
| 46 | Reflectorized pavement marking type I (Y)12"(solid)(090MIL) (666-7116) | LF | 2,773 | $11.75 | $3.40 | $3.13 | $3.40 | $3.40 |
| 47 | Reflectorized pavement marking type I (Y)24"(solid)(090MIL) (666-7122) | LF | 172 | $9.50 | $6.10 | $5.61 | $6.10 | $6.10 |
| 48 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 99,242 | $1.25 | $0.77 | $0.71 | $0.77 | $0.77 |
| 49 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 97,067 | $1.75 | $0.77 | $0.71 | $0.77 | $0.77 |
| 50 | Pavement sler 6" (callout) (666-7374) | LF | 13,050 | $0.75 | $0.70 | $0.64 | $0.70 | $0.70 |
| 51 | Pavement sler 10" (callout) (666-7376) | LF | 880 | $1.25 | $0.70 | $0.64 | $0.70 | $0.70 |
| 52 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 16,299 | $1.00 | $0.52 | $0.48 | $0.52 | $0.52 |
| 53 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 34,437 | $1.25 | $0.43 | $0.40 | $0.43 | $0.43 |
| 54 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 37,838 | $1.00 | $0.43 | $0.40 | $0.43 | $0.43 |
| 55 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 880 | $23.50 | $20.50 | $18.86 | $20.50 | $20.50 |
| 56 | Reflectorized pavement marker type I-C (672-7002) | EACH | 744 | $9.50 | $4.30 | $3.96 | $4.30 | $4.30 |
| 57 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,679 | $10.25 | $4.30 | $3.96 | $4.30 | $4.30 |
| 58 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,545 | $9.25 | $4.30 | $3.96 | $4.30 | $4.30 |
| 59 | Eliminating existing PM & markers (4") (677-7001) | LF | 20,868 | $2.50 | $0.52 | $0.48 | $0.52 | $0.52 |
| 60 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,840 | $7.75 | $0.52 | $0.48 | $0.52 | $0.52 |
| 61 | Eliminating existing PM & markers (12") (677-7006) | LF | 890 | $17.00 | $0.52 | $0.48 | $0.52 | $0.52 |
| 62 | Eliminating existing PM & markers (24") (677-7008) | LF | 245 | $10.50 | $0.52 | $0.48 | $0.52 | $0.52 |
| 63 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 13 | $200.50 | $25.00 | $23.00 | $25.00 | $25.00 |
| 64 | Eliminating existing PM & markers (word) (677-7015) | EACH | 13 | $235.50 | $25.00 | $23.00 | $25.00 | $25.00 |
| 65 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 13 | $28.37 | $16.00 | $14.73 | $16.00 | $16.00 |
| 66 | Pavement surface preparation for marking (6") (678-7002) | LF | 19,191 | $0.50 | $0.07 | $0.06 | $0.07 | $0.07 |
| 67 | Pavement surface preparation for marking (8") (678-7004) | LF | 1,840 | $0.50 | $0.07 | $0.06 | $0.07 | $0.07 |
| 68 | Pavement surface preparation for marking (10") (678-7005) | LF | 650 | $0.25 | $0.07 | $0.06 | $0.07 | $0.07 |
| 69 | Pavement surface preparation for marking (12") (678-7006) | LF | 860 | $1.00 | $0.07 | $0.06 | $0.07 | $0.07 |
| 70 | Pavement surface preparation for marking (24") (678-7008) | LF | 245 | $3.14 | $0.07 | $0.06 | $0.07 | $0.07 |
| 71 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 17 | $29.50 | $0.07 | $0.06 | $0.07 | $0.07 |
| 72 | Pavement surface preparation for marking (word) (678-7016) | EACH | 15 | $24.50 | $0.07 | $0.06 | $0.07 | $0.07 |
| 73 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 13 | $16.84 | $0.07 | $0.06 | $0.07 | $0.07 |
| 74 | JT / CRCK seal (rubber - asphalt) (712-7001) | LMI | 11 | $768.25 | $2,275.00 | $4,830.58 | $1,309.11 | $5,000.00 |
| 75 | Underseal course (3006-7001) | GAL | 9,595 | $3.75 | $3.30 | $7.51 | $4.62 | $4.75 |
| 76 | Bonding course (3007-7001) | GAL | 116,155 | $3.50 | $2.90 | $6.06 | $3.52 | $4.00 |